Laserfiche WebLink
yy� <br />r— L/ <br />]SEAFOOD <br />I COOLER I V <br />I�IIlWIT, <br />i <br />RACK 'A' <br />CKT #4C <br />I <br />f <br />MEAT PREP <br />151 MEAT COOLER <br />152 <br />CK 'S' CKT #23A <br />v <br />rz <br />n� <br />I <br />BAKERY <br />132 2 <br />i <br />❑II SS <br />F <br />- <br />�� T <br />BAKERY I f <br />j FREE L <br />i I _ <br />_CTIJ <br />EPI <br />SEATIN� <br />130 <br />CEC ) <br />I D <br />_ T 1 i1 <br />n� I <br />I, <br />i C �JI II F—� <br />IJ— �� 3cJ d <br />II DELI <br />i-2g 1J 2 <br />T�FTFI <br />SS <br />II <br />I <br />U <br />LO (U <1 <br />I CC <br />V <br />v <br />t� <br />I U - <br />U <br />I <br />j I J <br />f I +I, + <br />tl <br />L <br />;LIDO®LEA I FREEZE I � i I <br />+ <br />Ii-- ----- �E <br />—\RACKK 'C' <br />CKT 424A <br />STD RBUCKS <br />1 C�...�—_.----�_ _ 11 <br />I <br />00 <br />SYSTEM 'AA' <br />RACK 'C' CKT #20 <br />@ <br />FT <br />i <br />PRODUCE PREP <br />156 <br />RACK 'C' CKT #18 <br />RACK 'A' CKT t 9 RACK 'A' CKT #9 <br />I— <br />I <br />RACK 'B' LCCKTo <br />I � <br />U <br />v <br />Y <br />U <br />C <br />i <br />i <br />n,l <br />0 KEYNOTES. <br />ALL KEYNOTES MAY NOT APPLY TO THIS SHEET. <br />Architecture - Interiors <br />1. PROVIDE 2-14THHN IN COMMON DEFROST/LIGHTING/FANS CONDUIT FOR EACH SOLENOID OR EPR <br />Planning - Engineering <br />VALVE FOR TEMPERATURE OR DEFROST CONTROL. COORDINATE FINAL INSTALLATION LOCATION <br />OF VALVE WITH REFRIGERATION CONTRACTOR. ROUTE TO INDICATED REFRIGERATION <br />RACK/PROTOCOL AS SHOWN FOR COMMON CONDUIT. WHEN COMMON CONDUIT IS NOT <br />AVAILABLE, PROVIDE 3/4"C UNLESS UNDERGROUND, THEN REFER TO GENERAL NOTE 21. <br />2. SOLENOID VALVE SUPPLIED BY REFRIGERATION SUPPLIER, INSTALL BY REFRIGERATION <br />CONTRACTOR, WIRE BY ELECTRICAL CONTRACTOR. COORDINATE WITH EMS CONTRACTOR FOR <br />Portland, O <br />TERMINATION POINTS AT THE INDICATED RACK. ELECTRICAL CONTRACTOR TO PROVIDE FUSED <br />503.224.9560 <br />OVER CURRENT PROTECTION AT RACK. SEE DETAIL 1/EM2 FOR WIRING SIZING. <br />Vancouver, WA <br />360.695.7879 <br />3. ADDITIONAL J-BOX AND CONDUIT FOR SUCTION SOLENOID WIRE ROUTING FROM COMMON <br />LIGHTING/DEFROST/FANS CONDUIT TO ASSOCIATED RACK/PROTOCOL TERMINATION POINT. <br />Seattle, WA <br />206.749.9993 <br />DESIGN DRIVEN i CLIENT FOCUSED <br />Client <br />FRED MEYER <br />3800 SE22ND AVE <br />PORTLAND, OR 97202 <br />Tl <br />I <br />Project <br />MILL CREEK <br />12906 TH LL- <br />V <br />EVERETT, WA 98208 <br />Mechanical/Electrical <br />per <br />Engineeruig Consultants incorporated <br />303 Federal Way Boise, ID 83705 <br />Phone: 208 76 9920 Fax: 208-376.9822 <br />ww,wecihoisc Com <br />DATE: 02/ 13/2020 <br />MACKENZIE <br />2020 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO BE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />Revision Delta Issue Date <br />