My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12906 19TH AVE SE 2020 Plans 2023-02-24
>
Address Records
>
19TH AVE SE
>
12906
>
Plans
>
12906 19TH AVE SE 2020 Plans 2023-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 8:32:55 AM
Creation date
2/23/2023 4:09:06 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12906
Permit
B2004-018
Year
2020
Notes
WITHIN THE WALLS REMODEL OF EXTG STORE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tiid <br />GENERALDEMO NOTES: <br />A. EQUIPMENT AND DUCTWORK SHOWN DARK AND DASHED TO BE REMOVED. <br />ANY EQUIPMENT AND DUCTWORK SHOWN LIGHTER AND SOLID TO REMAIN. <br />REMOVE AND DISCARD ONLY THE HVAC EQUIPMENT AND DUCTWORK <br />INDICATED, ALL OTHER HVAC EQUIPMENT AND DUCTWORK TO REMAIN AND <br />BE REUSED. <br />B. ALL EQUIPMENT AND DUCTWORK DISCARDED SHALL BE LEGALLY DISPOSED <br />OF TO AND OFF -SITE LOCATION BY THIS CONTRACTOR. <br />C. ALL PATCHING OF ROOF SHALL BE COMPLETED IN ACCORDANCE WITH <br />EXISTING ROOFING SYSTEM REQUIREMENTS AND ROOFING <br />MANUFACTURER'S INSTRUCTIONS AND WARRANTIES. <br />D. REPLACE ALL EXISTING CONCEALED FLEXIBLE DUCTWORK SECTIONS IN <br />AREAS WITH REPLACED CEILINGS WITH NEW FLEX DUCT SECTIONS. OLD <br />FLEX DUCT SECTIONS SHALL BE REMOVED AND DISCARDED. <br />E. ALL DUCTWORK INSULATION, EQUIPMENT, AND PIPING SIZES ARE TO BE <br />INCHES UNLESS NOTED OTHERWISE. <br />F. THE MECHANICAL CONTRACTOR SHALL REMOVE AND DISCARD OFF -SITE <br />ALL ABANDONED DUCTWORK, HVAC EQUIPMENT, AND HANGERS, BOTH <br />CONCEALED AND NON -CONCEALED, THROUGHOUT THE BUILDING. <br />MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL ABANDONED <br />DUCTWORK AND HVAC EQUIPMENT PRIOR TO BID. <br />GENERALNEW NOTES: <br />A. NEW EQUIPMENT AND DUCTWORK SHOWN DARK AND SOLID. ANY EQUIPMENT AND <br />DUCTWORK SHOWN LIGHTER AND SOLID TO REMAIN. <br />B. CONTRACTOR SHALL VERIFY EXACT HEIGHTS OF ALL CEILINGS & DECOR ITEMS PRIOR <br />TO START OF WORK. SEE ARCHITECTURAL SHEETS FOR DETAILS AND CONSTRUCTION. <br />COORDINATE EXACT DUCTWORK INSTALLATION WITH CEILING & DECOR AND <br />STRUCTURE, AS REQUIRED. <br />C. SEE ELECTRICAL LIGHTING SHEETS FOR EXACT LOCATION OF ALL LIGHT FIXTURES. <br />COORDINATE EXACT DIFFUSER AND GRILLE LOCATIONS WITH LIGHTING FIXTURES, AS <br />REQUIRED. INSTALL AND MAINTAIN A MINIMUM OF 36" FROM LIGHT FIXTURE IN ALL <br />OPEN AREAS WITHOUT DROP CEILINGS. <br />D. INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE WILE COORDINATING WITH ALL <br />OTHER TRADES. OFFSET AND TRANSITION DUCTWORK BETWEEN AND BENEATH <br />STRUCTURAL MEMBERS, WHERE REQUIRED, DROP BRANCH DUCTS DOWN TO <br />DIFFUSERS AND GRILLES. <br />E. ALL DUCTWORK SHALL MEET SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - <br />METAIL AND FLEXIBLE", CURRENT EDITION. DUCT GAUGES, REINFORCEMENTS, <br />METHODS OF CONNECTION, TRANSITIONS AND CONSTRUCTION WILL BE <br />FIELD -VERIFIED, MEASURED AND INSPECTED FOR COMPLIANCE. DUCTWORK NOT <br />MEETING SMACNA'S STANDARDS WILL BE REMOVED AND REPLACED AT <br />CONTRACTOR'S EXPENSE. SEE THE SPECIFICATIONS FOR THE REQUIRED PRESSURE <br />CLASSIFICATION FOR ALL DUCTWORK. CONTRACTOR SHALL VERIFY ALL <br />REQUIREMENTS PRIOR TO SUBMITTALS OR DUCT FABRICATION AND GIVE WRITTEN <br />DOCUMENTATION OF COMPLIANCE IN ORIGINAL PRODUCT SUBMITTALS. MECHANICAL <br />SYSTEMS SUPPORTS SHALL BE DESIGNED AND INSTALLED FOR SEISMIC FORCES IN <br />ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE IMC 403.3.1.5 & WSEC <br />C408.2.2.1 & C408.2.5.3 & C408,2.5.4. <br />F. ALL DIMENSIONS ARE LISTED IN INCHES UNLESS NOTED OTHERWISE. ALL DUCTWORK <br />DIMENSIONS ARE INSIDE CLEAR. <br />G. HVAC CONTRACTOR SHALL FIELD -COORDINATE ALL CONDITIONS, UNIT LOCATIONS, <br />OBSTRUCTIONS AND DUCTWORK INSTALLATION PRIOR TO DUCT FABRICATION, <br />TRANSITION AND OFFSET DUCTWORK, AS REQUIRED, TO MAKE FIT IN CEILING SPACES <br />AND FIELD CONDITIONS, DUCTWORK FABRICATED BY THE HVAC CONTRACTOR PRIOR <br />TO FIELD COORDINATION AND CONFLICT RESOLUTION SHALL BE AT THE <br />RESPONSIBILITY AND COST OF THE HVAC CONTRACTOR. OWNER SHALL NOT BE <br />RESPONSIBLE FOR SHOP -FABRICATED DUCTWORK SIZED DIRECTLY FROM THE HVAC <br />DRAWINGS. <br />H. DO NOT CUT, DRILL HOLES OR REMOVE ANY PORTION OF STRUCTURAL MEMBERS, <br />BEAMS OR PURLINS. ROUTE ALL DUCTWORK, PIPING AND CONDUIT AROUND AND <br />THROUGH STRUCTURAL MEMBERS AS REQUIRED. SEE STRUCTURAL DETAILS AND <br />DRAWINGS FOR EXACT METHOD OF ATTACHING HANGERS TO BEAMS AND <br />STRUCTURAL MEMBERS. <br />I. DO NOT ATTACH SCREWS, NAILS, HANGERS OR FASTENERS OF ANY TYPE TO ROOF <br />DECK. SUPPORT ALL MECHANICAL EQUIPMENT FROM STRUCTURE AND <br />CONTRACTOR -INSTALLED KICKERS ONLY. PROVIDE AND INSTALL INTERMEDIATE <br />KICKERS BETWEEN PURLINS AS REQUIRED TO HANG EQUIPMENT AND SHEET METAL <br />DUCTWORK. <br />J. ALL BRANCH DUCTS OFF MAIN DUCT TO BE INSTALLED WITH 45° TIME -AND -A -HALF <br />FITTING, BELL -MOUTH FITTING, OR SPIN -IN ONLY. NO STRAIGHT TAPS ALLOWED. <br />K. FLEXIBLE DUCT RUNS SHALL BE NO LONGER THAN 6'4'. <br />L. EXISTING EXPOSED DUCTWORK, REGISTERS, DIFFUSERS, OR GRILLES TO BE CLEANED, <br />POLISHED AND BLADES REALIGNED FOR ALL AREA'S VISIBLE TO CUSTOMERS. <br />M. THE STRUCTURAL ENGINEER SHALL BE RESPONSIBLE FOR THE REVIEW AND <br />APPROVAL OF THE SEISMIC BRACING, RESTRAINTS, ISOLATORS, AND ISOLATION <br />MATERIALS. <br />ABBREVIATIONS <br />SYMBOL <br />DESCRIPTION <br />A.G.A. <br />AMERICAN GAS ASSOCIATION <br />AFF <br />ABOVE FINISHED FLOOR <br />AFG <br />WOVE FINISHED GRADE <br />BHP <br />BRAKE HORSEPOWER <br />BTU <br />BRITISH THERMAL UNIT <br />CAP <br />CAPACITY <br />CENT <br />CENTRIFUGAL <br />CFM <br />CUBIC FEET PER MINUTE (AIRFLOW) <br />CHAR <br />CHARACTERISTICS, ELECTRICAL <br />CONT <br />CONTINUATION <br />COORD <br />COORDINATE <br />CO2 <br />CARBON DIOXIDE SENSOR (IAQ) <br />CO <br />CARBON MONOXIDE SENSOR (IAQ) <br />DB <br />DRY BULB (-F) <br />DN <br />DOWN <br />(E) <br />EXISTING <br />EA <br />EXHAUST AIR <br />EAT <br />ENTERING AIR TEMPERATURE ff ) <br />EFF <br />EFFICIENCY <br />EER <br />ENERGY EFFICIENCY RATIO <br />ELEC <br />ELECTRICAL <br />ESP <br />EXTERNAL STATIC PRESSURE <br />ETC <br />ETCETERA <br />EX <br />EXISTING <br />FD <br />FIRE DAMPER <br />FLA <br />FULL LOAD AMPERAGE <br />FSD <br />FIRE SMOKE DAMPER <br />GA <br />GAUGE <br />GPM <br />GALLONS PER MINUTE <br />HIP <br />HORSEPOWER <br />FIX <br />HEAT EXCHANGER <br />IAQ <br />INDOOR AIR QUALITY <br />IEQ <br />INDOOR ENVIRONMENTAL QUALITY <br />kW <br />KILOWATT (POWER) <br />LAT <br />LEAVING AIR TEMP <br />MAX <br />MAXIMUM <br />MBH <br />1000 BTUs/ HOUR <br />MIN <br />MINIMUM <br />MODS <br />MODIFICATIONS <br />NO. OR # <br />NUMBER <br />N.T.S. <br />NOT TO SCALE <br />OA <br />OUTSIDE AIR (FRESH AIR) <br />OAT <br />OUTSIDE AIR TEMPERATURE ff ) <br />OB <br />OPPOSED BLADE <br />PD <br />PRESSURE DROP <br />PRV <br />PRESSURE REDUCING VALVE <br />PSI <br />POUNDS PER SQUARE INCH (PRESSURE) <br />RA <br />RETURN AIR <br />REF <br />REFRIGERATION <br />REFRIG <br />REFRIGERANT <br />REQ'D <br />REQUIRED <br />RH <br />RELATIVE HUMIDITY <br />RPBP <br />REDUCED -PRESSURE BACKFLOW PREVENTER <br />RPM <br />REVOLUTIONS PER MINUTE: <br />S <br />SENSOR (SEE SPECS) <br />SA <br />SUPPLY AIR <br />SD <br />SMOKE DETECTOR (IN RETURN DUCT) <br />SEER <br />SEASONAL ENERGY EFFICIENCY RATIO <br />SPE <br />STATIC PRESSURE EXTERNAL <br />SPT <br />STATIC PRESSURE TOTAL <br />S/T <br />SENSIBLE TO TOTAL COOLING RATIO <br />T-STAT <br />THERMOSTAT (SEE SPECS) <br />TSP <br />TOTAL STATIC PRESSURE <br />TYP <br />TYPICAL <br />VOL <br />VOLUME <br />W/ <br />WITH <br />WB <br />WET BULB (-F) <br />SOME ABBREVIATIONS LISTED IN THIS LEGEND MAY NOT APPEAR WITHIN THIS PROJECT'S SCOPE. <br />THIS LIST IS FOR GENERIC PURPOSES ONLY AND IS NOT PROJECT -SPECIFIC. <br />M0.1 HVAC ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES <br />MD.1.1.1 HVAC DEMOLITION PLAN <br />M1.1.1 HVAC PLAN <br />M6.1 HVAC SCHEDULES <br />Project <br />MILL CREEK <br />EVERETT, WA 98208 <br />Mechanical/Electrical <br />___ U-1-111m, <br />Engineering Consultants Incorporated <br />303 Federal Way Boise, ID 83705 <br />Phone: 208376.9820 Fax: 208.376.9822 <br />w"Vwcciboise.com <br />77 <br />`� of wAsgrar <br />(9 MACKENZIE <br />2020 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO BE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />Revision Delta I issue Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.