Laserfiche WebLink
al, 11 lull 111m, AN <br />CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED ACCESS TO ANY WATER OR <br />POWER DISTRIBUTION FACILITIES (POWER POLES, PULL -BOXES, TRANSFORMERS, VAULTS, PUMPS, VALVES, <br />METERS, APPURTENANCES, ETC.) OR TO ANY LOCATION OF THE HOOKUP, THE CONSTRUCTION SHALL_ NOT BE <br />WITHIN 10'-0" OF ANY POWER LINES- WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE <br />TO COMPLY MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSES. <br />STEEL, COPPER OR FERROUS PIPES OR CONDUITS MAY PENETRATE CONCRETE WHERE THE PENETRATING <br />ITEM IS A MAXIMUM 6- INCH DIAMETER AND THE AREA OF THE OPENING THROUGH THE WALL DOES NOT <br />EXCEED 144 SQUARE INCHES <br />HEALTH DEPARTMENT NOTES <br />MOP SINKS, UTILITY SINKS AND ANY HOSE BIBBS WHERE DOMESTIC WATER OUTLETS MAY BE <br />SUBMERGED IN CONTAINERS OR SINKS MUST HAVE APPROVED BACKFLOW PREVENTION DEVICES <br />INSTALLED. <br />LIGHT FIXTURES IN FOOD STORAGE AREAS TO BE PROTECTS AGAINST BREAKAGE TROUGH THE USE OF <br />PLASTIC SHIELDS, PLASTIC SLEEVES, SHATTER -RESISTANT LENSES AND/OR OTHER APPROVED <br />DEVICES, <br />ALL CONSTRUCTOR AND EQUIPMENT INSTALLATIONS ARE SUBJECT TO ON-STE INSPECTIONS. FINAL <br />INSPECTION AND APPROVAL IS REQUIRED PRIOR TO BEGINNING OPERATION. <br />NO ALCOHOLIC BEVERAGES WILL BE CONSUMED ON THE PREMISES, <br />ALL PLUMBING, ELECTRICAL LINES TO BE CONCEALED WITHIN A BUILDING WALL STRUCTURE, <br />WHEREVER POSSIBLE. ALL LINES NOT CONCEALED TO BE SECURED 6 INCHES OFF FLOOR AND 3/4' <br />FROM WALLS AND CEILINGS USING OFFSET BRACKET. <br />FIRE / LIFE NOTES <br />BUILDINGS UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL BE IN ACCORDANCE WITH CHAPTER 14. <br />PROVIDE MINIMUM 2A-1013=C RATED FIRE EXTINGUISHES LOCATED WITHIN A 75-FOOT TRAVEL DISTANCE FROM ANY POINT <br />IN THE BUILDING. EXTINGUISHERS SHALL BE MOUNTED ON THE WALL OR IN CABINETS, SUCH THAT THE TOP OF THE <br />EXTINGUISHER IS NO MORE THAN 54" ABOVE FLOOR LEVEL SEE FLOOR PLAN FOR LOCATIONS. PROVIDE A MINIMUM OF 1 <br />EXTINGUISHER PER 3,000 SQUARE FEET, <br />EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR <br />EFFORT. MANUALLY OPERATED EDGE OR SURFACE MOUNTED BOLTS ARE PROHIBITED. <br />PROVIDE MAXIMUM OCCUPANCY SIGN OVER MAIN ENTRY DOORS (SIGNS SHALL BE POSTED IN A CONSPICUOUS <br />LOCATION NEAR THE MAIN EXIT OR EXIT -ACCESS DOORWAY FROM THE ROOM), <br />PROVIDE APPROVED EXIT SIGNS INSTALLED AT ALL REQUIRED EXITS AND WHERE OTHERWISE NECESSARY IN ORDER TO <br />INDICATE THE DIRECTION OF EGRESS, NO POINT SHALL BE MORE THAN 100 FEET FROM THE NEAREST VISIBLE SIGN, <br />EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED, <br />EMERGENCY LIGHTING, ILLUMINATING THE PATH OF EXITS SHALL BE PROVIDED PER GOVERNING CODES. <br />THE MAXIMUM FLAME SPREAD CLASS OF FINISH MATERIALS USED ON INTERIOR WALLS AND CEILINGS SHALL NOT <br />EXCEED CLASS B FOR EXITWAYS AND CLASS C FOR ROOMS OR AREA <br />SUBMIT FIRE ALARM PLANS AS REQUIRED TO THE FIRE -DISTRICT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION, <br />NOTESGENERAL <br />1. THE DRAWINGS INDICATE THE END RESULT, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE JOB SITE <br />PRIOR TO BID SUBMITTAL TO DETERMINE ANY PROBLEMS THEY WILL HAVE IN PERFORMING THE WORK. THE BID SHALL <br />INCLUDE THE COST OF THE RESOLUTION OF ALL PROBLEMS. <br />2. ANY CONDITION NOT COVERED IN THESE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BY <br />THE CONTRACTOR OR OWNER PRIOR TO BIDDING. <br />3. SOLELY AS A CONVENIENCE TO THE OWNER, THE ARCHITECT MAY INCLUDE DOCUMENTS PREPARED BY CERTAIN <br />CONSULTANTS (OR INCORPORATE THE RECOMMENDATIONS OF SAID CONSULTANTS IN DOCUMENTS PREPARED BY <br />THE ARCHITECT) WITHIN THE SET OF DOCUMENTS ISSUED BY THE ARCHITECT BEING EXPRESSLY UNDERSTOOD THAT, <br />BY SAID ISSUANCE, THE ARCHITECT ASSUMES NO LIABILITY FOR THE SERVICES OF SAID CONSULTANTS NOT UNDER <br />CONTRACT TO THE ARCHITECT. <br />4, CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE <br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND THAT <br />THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR <br />ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FOR LIABILITY ARISING <br />FROM SOLE NEGLIGENCE. <br />5. THE CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF DRAWINGS AT THE JOB SITE FOR USE IN MAKING'RECORD <br />DRAWINGS". ANY REVISIONS SHALL BE NOTED THEREIN AND SUBMITTED TO THE ARCHITECT AT THE COMPLETION OF <br />THE JOB <br />6. THESE DRAWINGS WERE PREPARED IN A MANNER CONSISTS WITH EXISTING PROFESSIONAL STANDARDS AND WITH <br />THE UNDERSTANDING EXPERIENCED CONSTRUCTION AND/OR DESIGN PROFESSIONALS FOR USE IN THE <br />CONSTRUCTION OF THIS SPECIFIC PROJECT ONLY. THE DETAILS INDICATED ON THESE PLANS REPRESENT TYPICAL <br />DETAILS REQUIRED FOR COMMUNICATING THIS PROJECT'S DESIGN INTENT TO SUCH QUALIFIED CONSTRUCTION <br />PROFESSIONALS AND AS SUCH MAY NOT INCLUDE ALL THE DETAILS NECESSARY FOR THE FINAL COMPLETION OF THIS <br />PROJECT, <br />7. CONTRACTOR SHALL NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER OF RECORD IN WRITING IMMEDIATELY, OF <br />ANY APPARENT DISCREPANCIES OR POSSIBLE OMISSIONS IN DETAILING, PRIOR TO STARTING THE WORK. THE <br />CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR TIE CONSEQUENCES OF PROCEEDING WITHOUT WRITTEN <br />CLARIFICATIONS FROM THE ARCHITECT OR STRUCTURAL ENGINEER RELATED TO ANY SUCH APPARENT DISCREPANCY. <br />8. ALL COSTS FOR INSPECTIONS, TEST SERVICES, BUILDING PERMITS, LICENSES AND CERTIFICATIONS SHALL BE THE <br />RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS OTHERWISE NOTED, <br />9. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE, LATEST EDITION. REFER TO COVER <br />SHEET FOR COMPLETE LIST OF CODES, ADOPTIONS, & AMENDMENTS APPLICABLE. COMPLIANCE WITH ADDITIONAL <br />NOTED STANDARDS, SHALL BE TO THE MOST RECENTLY ACCEFTED/PUBLISHED STANDARDS, AS APPROVED BY THE <br />GOVERNING AGENCY. <br />10. THE ARCHITECT IS AUTHORIZED TO ORDER MINOR CHANGES DURING THE COURSE OF THE WORK WHICH WILL NOT <br />INVOLVE EXTRA COST OR TIME AND WHICH ARE CONSISTENT WE THE CONTRACT DOCUMENT. <br />11. GENERAL CONTRACTOR SHALL SUBMIT 6 SETS OR ELECTRONIC COPY OF SHOP DRAWINGS FOR ALL NEW MATERIALS <br />FOR REVIEW. NO FABRICATION, ERECTION, OR INSTALLATION OF MATERIALS SHALL BE STARTED WITHOUT WRITTEN <br />APPROVAL OF ARCHITECT, <br />12. ANY CHANGES TO THESE DRAWINGS AND SPECIFICATIONS SHALL BE BY ADDENDUM OR CHANGE ORDER AND <br />APPROVED BY THE OWNER AND ARCHITECT PRIOR TO THE WORK. <br />13. SHOULD ANY CONDITIONS DEVELOP NOT COVERED BY THE CONTRACT DOCUMENTS GOVERNING WHEREIN THE <br />FINISHED WORT{ WILL NOT COMPLY WITH THE BUILDING CODE, A CHANGE ORDER DETAILING AND SPECIFYING THE <br />REQUIRED WORK WILL BE SUBMITTED TO AND APPROVED BY THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. <br />14. THE OWNER AND/OR THE ARCHITECT RESERVES THE RIGHT TO HAVE TESTS MADE WHEN DEEMED NECESSARY. <br />SHOULD THE ARCHITECT ORDER SPECIAL TESTING OR INSPECTION OF A QUESTIONABLE PART OF THE WORK WHICH <br />REVEALS DEFECTS NOT IN CONFORMITY WITH THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PAY THE COST <br />OF SUCH SPECIAL TESTING OR INSPECTION INCLUDING THE ARCHITECTS EXTRA SERVICES MADE NECESSARY <br />THEREBY, OTHERWISE THE OWNER SHALL BEAR SUCH COST. TESTS SHALL BE MADE IN ACCORDANCE WITH <br />RECOGNIZED STANDARDS BY A COMPETENT TESTING LABORATORY, ANY MATERIAL FOUND DEFECTIVE OR NOT IN <br />CONFORMITY WITH SPECIFICATION STANDARDS SHALL BE PROMPTLY REPLACED OR REPAIRED AT THE EXPENSE OF <br />THE CONTRACTOR. SAMPLES REQUIRED FOR TESTING WILL BE FURNISHED BY THE CONTRACTOR AND SELECTED AS <br />DIRECTED BY THE ARCHITECT, <br />15. BUILDINGS SHALL COMPLY WITH ALL APPLICABLE REGULATIONS OF THE BUILDING CODE, ENERGY RESOURCES <br />CONSERVATOR AND DEVELOPMENT COMMISSION REGULATIONS, AND THE AMERICANS WITH DISABILITIES ACT. (ADA) <br />16. GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ARCHITECT FOR REVIEW IN ITEMS CALLED OUT AS "OR <br />EQUAL", AND IN ACCORDANCE WITH THE PROJECT MANUAL. <br />17. CONSTRUCTION SAFETY: ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF OSHA. <br />13. ASTM STANDARDS AND OTHER MATERIAL REFERENCE DESIGNATIONS SHALL BE OF LATEST DATE ACCEPTABLE TO <br />THE CHECKING AGENCY, <br />19. DETAILS MARKED TYPICAL ON DRAWINGS ARE INTENDED FOR TYPICAL CONDITIONS ON THE ENTIRE PROJECT AND <br />ARE TO APPLY WHERE SIMILAR CONDITIONS OCCUR. <br />20. ALL ITEMS ARE NEW UNLESS NOTED AS EXISTING - TYPICAL <br />21. CONTRACTORS MUST SUBMIT CERTIFICATE OF WORKMAN'S COMPENSATION INSURANCE COVERAGE PRIOR TO <br />ISSUANCE OF BUILDING PERMITS. <br />22. THE ENTIRE WORK PROVIDED FOR HEREIN IS TO BE CONSTRUCTS AND FINISHED, IN EVERY PART, IN A GOOD AND <br />SUBSTANTIAL MANNER AND IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, THE FULL INTENT OF THE <br />SAME. ANY WORK REQUIRED BY LAW, BUT WHICH MAY NOT BE SPECIFICALLY MENTIONED HEREIN SHALL BE DONE BY <br />THE CONTRACTOR(S) IN ACCORDANCE WITH THE LAWS OF THE CITY, COUNTY, DISTRICT, OR STATE UNDER WHICH <br />JURISDICTION MAY COME AND COST SHALL BE BORN BY THE CONTRACTOR'S), ANY SUCH EXTRA WORK SHALL BE <br />DONE IN CONFORMANCE WITH THE PLAN BOTH AS TO THE MANNER AND APPEARANCE, <br />23, CONTRACTOR SHALL RESIN SOLELY RESPONSIBLE FOR INSTALLING/MAINTAINING ADEQUATE BRACING DURING <br />CONSTRUCTION UNTIL THE STRUCTURE IS SUFFICIENCY COMPLETE TO PROVIDE SUPPORT FOR THE VARIOUS <br />INDIVIDUAL ELEMENTS AS INTENDED IN THE FINISHED STRUCTURE, <br />24, INSPECTORS AND TESTING LABORATORIES MUST BE CHOSEN AND EMPLOYED BY OWNER, NOT THE CONTRACTOR. <br />25. THE CONTRACTOR SHALL COOPERATE WITH ALL OTHER CONTRACTORS WHO MAY BE PERFORMING WORK ON BEHALF <br />OF THE OWNER AND WORKMEN WHO MAY BE EMPLOYED BY THE OWNER ON ANY WORK IN THE VICINITY OF THE WORK <br />TO BE DONE UNDER THIS CONTRACT; AND HE SHALL SO CONDUCT HIS OPERATIONS AS TO INTERFERE TO THE LEAST <br />POSSIBLE EXTENT WITH THE WORK OF SUCH CONTRACTORS OR WORKMEN, HE SHALL MAKE GOOD PROMPTLY, AT <br />HIS OWN EXPENSE, ANY INJURY OR DAMAGE THAT MAY BE SUSTAINED BY OTHER CONTRACTORS OR EMPLOYEES OF <br />THE OWNER OCCASIONED BY HIS ACTS, ANY DIFFERENCE OR CONFLICT WHICH MAY ARISE BETWEEN THE <br />CONTRACTOR AND OTHER CONTRACTORS OR BETWEEN THE CONTRACTOR AND WORKMEN OF THE OWNER IN <br />REGARDS TO THEIR WORK, SHALL BE RESOLVED BY THE OWNER. IF THE WORK OF THE CONTRACTOR IS DELAYED <br />BECAUSE OF ANY ACTS OR OMISSIONS OF ANY OTHER CONTRACTOR OR OF THE OWNER, THE CONTRACTOR SHALL <br />ON THAT ACCOUNT HAVE NO CLAM AGAINST THE OWNER OTHER THAN FOR EXTENSION OF TIME. <br />26. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO INSURE THAT ALL SUBCONTRACTORS HAVE REVIEWED <br />THE ENTIRE SCOPE OF THE PROJECT THAT RELATES TO THEIR TRADE, ALL SUBCONTRACTORS ARE REQUIRED <br />TO REVIEW ALL RELATIVE WORK SHOWN ON "M" "P" "E" DRAWINGS. <br />27. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL SECURE THE AREA SO THAT NO UNAUTHORIZED <br />PERSONNEL WILL GAIN ACCESS TO THE PROJECT AREA OR CONTRACTOR'S STAGING AREA <br />28. UTILITIES FOR CONSTRUCTION SHALL BE PROVIDED BY THE OWNER. <br />29. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SECURING HIS EQUIPMENT, SUPPLIES, TOOLS, ETC. <br />30, AT NO TIME DURING THE WORK UNDER THE CONTRACT SHALL THE CONTRACTOR PLACE, OR CAUSE TO BE PLACED, <br />ANY MATERIAL OR EQUIPMENT, ETC., AT A LOCATION THAT COULD IMPEDE OR IMPAIR ACCESS TO OR FROM THE <br />PRESENT FACILITIES. <br />31. THE CONTRACTOR SHALL COOPERATE WITH THE OWNER TO THE FULLEST EXTENT IN PROVIDING TRAFFIC CONTROL <br />DURING THE COURSE OF CONSTRUCTION SO AS TO PROVIDE A MINIMUM OF INCONVENIENCE TO MATERIAL <br />MOVEMENT, AND MAXIMUM PROTECTION FOR EMPLOYEES, ALL CONTRACTOR EMPLOYEES ON THE PROJECT SHALL <br />PARK THEIR PRIVATE VEHICLES IN THE AREA DESIGNATED BY THE OWNER, <br />32. THE CONTRACTOR SHALL EXERCISE MAXIMUM DUST AND NOISE CONTROL EFFORTS TO KEEP AT A MINIMUM THE <br />NUISANCE OF DUST AND CONSTRUCTION NOISE <br />33. GOVERNING CODES AND FIRE DEPARTMENT FIELD INSPECTOR SHALL DICTATE SIZE, TYPE, QUANTITY AND LOCATIONS <br />OF BOTH TEMPORARY AND PERMANENT PORTABLE FIRE EXTINGUISHERS <br />34. GENERAL CONTRACTOR SHALL DESIGNATE A QUALIFIED PERSON FOR THE SUPERVISION OF WELDING OR CUTTING <br />OPERATIONS, INCLUDING USE OF FLAME PROOFED TARPAULINS. <br />35. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SPECIAL PRECAUTIONS WALLS, AND TEMPORARY WALLS AND <br />SHORING <br />36. GENERAL CONTRACTOR SHALL BE RESPONSIBLE IN KEEPING COMBUSTIBLE MATERIAL INCLUDING CRATED <br />EQUIPMENT TO A MINIMUM AND AS FAR AWAY AS POSSIBLE FROM BUILDINGS UNDER CONSTRUCTION. <br />37. ELECTRICAL CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS, SERVICE REQUIREMENTS, AND EXACT <br />LOCATIONS OF SERVICE FACILITIES. <br />38. ELECTRICAL CONTRACTOR SHALL CHECK WITH OTHER TRADES FOR LOCATOR OF EQUIPMENT WHICH REQUIRES ANY <br />HOOKUP, DISCONNECT SWITCHES, RELAYS, ETC. PRIOR TO ANY START OF WORK. <br />39, THE ELECTRICAL CONTRACTOR SHALL VERIFY WITH MECHANICAL DRAWINGS FOR CONTROL WIRING DIAGRAMS, <br />EXACT LOCATORS AND SIZE OF EQUIPMENT. <br />40. ALL NEW EQUIPMENT AND COMPONENTS ARE TO BE UL OR ETL LISTED AND HAVE ICC NUMBERS FOR STRUCTURAL <br />MEMBERS <br />41. ALL CONTRACTOR SUPPLIED EQUIPMENT MUST BE APPROVED BY OWNER THROUGH SUBMITTALS <br />EQUIPMENTH LE <br />; � _I� ertt �e�r�: �d� <br />ir��i��t�ir <br />N �� <br />���� <br />Electrical <br />Plumbing <br />Purchased <br />Installed' <br />1�1r1� <br />e <br />N� .$`i��1rr�r <br />Hr�- <br />��i <br />Arr1 <br />�c�l�� <br />�l�JHz <br />� Cl' <br />I <br />� <br />/ <br />r <br />� trt�r <br />�I <br />err <br />�'� tr <br />��1 <br />1 rd Ball <br />Grain. r <br />J X7 AND JEX1 <br />---- <br />-_-_ <br />_ <br />_ _ <br />---- <br />__ <br />_ <br />X <br />X <br />1 <br />Cir1 <br />1 itrlac <br />� FR. I �[ <br />a= <br />�_ a <br />I�0 <br />tIl I�S�C_�� r lItPllt <br />Pallet Jack <br />1 <br />=c3---- <br />0 <br />120 <br />--_- <br />a- - <br />_ - <br />0 <br />Floor Scrubber <br />1 <br />Tennant <br />5700 <br />- _ <br />---- <br />30 <br />120 <br />1 <br />00 <br />3/ " <br />---- <br />0/& <br />X <br />X <br />36V - 50A / 100O <br />T raff ic Door & FrameDLirris, <br />DIrL1Ilte Industrial <br />a= <br />=,-a <br />aoo- <br />_oG= <br />___o <br />a=o <br />a <br />X <br />X, <br />S/S STRUCTURAI- DOOR I=P <br />Fly Fan <br />4 <br />IIr, <br />EP2UG-TS <br />1 <br />00 <br />1 <br />00 <br />X <br />X <br />7 Fly Fars <br />2 <br />Mars <br />ST 4 -1 - 5 <br />---- <br />---- <br />7.5 <br />0 <br />1 <br />00 <br />==o_ <br />a=_= <br />---- <br />X <br />X <br />i <br />HVA Ground Mounted Unit <br />1 <br />Trans <br />VAS *'1 0 0 <br />_ <br />67 <br />208 <br />3 <br />00 <br />3/411 <br />___- <br />__ <br />Ground Mounted Refrigeration Condensor <br />2 <br />Bohn <br />BCH006OMDACZ <br />---- <br />===m <br />27,5 <br />208 <br />O <br />00 <br />_ = <br />_=__ <br />___- <br />X <br />X <br />EC motors <br />O <br />10 Refrigeration Evaporator Unit/ <br />Bohn <br />BEi O O S A I,AB0100 <br />_ -_ <br />____ <br />0 <br />0 <br />1 <br />0 <br />0" <br />__ - <br />_ -3 <br />X <br />E motors <br />10 <br />11 Cooler Box <br />1 <br />vo <br />mo <br />o <br />ee 3 <br />---- <br />o-- <br />---- <br />X <br />X <br />1' <br />'� %Iri4 SIi1C <br />Advanced T <br />7- - 1, <br />---- <br />a= <br />1 <br />1 0 <br />1 <br />OO <br />1=1 2'" <br />� <br />0 '" <br />/ <br />O '" <br />X <br />X <br />12 <br />10 O Compartment Sink <br />1 <br />Advanced Tale <br />O-CO= =1 3RL <br />---- <br />=___ <br />=--- <br />_ __ <br />__ <br />---- <br />Wall <br />0/ " <br />0/ " <br />X <br />X <br />1 <br />14 janitors Sink <br />1 <br />Must ee <br />60 <br />---- <br />e c <br />_ <br />---- <br />---- <br />---- <br />Nall <br />O/ 31 <br />3/ '1 <br />X <br />X <br />1 . <br />15 Hydraulic Lift <br />2 <br />Presto <br />TAD- 0900 <br />1-1/ ' <br />---- <br />200 <br />0 <br />00 <br />--- <br />=__= <br />---- <br />X <br />X <br />1 <br />16 Security System <br />1 <br />Convergent <br />---- <br />120 <br />1 <br />00 <br />---- <br />---- <br />-- <br />X <br />x <br />10 <br />17 Intrusion System <br />1 <br />Convergent <br />---- <br />__ <br />1,5 <br />120 <br />1 <br />60 <br />=-__ <br />-- - <br />x <br />x <br />1 <br />18 IT System <br />1 <br />-__ <br />__ <br />j 120 <br />1 <br />00 <br />---- <br />=___ <br />___- <br />X <br />X <br />1 <br />ROOM FINISH L <br />RM # ROOM NAME <br />SBSTR <br />105 WAREHOUSE COOLER CONC <br />106 PRODUCT ASSEMBLY CONC <br />107 STORAGE CONC <br />109 (N) IT ROOM CONC <br />110 (N) PORTER'S CLOSET CONC <br />FLOOR <br />FINISH <br />(ETR) <br />(ETR) <br />(ETR) <br />(ETR) <br />(ETR) <br />BASE <br />B=2 <br />B1 <br />Bi <br />Bi <br />B1 <br />NORTH <br />SBSTR FINISH <br />IMP / WC=1 FACT FIN <br />BED SCRIM GYP (ETR) <br />OPEN =__= <br />(N) GYP BD (N) PAINT <br />(N) GYP BD (N) PAINT <br />SBSTR <br />IMP / WC-1 <br />BD/SCRGYP <br />OPEN <br />(N) GYP BD <br />(N) GYP BD <br />WALLS <br />EAST SOUTH <br />FINISH SBSTR FINISH <br />FACT FIN IMP / WC-1 FACT FIN <br />(ETR) (E) GYP BD (ETR) <br />_ (E) GYP BD (ETR) <br />(N) PAINT (N) GYP BD (N) PAINT <br />(N) PAINT (N) GYP BD (N) PAINT <br />WEST <br />SBSTR FINISH <br />IMP / WC-1 FACT FIN <br />(E) GYP BD (ETR) <br />IWP / WC-1 FACT FIN <br />(N) GYP LSD (N) PAINT <br />(N) GYP BD (N) PAINT <br />CEILING <br />SBSTR FINISH <br />IMP FACT FIN <br />--= OTS <br />-- = OTS <br />(N) GYP LSD (N) PAINT <br />(N) GYP BD (N) PAINT <br />ITT AFF <br />10'4' <br />- <br />=» <br />9' 0, <br />NOTES <br />1 <br />I , , lll; J <br />CP <br />COOLER PANEL <br />IMP <br />INSULATED METAL PANEL <br />PT <br />PAINT <br />A.C.T. <br />ACOUSTIC CEILING TILE <br />AL <br />ALUMINUM <br />SK BD <br />BACKER BOARD <br />CONC <br />CONCRETE <br />CPT <br />CARPET <br />CT <br />CERAMIC TILE <br />(E) <br />EXISTING <br />(ETR) <br />EXISTING TO REMAIN <br />FF <br />FACTORY FINISH <br />GWB <br />GYPSUM BOARD <br />S/S <br />STAINLESS STEEL <br />B-1 <br />6" VINYL COVE BASE <br />B-2 <br />COOLER PANEL COVED SCREED <br />WC-1 <br />46" HIGH S/S WAINSCOT ON EXPOSED INTERIOR AND EXTERIOR OF COOLER <br />GENERAL NOTES <br />1. FIRE TAPE ALL GYPSUM BOARD JOINTS IN EXISTING WALLS AND PLACE <br />SEALER/PRIMER AND TWO COATS OF SEMIGLOSS WHITE PAINT <br />DOOR SCHEDULE <br />DOOR <br />FRAME <br />DR # <br />ROOM NAME <br />FIRE RATING <br />LABEL <br />HDWR <br />GROUP <br />NOTES <br />SIZE <br />DETAIL <br />MATT= <br />TYPE <br />GLAZ <br />MATL <br />TYPE <br />W <br />ITT <br />THK <br />DEAD <br />JAMB <br />THRESH <br />105 <br />WAREHOUSE COOLER <br />6' 0°' <br />3' 0" <br />1 7/8" <br />TRAFFIC <br />B <br />VISION PNL, <br />S/S <br />S/S TUBE <br />7/A-701 <br />3/A-701 <br />m <br />8 <br />109 <br />PORTERS CLOSET <br />3L0" <br />7L0" <br />1-3/4" <br />H.M. <br />A <br />H.M. <br />n <br />15/A-701 <br />10/A-701 <br />1 <br />1, 2, 3, 4, 6, 7, <br />3,9,10 <br />110 <br />IT ROOM <br />3'=0" <br />7'-0" <br />1-3/4" <br />H.M. <br />A <br />H.M. <br />15/A-701 <br />10/A-701 <br />-- <br />2 <br />1' 2' 3' 4, 6' 7` <br />3,9,10 <br />113 <br />RECEIVING <br />61-01, <br />3' 0'° <br />GATE <br />C <br />- <br />V <br />114 <br />RECEIVING <br />6'4' <br />6' 0" <br />GATE <br />C <br />= <br />_ <br />DOOR HAF <br />MANUFACTURER QUANTITY ITEM <br />ANLEY 1 1/2 PR BUTTS <br />:ST 1 LOCKSET <br />IMCO 1 STOP <br />1 <br />NUMBER AND SIZE <br />FBB-199 41/2 x 41/2 <br />93KON15CSTK <br />1270CV <br />DOOR HARDWARE 2 <br />FINISH <br />MANUFACTURER <br />QUANTITY <br />ITEM <br />NUMBER AND SIZE <br />FINISH <br />630 <br />STANLEY <br />1 1/2 PR <br />BUTTS <br />FBB-199 41/2 x41/2 <br />630 <br />626 <br />BEST <br />1 <br />LOCKSET <br />9oKON15CSTK <br />626 <br />626 d <br />LCN <br />1 <br />CLOSER <br />4111-CUSH <br />669 <br />TRIMCO <br />1 <br />STOP <br />1270CV <br />626 <br />1 DOOR SUPPLIER SHALL SUPPLY AND INSTALL ALL DOOR HARDWARE <br />2 INSTALL NEW OR CONFIRM EXISTING HARDWARE IS FULLY <br />OPERATIONAL <br />3 SUPPLY STAINLESS STEEL KICKPLATES ON EACH SIDE OF MAN DOORS <br />4 ALL HARDWARE TO BE COMPLIANT WITH SECTION 1133B 2.5,2 ADA <br />COMPLIANT LEVER HARDWARE IS TO BE USED UNLESS NO HARDWARE IS <br />USED <br />5 GENERAL CONTRACTOR TO VERIFY PROPER FUNCTIONING, LATCHING, <br />LOCKING, AND SEALING(WHERE APPLICABLE) OF ALL MAN DOORS. ALL NON <br />FUNCTIONING HARDWARE IS TO BE SERVICED/REPAIRED BACK TO <br />OPERATING CONDITION. <br />6, ALL NEW DOORS TO MATCH EXISTING DOOR, FRAME COLOR & HARDWARE <br />7. MATCH NEW DOOR HEIGHT TO EXISTING DOOR HEIGHTS - FIELD VERIFY <br />8, MAXIMUM DOOR OPENING EFFORTS OF 5 LBS. <br />9. INSTALL DOOR WITH HARDWARE THAT WILL ALLOW DOOR TO BE OPENED <br />FROM THE INSIDE WITHOUT KEY, SPECIAL KNOWLEDGE, OR EFFORT <br />10. TRIM TO MATCH (E) <br />812 SW WASHINGTON ST, SUITE 800 <br />PORTLAND OREGON 97205 <br />PHONE 503/226.0622 <br />FAX 503/ 226.0626 <br />ViiWW.MCA-ARCHITECTS.COM <br />- REGISTERED <br />W 14 <br />1 ARCHITECT <br />'JACK Co MILLER <br />STATE OF WASHINGTON <br />U <br />00 <br />U <br />0 <br />re <br />® <br />00 <br />W-A <br />> <br />U <br />PROJECT NO: <br />DRWN BY: JW CHI<'D BY: JM <br />DATE: 02-04-22 <br />A-200 <br />OC COPYRIGHT <br />