Laserfiche WebLink
ENOSM SOLAR STANDARD SYSTEM GROUNDING ■ ,;; so�aR APPENDIX Cl■ <br />�■ MOUNT INSTALLATION GUIDE PAGE MOUNT UNIVERSALM MIDCLAMP INSTALLATION GUIDE : PAGE <br />--------------------------------------------------------------- --------------- -------------------------------------------------------------- --------------------------------------------------- ------------ ------------------------------------------------------------------------------ <br />WEEBLUG TFP-.1PgAL r:?A(Wl. <br />— _ Single Use Only • <br />ONLY ONE LUG PER ROW OF MODULES: <br />Only one lug per row of modules is <br />_ WEEBLUG CONDUCTOR - UNIRAC P/N 0080025: <br />required. See Page F for additional lugs �— �J Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance hole <br />required for expansion joints. in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, <br />oriented so the dimples will contact the aluminum rail. Place the lug portion on the <br />bolt and stainless steel flat washer. Install stainless steel flat washer, lock washer and <br />nutTighten the nut until the dimples are completely embedded into the rail and lug. <br />TORQUE VALUE 10 h: lbs. (See Note on PG. a1 <br />See product data sheet for more details, Model No. WEEB•lUG•h., <br />GROUNDING LUG MOUNTING DETAILS: S wta�ie,na ,r <br />Details are provided for both the WEEB and ILsco products. The WEEBLug has a single ust On <br />grounding symbol located on the lug assembly. The ILsco lug has a green colored <br />set screw for grounding indication purposes. Installation must be in accordance <br />with NFPA NEC 70, however the electrical designer of record should refer to the <br />Latest revision of NEC for actual grounding conductor cable size. ,!' <br />�_ <br />lieyuned it not using appruved integ,ated grounding nuuuiovetels <br />GROUND 6 DRILL SIZE <br />GROUND LUG <br />BOLT SIZE <br />DRILL SIZE <br />WEEBLug <br />1/4- <br />WA- Place in Top SM Rail Slot <br />ILSCO Lug <br />a10-32 <br />7/32" <br />Torque value depends on conductor size. <br />See product data sheet for torque value. <br />TERMINAL TORQ, " <br />:mull ianducm, <br />ILSCO LAY -IN LUG CONDUCMR - UNIRAC P/N 008009P: Alternate Grounding Lug <br />- Drill deburr hole and bolt thru both rail walls per table. <br />TORQUE VALUE S ft lbs. (Sec ... , , <br />See ILSCO prodttct data sheet for more details, Model No. GBL-41)RT. <br />NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION <br />1. Position clamp to align T bolt with rail 2. Rotate clamp clockwise 2/3 of a turn 3. Slide clamp into position against 4. Place second module. <br />slot. lower clamp and insert T-bolt into to engage T-bolt inside rail slot module. <br />rail slot <br />5. Tighten bolt and torque to 15 ft-lbs. <br />NOTE: If excessive force is applied in <br />step 2, the cap may over -rotate causing <br />it to be mis-aligned with the module <br />frame. If this occurs, keep rotating the <br />cap clockwise until it returns to the <br />original position. <br />Lumio <br />SIVIART ENERGY TODAY <br />(SET) <br />1550 DIGITAL DR, LEHI, UT <br />84043, USA <br />SYSTEM INFO <br />(16) 0 CELLS <br />Q.PEAK DUO BLK ML-G10+ <br />(400W ) <br />(16) ENPHASE <br />IQ8PLUS-72-2-US (240V) <br />DC SYSTEM SIZE: 6.400 kWDC <br />AC SYSTEM SIZE: 4.800 kWAC <br />REVISIONS <br />DESCRIPTION I DATE IREV <br />PROJECT NAME & ADDRESS <br />Q <br />(n <br />Z) <br />M <br />O <br />N <br />00 <br />C)) <br />W <br />J <br />LLJ <br />W <br />CD <br />U w <br />Z <br />2 <br />Q <br />0 W <br />— <br />W W <br />� <br />U <br />� <br />W <br />Q <br />N <br />p <br />li <br />O <br />J <br />LL <br />N <br />IS') <br />DATE: 12/6/2022 <br />SHEET NAME <br />EQUIPMENT <br />SPECIFICATIONS <br />SHEET SIZE <br />ANSI B <br />11tr X 17" <br />SHEET NUMBER <br />PV-20 <br />