Laserfiche WebLink
N <br />co <br />A I B I C I D I E I F I G I H <br />AERIAL VIEW <br />ELECTRICAL NOTES <br />GENERAL NOTES <br />-4 r .u. -' ��, �X <br />1. WHERE ALL TERMINALS OF THE <br />1. PRIOR TO THE COMMENCEMENT OF ANY <br />DISCONNECTING MEANS MAY BE <br />WORK, THE CONTRACTOR SHALL NOTIFY <br />- <br />ENERGIZED IN THE OPEN POSITION, A <br />THE DESIGNER OF ANY DISCREPANCIES <br />SIGN WILL BE PROVIDED WARNING OF <br />WITH THE DESIGN IN ANY CAPACITY. <br />THE HAZARDS. (PER ART. 690.17) <br />ESPECIALLY RECOMMENDATIONS, CODES, <br />2. EACH UNGROUNDED CONDUCTOR OF <br />OR REGULATIONS &RULES OF THE <br />THE MULTIWIRE BRANCH CIRCUIT WILL <br />AUTHORITY HAVING JURISDICTION, WHICH <br />BE IDENTIFIED BY PHASE AND SYSTEM. <br />SUPERSEDED THE NEC. <br />(PER ART. 210.5) <br />2. ALL DIMENSIONS TO BE VERIFIED BY <br />-_ _-- - <br />3. A NATIONALLY RECOGNIZED TESTING <br />CONTRACTOR PRIOR TO COMMENCEMENT <br />LABORATORY SHALL LIST ALL <br />OF WORK. <br />117 <br />EQUIPMENT IN COMPLIANCE WITH <br />3. CONTRACTOR IS RESPONSIBLE FOR ALL <br />ARTICLE 110.3. <br />4. ALL WIRES SHALL BE PROVIDED WITH <br />SAFETY PRECAUTIONS, OSHA <br />r• ' <br />REQUIREMENTS ETC. FOR THE SITE, <br />--_- <br />STRAIN RELIEF AT ALL ENTRY POINTS <br />INCLUDING EXISTING SITE HAZARDS. <br />INTO BOXES AS REQUIRED BY UL LISTING <br />4. SYSTEM IS GRID INTERACTIVE/INTERTIED <br />.:-�- <br />5. MODULE FRAMES SHALL BE GROUNDED <br />VIA A UL LISTED POWER -CONDITIONING <br />AT THE UL-LISTED LOCATION PROVIDED <br />INVERTER. <br />' <br />BY THE MANUFACTURER USING <br />UL-LISTED GROUNDING HARDWARE. <br />6. MODULE FRAMES, RAIL, AND POSTS <br />SHALL BE BONDED WITH EQUIPMENT <br />5. SYSTEM HAS NO ENERGY STORAGE OF <br />ANY KIND, OR UPS. <br />6. ALL SOLAR MOUNTING FRAMEWORK TO <br />BE GROUNDED. <br />GROUND CONDUCTORS AND GROUNDED <br />7. FOLLOW MANUFACTURERS SUGGESTED <br />AT THE MAIN ELECTRICAL PANEL. <br />INSTALLATION PRACTICES AND WIRING <br />7. THE DC GROUNDING ELECTRODE <br />CONDUCTOR SHALL BE SIZED <br />SPECIFICATIONS. <br />8. ALL WORK TO BE IN COMPLIANCE WITH <br />RESIDENCE PHOTO <br />ACCORDING TO ARTICLE 250.166B & <br />THE INTERNATIONAL BUILDING CODES. <br />690.47. <br />(IBC) <br />9. ALL ELECTRICAL WORK TO BE IN <br />ORJO^, <br />COMPLIANCE WITH THE NATIONAL <br />t ' <br />�QF W_AS14 <br />ELECTRIC CODE (NEC). <br />ANT 0 <br />h 2 <br />2011 8 Q <br />r;N�N <br />9/13/2022 <br />'.� <br />STRUCTURAL ONLY <br />SHEET INDEX <br />PV 1 COVER PAGE <br />PV 5 MOUNTING DIAGRAM <br />PV 2 SITE PLAN <br />PV 6 PLACARD <br />PV 3 ELECTRICAL DIAGRAM <br />CUT SHEETS ATTACHED <br />PV 4 CHIKO MOUNTING <br />-�. - - <br />CONFIDENTIAL - THE INFORMATION CONTAINED <br />DRAWN BY: <br />DWG <br />DRAWING SCALE: <br />CUSTOM <br />IN THIS PACKET AND SUBSEQUENT CUTSHEETS <br />SHALL NOT BE USED FOR THE BENEFIT OF <br />ANYONE OUTSIDE SOLGEN POWER. NEITHER <br />SO LG E N SHALL IT BE DISCLOSED TO OTHERS OUTSIDE <br />SOLGEN POWER <br />5100 ELM RD, <br />PASCO, WA 99301 <br />McKenzie Beginski <br />DESIGN <br />1 <br />DATE: <br />14/09/2022 <br />P O W E R THE RECIPIENT'S ORGANIZATION, EXCEPT IN <br />PAGE# <br />CONNECTION WITH THE SALE AND USE OF THE <br />P: 509-931-1663 <br />6615 Commercial Ave Everett WA 98203 <br />RESPECTIVE EQUIPMENT, WITHOUT WRITTEN <br />PV 1 <br />CONSENT FROM SOLGEN POWER. <br />