Laserfiche WebLink
State of Washington Department of Ecology <br />City of Everett <br />Beverly Lake Water Quality Retrofit Project <br />Agreement No. WQC-2020-COE-00091 <br />Approved Indirect Costs Rate: <br />Recipient Match %: <br />InKind Interlocal Allowed: <br />InKind Other Allowed: <br />Approved State Indirect: 30% <br />25% <br />No <br />No <br />Is this Funding Distribution used to match a federal grant? No <br />SFAP <br />Task Total <br />Grant and Loan Administration <br />$ 12,500.00 <br />Design Plans and Specs, Environmental Review <br />$ 90,500.00 <br />Construction Management <br />$ 25,000.00 <br />Construction <br />$ 860,000.00 <br />CHANGES TO SCOPE OF WORK <br />Task Number: 4 <br />Task Title: Construction <br />Total: $ 988,000.00 <br />Task Cost: $860,000.00 <br />Page 2 of 17 <br />Task Description: <br />A. The RECIPIENT will complete construction of the project in accordance with ECOLOGY -accepted plans and <br />specifications. The construction project will include installation of GULD-approved stormwater treatment devices to mitigate <br />runoff from approximately 50 acres of pollution generating impervious surfaces. <br />B. Calculate and submit an equivalent new/re-development area for the completed retrofit project(s) using the methods <br />outlined in the Stormwater Project Deliverables Guidance, Section D. <br />Task Goal Statement: <br />Construction of the project in accordance with ECOLOGY -accepted plans and specifications. <br />Task Expected Outcome: <br />Constructed project will provide water quality benefits including reductions in TSS. <br />Template Version 10/30/2015 <br />