My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 12/16/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering Inc. 12/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:15 PM
Creation date
3/3/2023 1:19:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
12/16/2022
Council Approval Date
12/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Services for the Replacement of Reservoir 3
Public Works WO Number
UP3739
Tracking Number
0003587
Total Compensation
$2,994,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 7/19/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENCY CUSTOMER ID: <br />LOC #: <br />ADDITIONAL REMARKS SCHEDULE Page <br /> <br />2 of 2 <br /> <br /> <br />AGENCY <br />Willis Towers Watson Midwest, Inc. <br />NAMED INSURED <br />HDR Engineering, Inc. <br />1917 South 67th Street <br />Omaha, NE 68106 POLICY NUMBER <br />See Page 1 <br />CARRIER <br />See Page 1 <br />NAIC CODE <br />See Page 1 EFFECTIVE DATE: See Page 1 <br />ADDITIONAL REMARKS <br />THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, <br />FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance <br />Project: The City of Everett, Washington (City) recently decided to embark on this replacement of Reservoir No. 3 as <br />quickly as possible because of the reservoir cover’s rapidly deteriorating structural condition. The objective of this <br />project is to design and prepare plans, specifications, and estimate (PS&E) for the construction of a minimum of two <br />ground storage reservoirs (GSR) totaling a minimum of 20 MG storage to meet current seismic code requirements. <br /> <br />General Liability policy applies to Offsite operations. <br /> <br />Additional Insureds: City of Everett, its officers, employees and agents. <br /> <br />Employers Liability for the Monopolistic States of ND, OH, WA & WY is provided in the Workers Compensation policy. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. <br />The ACORD name and logo are registered marks of ACORD <br />SR ID: 23337361 BATCH: 2745145 CERT: W26698720
The URL can be used to link to this page
Your browser does not support the video tag.