My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 12/16/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering Inc. 12/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:15 PM
Creation date
3/3/2023 1:19:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
12/16/2022
Council Approval Date
12/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Services for the Replacement of Reservoir 3
Public Works WO Number
UP3739
Tracking Number
0003587
Total Compensation
$2,994,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 7/19/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by "occur- <br />rences" under Section I – Coverage A, and for all <br />medical expenses caused by accidents under <br />Section I – Coverage C, which cannot be at- <br />tributed only to ongoing operations at a single <br />designated construction project shown in the <br />Schedule above: <br />1. Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products-completed Operations Aggregate <br />Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Desig- <br />nated Construction Project General Aggre- <br />gate Limit. <br />C. When coverage for liability arising out of the <br />"products-completed operations hazard" is pro- <br />vided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products-completed operations hazard" will <br />reduce the Products-completed Operations Ag- <br />gregate Limit, and not reduce the General Ag- <br />gregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetables, the project will <br />still be deemed to be the same construction pro- <br />ject. <br />E. The provisions of Section III – Limits Of Insur- <br />ance not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 25 03 05 09
The URL can be used to link to this page
Your browser does not support the video tag.