Laserfiche WebLink
EVERETT PUBLIC WORKS DEPARTMENT  SMITH ISLAND ESTUARY RESTORATION YEARS 5 & 6 MONITORING <br /> <br /> NSD will work with EPWD to document the benefits of estuary-wide data collection to the <br />project and coordinate with regulatory agencies regarding change from the Advance <br />Mitigation Plan methods if that is determined to be necessary. <br /> Snohomish County/Tulalip Tribes will provide summary data collected within the site to NSD <br />in time for inclusion in the Year 5 monitoring report. <br /> <br />Task 4: Year 5 Wildlife Use Monitoring <br />The Project site is intended to provide habitat for a variety of wildlife species, including waterfowl <br />and shorebirds. Per Tables 6-1 and 6-2 of the Advance Mitigation Plan, wildlife use monitoring is <br />required in Year 5 to document the wildlife species that are using the project site. <br />Data Collection <br />Wildlife monitoring will take place during both spring and summer sampling periods when maximum <br />use by wildlife, including migratory shorebirds typically occurs. Each monitoring period will extend <br />across an entire day to capture wildlife use at both low and high tide conditions. <br />NSD will conduct thirty-minute point count surveys at or near the survey stations utilized during the <br />Year 3 data collection. The location of the fixed survey stations will be dispersed around the Project <br />site in order to allow as many habitats as possible to be viewed during each survey and will be <br />consistent to the extent practicable with the survey stations utilized during the Year 3 data <br />collection. In addition, the biologist will walk the western setback dike and the southern dike and <br />will enter the Project site at selected locations chosen to provide access to several different <br />vegetation communities, if such locations are physically accessible and can be walked without <br />causing unnecessary disturbance to wildlife. <br />Data Analysis <br />NSD will document the wildlife species documented using the mitigation site per the performance <br />standards specified in the Advance Mitigation Plan and will compare the species documented to that <br />reported in the Years 1 and 3 Monitoring Reports. NSD will prepare summary tables and figures for <br />inclusion in the Year 5 Monitoring Report (Task 5). <br /> <br />Task 4 Deliverables: <br /> Year 5 wildlife data analysis and summary tables for inclusion in Task 5, Year 5 Monitoring <br />Report <br />Task 4 Assumptions: <br /> The site can be safely accessed by foot for the wildlife use transects. <br /> Site conditions are such that spring and summer wildlife use data collection can each be <br />accomplished within 1, 10-hour day including travel by a team of two biologists. <br /> <br />Task 5: Year 5 Performance Monitoring Report <br />DocuSign Envelope ID: B75A46E0-B4A7-4C6C-B91E-69B691B92514