Laserfiche WebLink
• <br /> VV <br /> Public Works <br /> Everett Station 80 Stall Parking Expansion <br /> Rodarte Construction <br /> DAILY INSPECTION DIARY WORK ORDER#2019-2535 <br /> (1) DAY Friday DATE: 11-15-2019 WORK PERIOD: 7:30am to 3:30pm <br /> WEATHER: Rain TEMP. MAX 55°F: MIN 40°F: PRECIPITATION: 0% <br /> (2)NUMBER AND CLASS OF PERSONNEL EMPLOYED: <br /> 1 —Foreman <br /> 1-Operator <br /> (3) EQUIPMENT: <br /> NO. TYPE HR NO TYPE I11Z <br /> 1 Komatsu PC 228 Crawler Mounted 8 <br /> Hydraulic Excavator <br /> 1 CAT 4WD Articulated wheel Front Loader 8 <br /> 924G(#336) <br /> (4)WORK ACCOMPLISHED THIS DAY: <br /> RODARTE: <br /> Rodarte continues vegetation removal at transit station at 36th and Smith St. using the Komatsu PC 228. Rodarte also <br /> removing existing ecology block wall(bid item no. 18)and stacking them on the south west corner of the project. <br /> Installing temporary interceptor swale per circle note 4/detail sheet SPD1 <br /> Importing gravel borrow and parking lot embankment. <br /> Rain Event today_Y_YIN TSEC Checked_NA_Y/N <br /> Tr ffic control checked at NA AM and NA PM <br /> 11-15-2019 <br /> Mike Nguyen,Constructio Inspec r DATE <br /> 1 <br />