Laserfiche WebLink
410 • <br /> Cs tt <br /> tY <br /> 80 Stallof Everett Park& Ride Expansion006363 -4 PW 1807 --018 <br /> Item#82—Material Use Tax. Create new item#82, titled Material Use Tax, to be paid for in the <br /> actual tracked and tabulated dollar value, to be paid for via this item. Generate a value of <br /> $22,000.00 for this item. <br /> The result of adding the above three bid items to the Contract results in a Contract price <br /> increase of$95,081.75. <br /> JUSTIFICATION: <br /> Item #80—8' Anti Climb Black Coated Fence. This bid item is being added at the request of <br /> Everett Transit. <br /> Item #81 —Crushed Surfacing Top Course in the new unit price of$37.50/ton. This item is <br /> being added to the Contract to pay for overruns in Crushed Surfacing Top Course beyond 125% <br /> of the original bid plan quantity at a revised negotiate unit price of$37.50/ton, versus the as bid <br /> price of$45.00/ton, pursuant to section 1-04.6 of the Standard Specifications. The original plan <br /> quantity was estimated at 10 tons. Actual quantities installed were 610.76 tons. <br /> Item #82—Material Use Tax. This item is being added to pay for Material Use Tax on <br /> materials that were incorporated in the project, pursuant to section 1-07.2(1) of Standard <br /> Specifications and WAC 458-20-171. <br /> CONTRACT TIME: <br /> No additional working days will be added to the Contract Time by Change Order#1. <br /> END OF SECTION 00 6363 <br /> 00 6363 -4 CHANGE ORDER -AGREED <br />