My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2023-03-14
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2023-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:10:37 PM
Creation date
3/13/2023 9:08:44 AM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Notes
Project came over form Construction Maangement without Work Order #
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 63 63 33/ <br /> 3600 Smith Street Clean Up <br /> CITY <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By:_ <br /> Construction Project Manager (if Engineering Department Director <br /> Manager (if applicable) Manager (if <br /> applicable) applicable) <br /> _ Date: _ Date: Date: Date: <br /> CONTRACTOR <br /> By Date: <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Schedule A—Clean Up portion of proposal. Change order#1 modifies two items on the Clean <br /> Up portion of the proposal as follows: <br /> Bid Item #2 — Excavation and Hauling. Modify bid item #1 titled, "Excavation and Hauling", by <br /> adding an additional 557.31 tons of Excavation and Hauling, at the unit price of $11.68 per ton, <br /> resulting in a price increase of$6,509.38 to the Contract. <br /> 00 63 63 - 3 CHANGE ORDER -AGREED <br />
The URL can be used to link to this page
Your browser does not support the video tag.