Laserfiche WebLink
IF <br /> • "iv <br /> S <br /> k <br /> Public Works <br /> Everett Station 80 Stall Parking Expansion <br /> Rodarte Construction <br /> DAILY INSPECTION DIARY WORK ORDER#2019-2535 <br /> (1) DAY Tuesday DATE: 11-05-2019 WORK PERIOD: 6am to 2:30pm <br /> WEATHER: Sunny TEMP. MAX 55°F: MIN 40°F: PRECIPITATION: 0% <br /> (2)NUMBER AND CLASS OF PERSONNEL EMPLOYED: <br /> (3) EQUIPMENT: <br /> NO. TYPE lilt NO TYPE 1112 <br /> l CAT 320C U Hydraulic Excavator w/steel <br /> tracks(#3 3 3) <br /> 1 CAT 4WD Articulated wheel Front Loader <br /> 924G(#336) <br /> (4)WORK ACCOMPLISHED THIS DAY: <br /> RODARTE: <br /> No work performed. Contractor not on-site. <br /> 2 pieces of equipment on-site(see above),and a temporary 6' tall chain link fence is installed around the perimeter of the <br /> work site. <br /> Rain Event today_N_Y/N TSEC Checked_NA_Y/N <br /> Traffic control checked at NA AM and NA PM <br /> 11-05-2019 <br /> Joe Jirak,Construction Inspector DATE <br /> 1 <br />