My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/03/15 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/03/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 11:00:10 AM
Creation date
3/16/2023 11:01:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E EVERETT <br />Project title: Call for Bids for the Inductive Charging Infrastructure Field Installation <br />City Council Agenda Item Cover Sheet <br />Council Bill # ,rerujjice use <br />Agenda dates requested: <br />3/15/2023 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Department(s) involved: <br />Transit <br />Contact person: <br />Vincent Bruscas <br />Phone number: <br />425-257-6292 <br />Email: <br />vbruscas@everettwa.gov <br />Initialed by: <br />rEft <br />Department head <br />Administration <br />Council President <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Inductive Charging Infrastructure Field Installation <br />Elcon Associates, Inc. <br />College Station, Everett Station and Seaway Transit Center <br />PSA 2021-1.34 Elcon Associates, Inc. dated .lune 1, 2022 <br />425/Transportation Services, WSDOT Green Transportation Grant <br />Fiscal summary statement: <br />The engineer estimates for the construction of the 300kW inductive charging system <br />and field installation project is $300,000. <br />The project is funded with <br />Everett Transit Fund 425 $480,000 <br />Green Transportation Grant $1,920,000 <br />Total Project $2,4000,000 <br />Expended funds to date $160,622 (engineering and design) <br />Available funds $2,239,378 <br />Project summary statement: <br />Elcon Associates, Inc. provided construction bid specifications and bid drawings for the <br />construction and installation of field charging systems. The inductive charging <br />infrastructure field Installation project will construct inground inductive chargers at <br />College Station, Everett Station and Seaway Transit Center with two 300kW charging <br />systems at each location. <br />Recommendation (exact action requested of Council): <br />Authorize the Call for Bids for the Inductive Charging Infrastructure Field Installation <br />Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.