Laserfiche WebLink
VERETT <br />0 <br />Permit Number: E2211-063 <br />Applied: 11/8/2022 <br />Issued:11/14/2022 <br />Status: FINALED <br />Parent Permit: B2211-062 <br />Parent Project: <br />Details: <br />24 Panel CITY IQ8 Inverter <br />Permit Inspections <br />City of Everett <br />Approved:11/14/2022 <br />Finaled: 3/13/2023 <br />Description: (CIRCUIT) ROOFTOP SOLAR <br />Site Address: 918 COLBY AVE <br />City, State Zip Code: EVERETT, WA 98201 <br />Applicant: LUMIO HX (ELEC) INC <br />Owner: SIMPSON CHARLES NICHOLAS EMPSON & SUSAN <br />Contractor: LUMIO HX (ELEC) INC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />1/26/2023 <br />1/26/2023 <br />ELEC 10-FINAL <br />STEVE BANKS <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />1/23/2023 9:45 AM LUMIO HX (ELEC) INC <br />Contact Name: LUMIO HX (ELEC) INC <br />Site Address: 918 COLBY AVE <br />Phone:3607776681 <br />e-Mail: taylor.sturgis@lumio.com <br />Unable to perform inspection. Have one line diagram and required paperwork for both electrical and building inspections prior to rescheduling <br />inspections. <br />2/10/2023 <br />2/10/2023 <br />ELEC 10-FINAL <br />STEVE BANKS <br />CORRECTION <br />REQUIRED <br />Notes: <br />828-545-1395 <br />nick_simpsonl@hotmail.com <br />The grounding electric conductor must land on the grounded bus in the service disconnect for the pv system. Install a bonding jumper screw on the <br />grounded bus in the service disconnect of the pv service. Install all labels required per code, such as dual, fed, rapid, shut down, etc. The grounding <br />electrode conductor for the pv system must be attached to the grounding electrode or conductor. <br />3/10/2023 <br />3/10/2023 <br />ELEC 10-FINAL <br />STEVE BANKS <br />APPRVD-PERMIT <br />FINAL <br />Notes: <br />828-545-1395 <br />nick_simpsonl@hotmail.com <br />I <br />Printed: Monday, 13 March, 2023 1 of 1 rk <br />SUPERION <br />