SCOPE OF WORK
<br />TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER RESIDENCE
<br />LOCATED AT 1815 LOMBARD AVE, EVERETT, WA 98201, USA.
<br />THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY
<br />GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT.
<br />THE PV SYSTEM DOES NOT INCLUDE STORAGE BATTERIES.
<br />EQUIPMENT SUMMARY
<br />9 Q CELLS Q.PEAK DUO BLK ML-G10+ (400W) MODULES
<br />9 ENPHASE IQ8PLUS-72-2-US (240V) MICROINVERTERS
<br />GENERAL NOTES
<br />• THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND
<br />OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE
<br />MODIFICATIONS IN CONSTRUCTION DETAILS.
<br />• ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR
<br />INSTALLATION OF ANY EQUIPMENT AT SITE.
<br />• CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL
<br />PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION.
<br />• CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS
<br />AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER
<br />BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION AND
<br />ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE
<br />CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL
<br />COMPENSATION.
<br />• DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL, FLOORS,
<br />ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE
<br />CONTRACTOR AT NO ADDITIONAL COST.
<br />• THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND
<br />COMPLETION OF THE WORK WITH APPROVED MATERIALS.
<br />• NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE
<br />ARCHITECT.
<br />• CONTRACTOR SHALL OBTAIN BULDING PERMIT. NO WORK TO START UNLESS BUILDING
<br />PERMIT IS PROPERLY DISPLAYED.
<br />• ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE
<br />WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, THE DEPARTMENT OF
<br />ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES.
<br />• IT 1 S ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL
<br />PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING.
<br />THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH.
<br />• ALL EXPOSED PLUMBING, HVAC, ELECTRICAL DUCTWORK, PIPING AND CONDUITS ARE TO
<br />BE PAINTED BY GENERAL CONTRACTOR.
<br />• THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE
<br />LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRIC CODE.
<br />• THE CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS, CERTIFICATIONS,
<br />ETC. AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES.
<br />• CONTRACTORS SHALL OBTAIN FIRE CERTIF. UPON COMPLETION OF WORK.
<br />I GOVERNING CODES I
<br />2018 INTERNATIONAL FIRE CODE
<br />2018 INTERNATIONAL BUILDING CODE
<br />2018 INTERNATIONAL RESIDENTIAL CODE
<br />WASHINGTON ADMINISTRATIVE CODE (WAC)
<br />2020 NATIONAL ELECTRICAL CODE
<br />I AHJ NAME: CITY OF EVERETT I
<br />WIRING AND CONDUIT NOTES
<br />• ALL CONDUIT SIZES AND TYPES SHALL BE LISTED FOR ITS PURPOSE AND
<br />APPROVAL FOR THE SITE APPLICATIONS
<br />• ALL PV CABLES AND HOMERUN WIRES BE #10AWG *USE-2, PV WIRE, OR
<br />PROPRIETARY SOLAR CABLING SPECIFIED BY MFR, OR EQUIVALENT; ROUTED TO
<br />SOURCE CIRCUIT COMBINER BOXES AS REQUIRED
<br />• ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE
<br />DERATED ACCORDING TO AS PER LATEST NEC CODE.
<br />• EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C RATED, WET AND UV
<br />RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE
<br />USED TO PROTECT WIRE FROM SHARP EDGES
<br />• PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2
<br />INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 1000V AS PER
<br />APPLICABLE NEC
<br />• 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER
<br />VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE
<br />MEANS
<br />• ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION
<br />• VOLTAGE DROP LIMITED TO 2%
<br />• AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK,
<br />PHASE B OR 1-2- RED, PHASE C OR 1-3- BLUE, NEUTRAL- WHITE/GRAY
<br />• VOLTAGE DROP LIMITED TO 2%
<br />• AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE AOR L1- BLACK,
<br />PHASE B OR 1-2- RED, PHASE C OR 1-3- BLUE, NEUTRAL- WHITE/GRAY
<br />SYSTEM RATING
<br />PHOTOVOLTAIC SYSTEM FIRE
<br />CLASSIFICATION LISTING IN
<br />ACCORDANCE WITH UL 1703
<br />STANDARD.
<br />3.600 kWDC
<br />2.700 kWAC
<br />SHEETINDEX
<br />PV1
<br />COVER PAGE
<br />PV2
<br />SITE PLAN
<br />PV3
<br />ROOF PLAN
<br />PV4
<br />STRING LAYOUT & BOM
<br />PV5-PV6
<br />ATTACHMENT DETAILS
<br />PV7
<br />ELECTRICAL LINE & CALCS.
<br />PV8
<br />SPECIFICATIONS & NOTES
<br />PV9-PV10
<br />SIGNAGE
<br />PV11
<br />JOB SAFETY PLAN
<br />PV12-PV21
<br />I EQUIPMENT SPECIFICATIONS
<br />HOUSE PHOTO SCALE: NTS
<br />egion Park
<br />19
<br />ELECTRICAL NOTES
<br />• ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION.
<br />• ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET
<br />ENVIRONMENT.
<br />NORTHWEST
<br />• WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY
<br />EVERETT
<br />TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY.
<br />• WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL
<br />COMPLY WITH NEC 110.26.
<br />• WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE
<br />CONTRACTOR SHALL SIZE THEM ACCORDINGLY.
<br />• ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE.
<br />• MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE
<br />SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURERS INSTRUCTION.
<br />• MODULE SUPPORT RAIL SHALL BE BONDED TO THE MODULE
<br />Everett
<br />n' o
<br />�IVo gleucliaTerms of Use Re
<br />VICINITY MAP
<br />\�
<br />Spencer
<br />Island Pa
<br />SCALE: NTS
<br />Lum'160
<br />SMART ENERGY TODAY
<br />(SET)
<br />1550 DIGITAL DR, LEHI, UT
<br />84043, USA
<br />SYSTEM INFO
<br />(9) Q CELLS
<br />Q.PEAK DUO BILK ML-G10+
<br />(40OW)
<br />(9) ENPHASE
<br />IQ8PLUS-72-2-US (240V)
<br />DC SYSTEM SIZE: 3.600 kWDC
<br />AC SYSTEM SIZE: 2.700 kWAC
<br />REVISIONS
<br />DESCRIPTION DATE REV
<br />PROJECT NAME & ADDRESS
<br />0
<br />J
<br />Q LU
<br />z U
<br />O z
<br />W
<br />U �
<br />Q
<br />U)
<br />W
<br />a
<br />75
<br />Q
<br />U)
<br />1-7
<br />N
<br />00
<br />O7
<br />Q
<br />W
<br />of
<br />W
<br />Lu
<br />LLI
<br />>
<br />Q
<br />0
<br />Q
<br />00
<br />2
<br />O
<br />J
<br />Ln
<br />CD
<br />0
<br />I`
<br />0
<br />0
<br />M
<br />N
<br />00
<br />M
<br />0
<br />0
<br />z
<br />D_
<br />EN
<br />I DATE:12/3/2022 1
<br />SHEET NAME
<br />COVER PAGE
<br />SHEET SIZE
<br />ANSI B
<br />11" X 17"
<br />SHEET NUMBER
<br />PV-1
<br />
|