|
T
<br />RESTROOM
<br />PLUMBING
<br />SCHEDULE:
<br />_
<br />REFERENCE
<br />1-3.1 FOR REMAINDER OF SPECIFICATIONS
<br />-
<br />REFERENCE
<br />1-0.2 FOR MOUNTING HEIGHTS
<br />TAG
<br />ITEM
<br />PROVIDED BY
<br />PRODUCT
<br />DESCIRPTION
<br />PS PS PB P6 PS PS
<br />42" 18" P4rcd2 P4 18" 42"
<br />P-1
<br />FAUCET
<br />GC
<br />KOHLER, K-970604
<br />HINT, SINGLE -HANDLE BATHROOM
<br />SNK FAUCET, POLISHED CHROME
<br />111
<br />P-2
<br />WALL MOUNTED SINK
<br />GC
<br />AMERICAN STANDARD
<br />LUCERNE WALL -HUNG LAVATORY
<br />P-3
<br />PAPER TOWEL DISPENSER &
<br />TRASH UNIT
<br />GC
<br />BOBRICK, 636903
<br />TRIMLINE SERIES, RECESSED PAPER
<br />TOWEL DISPENSER & WASTE,
<br />STAINLESS STEEL
<br />ADA ADA
<br />RESTROOM RESTROOM
<br />P-4
<br />FLOOR MOUNTED TOILET
<br />GC
<br />BLD STD
<br />128 PS PS 127
<br />36" 36"
<br />P-5
<br />ADA GRAB BARS (18", 36" & 42")
<br />GC
<br />BOBRICK, B-5806 SERIES
<br />STRAIGHT GRAB BAR, 18", 36" & 42"
<br />P-8
<br />TOILET PAPER DISPENSER, TRASH
<br />&SEAT COVER UNIT
<br />GC
<br />BOBRICK, B-3092
<br />CLASSIC SERIES RECESSED TOILET
<br />SEAT -COVER DISPENSER, WASTE
<br />DISPOSAL AND TOILET TISSUE
<br />DISPENSER
<br />1�.1 ^ PS P8 4 1sg�1
<br />3 Pi Pi s
<br />P2 P2
<br />P3 P7 P7 P3
<br />P-7
<br />WALL MOUNTED MIRROR
<br />GC
<br />MILLWORK
<br />FRAMELESS FRENCH CLEAT WALL
<br />MOUNTED MIRROR
<br />CONTURA SERIES,
<br />P-8
<br />WALL MOUNTED SOAP DISPENSER
<br />GC
<br />BOBRICK, B4112
<br />SURFACE -MOUNTED SOAP
<br />DISPENSER
<br />OADA RESTROOMS - ENLARGED PLAN
<br />SCALE: 318" = V-0"
<br />SCHEDULED LAMINATE, PL-5
<br />PAPER TOWEL & WASTE UNIT
<br />SCHEDULED BASE
<br />OELEVATION
<br />SCALE: 3/8" = V-0"
<br />NEW STOREFRONT MULLION
<br />NEW INSULATED METAL PANEL
<br />TENANT PROVIDED EQUIPMENT
<br />NEW STOREFRONT MULLION
<br />EXISTING STOREFRONT SYSTEM
<br />EXISTING BASE
<br />OELEVATION - ATM & NIGHT DROP
<br />SCALE: 318" = V-0"
<br />PLASTIC LAMINATE TRANSACTIOP
<br />TOP & VERTICAL PANEL, PLA
<br />PLASTIC LAMINATE SHELF, PLA
<br />'7 q _p•
<br />Y PLASTIC LAMINATE VERTICAL
<br />3/4" 6 3/ FACE, PL-1
<br />PLASTIC LAMINATE VERTICAL
<br />FACE, PL-2
<br />SCHEDULED BASE
<br />OELEVATION - TELLER #110 1p ELEVATION - TELLER #110
<br />SCALE: 318" = V-0" SCALE: 318" = V-0"
<br />9 r
<br />PLASTIC LAMINATE UPPER
<br />CABINET WIDOOR & (1) HT. ADJ.
<br />2
<br />SHELF, Pi
<br />$ H
<br />PLASTIC LAMINATE COUNTERTOP
<br />& 4"H BACK & SIDE SPLASH, PL-X
<br />—
<br />PLASTIC LAMINATE BASE CABINET
<br />W/DRAWER, DOOR & (2) HT. ADJ.
<br />SHELVES, PL-X
<br />(10) EQ
<br />E9 E9
<br />iaa
<br />7
<br />Q Q Q 0 1-9.3
<br />----
<br />—
<br />—
<br />—
<br />—
<br />—
<br />—
<br />---
<br />€ a (10) EQ
<br />E 13 ELEVATION -WORK AREA #108
<br />� o SCALE: 3I8"=1'-0"
<br />1
<br />SCHEDULED BASE
<br />SCHLUTER JOLLY, XXX FINISH
<br />SCHEDULED LAMINATE, PL-5
<br />GRAB BARS GRAB BARS
<br />TOILET PAPER/SEAT/TRASH UNIT
<br />TOILET
<br />SCHEDULED BASE
<br />OELEVATION O ELEVATION
<br />SCALE: 3l8" = V-0" SCALE: 3/8" = V-0"
<br />NEW INSULATED METAL PANEL
<br />EXISTING STOREFRONT SYSTEM
<br />EXISTING BASE
<br />O7 ELEVATION - BREAK #129
<br />SCALE: 318" = V-0"
<br />PLASTIC LAMINATE TRANSACTION
<br />—_
<br />TOP & WATERFALL EDGE, PL-1
<br />PLASTIC LAMINATE VERTICAL
<br />II
<br />III
<br />FIXED PANEL BEYOND, PL-2
<br />GROMMET, SIZE TBD
<br />CPU OPEN SHELVING, PL-2
<br />II
<br />BOX/BOX/LEGAL FILE, PL-2
<br />ILII
<br />SCHEDULED BASE
<br />PLASTIC LAMINATE VERTICAL
<br />FACE, PL-1
<br />11
<br />ELEVATION - TELLER #110
<br />SCALE: 318" = V-0"
<br />PLASTIC LAMINATE COUNTERTOP
<br />W/CONCEALED BRACKET
<br />SUPPORTS, PL-X
<br />Og ELEVATION - ENTRY #101
<br />SCALE: 318" = 1'-0"
<br />00
<br />wwIHw
<br />PLASTIC LAMINATE UPPER
<br />CABINET W/DOOR & (1) HT. ADJ
<br />SHELF, PL-X
<br />PLASTIC LAMINATE COUNTERT01
<br />& 4"H BACK & SIDE SPLASH, PL-X
<br />PLASTIC LAMINATE BASE CABINE
<br />W/DRAWER, DOOR & (2) HT. ADJ.
<br />SHELVES, PL-X
<br />SCHEDULED BASE
<br />EQ
<br />ELEVATION - TELLER #110
<br />SCALE: 318" = V-0"
<br />15) ELEVATION -BREAK #129 (16) ELEVATION -BREAK #129
<br />MIRROR
<br />SCHLUTER JOLLY, XXX FINISH
<br />SOAP DISPENSER
<br />SINK & FAUCET
<br />SCHEDULED LAMINATE, PL-5
<br />TOILET
<br />SCHEDULED BASE
<br />ASTIC LAMINATE COUNTERTOP
<br />VTERFALL END PANEL, PL-X
<br />IGLE IRON ATTACHMENT AT
<br />ILUMN, TYP.
<br />TENANT PROVIDED EQUIPMENT
<br />PLASTIC LAMINATE COUNTERTOP
<br />& 4'H BACK & SIDE SPLASH, PL-X
<br />PLASTIC LAMINATE BASE CABINET
<br />W/DRAWER, DOOR & (2) HT. ADJ.
<br />SHELVES, PL-X
<br />SCHEDULED BASE
<br />PLASTIC LAMINATE
<br />COUNTERTOP & 4"H BACK
<br />& SIDE SPLASH, PL-X
<br />PLASTIC LAMINATE BASE
<br />CABINET W/DRAWER, DOOR
<br />& (2) HT. ADJ. SHELVES,
<br />PL-X
<br />PLASTIC LAMINATE PULL
<br />OUT TRASH, PL-X
<br />SCHEDULED BASE
<br />N
<br />U
<br />W
<br />2
<br />O
<br />U
<br />N
<br />Lnto
<br />W
<br />Z00
<br />O
<br />Q
<br />O
<br />C W
<br />N P
<br />V
<br />a�
<br />y
<br />N N
<br />01m
<br />HERITAGE BANK
<br />FRONTIER BANK BLD
<br />2831 COLBY AVE
<br />EVERETT, WA 98201
<br />DESIGN CPC
<br />DRAWN CS
<br />CHECKED AC
<br />NO. 22-0419
<br />ezaa REGISTERED
<br />AL`R^�C�yH)IITECCT
<br />CHARLOTTE PATfER50N
<br />STATE OF WASHINGTON
<br />7/13/2022 PERMIT REVIEW SET
<br />7/1812022 PERMIT SET
<br />Elevations
<br />1-8.1
<br />2017. JPC ArcNteUs. PLLC
<br />
|