Laserfiche WebLink
ABBREVIATIONS: <br />GENERAL NOTES: <br />DEMOLITION NOTES: <br />REFLECTIVE CEILING NOTES: <br />AJC <br />AIRCONDITIONING <br />1. REFER TO BASIC BUILDING SPECIFICATIONS, REQUIREMENTS AND STANDARDS FOR EXISTING <br />28. REFER TO MILLWORK SHOP DRAWINGS FOR SPECIFIC DETAILS OF COORDINATION BETWEEN <br />1. <br />OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS OF SAME IN CONTRACT PRICE. <br />1. <br />COORDINATE THE WORK OF ALL TRADES INVOLVED IN THE CEILING WORK TO ENSURE CLEARANCES FOR FIXTURES, <br />ACT <br />ACOUSTICALCEILINGTILE <br />SHELL AND CORE CONSTRUCTION. ALL WORK IS TO BE COMPATIBLE WITH EXISTING <br />DRYWALUMILLWORK CONDITIONS. <br />DUCTS, PIPING, CEILING SUSPENSION SYSTEM, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS <br />AFF <br />A <br />ABOVE FINISH FLOOR <br />AUTHORITIES HAVING JURISDICTION <br />CONSTRUCTION. <br />2. <br />FURNISH ALL LABOR AND MATERIALSIEQUIPMENT TO COMPLETE DEMOLITION AND REMOVAL OF ALL <br />INDICATED ON ARCHITECTS DRAWINGS, <br />ALT. <br />ALTERNATE <br />29. ALL GLASS SHALL BE CLEAR TEMPERED GLASS, UNLESS OTHERWISE NOTED. GLAZING TONG MARKS <br />ITEMS AS INDICATED. <br />APPROX. <br />APPROXIMATE <br />2. ALL WORK SHALL CONFORM TO APPLICABLE CURRENT FEDERAL, STATE AND LOCAL CODES. THE <br />SHALL NOT BE VISIBLE. CLEAN AND POLISH ALL GLASS PRIOR TO PROJECT DELIVERY. <br />2. <br />PERIMETER CEILING ANGLE, WHERE OCCURS, SHALL BE INSTALLED TIGHT TO VERTICAL SURFACES, FREE FROM <br />BD <br />BOARD <br />CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATION OF AND COORDINATION WITH <br />3. <br />CONTRACTOR SHALL KEEP CONSTRUCTION AREA FREE OF DUST AND DEBRIS FOR THE DURATION OF <br />CURVES, BREAKS OR OTHER IRREGULARITIES AND PAINTED TO MATCH CEILING FINISH. <br />BLDG <br />BUILDING <br />CITY AND STATE AGENCIES, AND PROVIDE REQUIRED PERMITS. ALL TESTS AND INSPECTIONS <br />30. ALL MILLWORK TO BE FASTENED TO THE PARTITION. PROVIDE NON-COMBUSTIBLE BLOCKING FOR ALL <br />CONSTRUCTION. <br />BLK <br />BLOCK <br />ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL <br />MILLWORK NOT SUPPORTED BY FLOOR OR ABOVE 4'-W HT. ALL CONCEALED LUMBER & BLOCKING <br />3. <br />FURNISH AND INSTALL ALL ASSOCIATED TRIM AND SEISMIC BRACING AS REQUIRED. <br />BLKG <br />BDT <br />BLOCKINBE <br />BOTTOM OM <br />PAID FOR BY THE CONTRACTOR. <br />TO BE FIRE TREATED. <br />4. <br />IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN QUESTION <br />4. <br />LIGHT FIXTURES, NEW SPRINKLERS AND OTHER CEILING ELEMENTS SHALL BE CENTERED IN THE 2'X2' SECTION OF <br />B <br />BUILDING STANDARD <br />WITH THE ARCHITECT BEFORE PROCEEDING. <br />INDIVIDUAL CEILING TILES U.N.O. (EXIST. SPRINKLERS TO REMAIN UNLESS CONFLICT WITH NEW ELEMENTS). <br />BU <br />BUILT UP <br />3. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS, <br />31. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR: HVAC, CARPET SEAMING, LIGHTING, CASEWORK. <br />EQUIPMENT AND TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING <br />5. <br />AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM <br />B <br />CAB <br />CABINET <br />FOR THE EXECUTION OF THE WORK. BY SUBMITTING A PROPOSAL THE CONTRACTOR <br />32. MOISTURE TEST- REQUIRED FOR ALL ON GRADE SLAB CONDITIONS DURING THE CONSTRUCTION <br />CLEAN' CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED. <br />5. <br />PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM MAINTENANCE, AND MATCH ADJACENT <br />CLGNECESSARY <br />CUR <br />CEILING <br />CLEARANCE) <br />REPRESENTS THAT THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND <br />ESTIMATING/BUDGETING PROCESS THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CEILING FINISH U.N.O. <br />COL <br />CONC <br />COLUMN <br />CONCRETE <br />LIMITATIONS HAVE BEEN MADE AND THAT THE CONTRACT DOCUMENTS HAVE BEEN EXAMINED IN <br />COMPLETE DETAIL AND THAT IT IS DETERMINED BEYOND DOUBT THAT THE DRAWINGS <br />OBTAINING FROM THE BUILDING OWNER DOCUMENTATION AS TO THE VAPOR EMISSIONS RATE <br />MOISTURE TEST) FOR N GRADE SLABCONDITIONS". THI INFORMATION SHOULD THEN BE <br />S 0 0 G S SSOU <br />( )REQUIREMENTS <br />6. <br />ALL DEBRIS REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH BUILDING MANAGEMENT <br />AND PROCEDURES. <br />6. <br />ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF FINISHED <br />CONS <br />CONSTRUCTION <br />SPECIFICATIONS AND EXISTING CONDITIONS ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR <br />IMMEDIATELY SHARED BETWEEN THE ARCHITECT, THE ARCHITECTS' SELECTED FLOORING <br />GYPSUM BOARD OR CEILING TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES. <br />CONT <br />CORR <br />CONTINUOUS <br />CORRIDOR <br />CONSTRUCTION OF THE WORK. WHERE MINOR ADJUSTMENTS TO THE WORK ARE NECESSARY <br />REPRESENTATIVE(S), AND FLOORING SUB -CONTRACTOR FOR REVIEW AND APPROVAL OF <br />7. <br />AS DIRECTED BY BUILDING MANAGEMENT, ALL DOORS, FRAMES, HARDWARE, MECHANICAL ITEMS, <br />CPT <br />CARPET <br />FOR THE PURPOSES OF FABRICATION AND INSTALLATION OF ITEMS OR RESOLUTIONS OF <br />APPLICABLE MATERIALS AND ANCILLARY INSTALLATION/FINISH PRODUCTS. IF NO MOISTURE TEST <br />PLUMBING FIXTURES, LIGHT FIXTURES (INCLUDING AND FLUORESCENTS), AND SPECIAL <br />7. <br />THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS LIGHT TYPES LIGHT FIXTURES AND <br />cr <br />CERAMIC TILE <br />CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF THE CONTRACT DOCUMENTS, THE <br />CAN BE FURNISHED OR IF FINDING ARE IN QUESTION THE GENERAL CONTRACTOR SHALL <br />E OF DEFECTS, PROTECTED, SAVED <br />AN FREE <br />EQUIPMENT SHOWN TO BE REMOVED, SHALL BE CLEANEAN AND FREE <br />ASSOCIATED ITEMS. <br />CTR <br />CENTER <br />CONTRACTOR SHALL MAKE SUCH ADJUSTMENTS AT NO ADDED EXPENSE TO THE OWNER. WHERE <br />PERFORM THE FOLLOWING TESTS: <br />AND REUSED AS DIRECTED HEREIN, OR RETURNED TO BUILDING STOCK. <br />B. <br />ALL SPECIFIC INFORMATION CONCERNING INSTALLATION FOR VARIOUS ABOVE -CEILING ELEMENTS ARE TO BE DESIGN <br />DEMO <br />DTL <br />DEMOLITION <br />DETAIL <br />SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR AESTHETIC DESIGN OF THE WORK, THEY <br />SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL. <br />A. PROVIDE (3) CALCIUM CHLORIDE MOISTURE TESTS FOR THE FIRST THOUSAND SQUARE FEET AND (1) <br />B. <br />IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL OUTLETS, SWITCHES, WIRES, THERMOSTATS, <br />BUILD, DOCUMENTATION BY OTHERS - PERMITTED SEPARATELY. <br />DF <br />DRINKING FOUNTAIN <br />TEST FOR EVERY ONE THOUSAND SQUARE FEET THEREAFTER AT ALL FLOORS WITHIN SCOPE OF <br />ETC., TO THEIR SOURCE. <br />9. <br />NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS WITH MAIN RUNNERS, DUCTS, STRUCTURES, <br />DIA <br />DIM <br />DIAMETER <br />DIMENSION <br />4. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER INCLUDING AREA FOR <br />WORK, MATERIALS STORAGE, AND ACCESS TO AND FROM THE WORK, SPECIAL CONDITIONS OR <br />WORK. THECALCIUM HL RIDE TEST HALL BE CONDUCTED INACCORDANCE WITH THE LATE T <br />0 CHLORIDE S S CO UCS <br />EDITION OF ASTM F 1669 "STANDARD TEST METHOD' FOR MEASURING VAPOR EMISSIONS RATE <br />9. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE CAUSED BY <br />HVAC AND/OR E CONDUIT PRIOR TO FRAMING FOR LIGHTS. ANY DISCREPANCIES BETWEEN ARCHITECTS CEILING <br />( ) <br />DN <br />DOWN <br />NOISY WORK, TIMING OF WORK AND INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES. <br />OF CONCRETE SUN -FLOOR USING ANHYDROUS CALCIUM CHLORIDE. PROVIDE A WRITTEN <br />HIM OR HIS SUBCONTRACTORS TO EXISTING CONSTRUCTION IN ELEVATOR LOBBY, PUBLIC <br />GRID LOCATION& ACTUAL FIELD CONDITIONS ARE TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING. <br />DR <br />DWG <br />DOOR <br />DRAWING <br />NOISY OR DISRUPTIVE WORK SHALL BE SCHEDULED AT LEAST ONE 1 WEEK IN ADVANCE OF THE <br />() <br />REPORT OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE. <br />CORRIDORS, RESTROOMS OR TENANT SPACES. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR <br />10. <br />SUBMIT GRILLE, THERMOSTAT, AND OTHER FIXTURE AND ELEMENT LAYOUTS TO THE ARCHITECT FOR REVIEW AT <br />DRW <br />DRAWER <br />TIME WORK IS TO COMMENCE. <br />B. PROVIDE APH PENCIL TEST AT ALL FLOORS WITHIN SCOPE OF WORK. PROVIDER WRITTEN REPORT <br />AS NOTED HEREIN. <br />LEAST 2 WEEKS PRIOR TO INSTALLATION. <br />E <br />EA <br />EAST <br />EACH <br />S. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF <br />OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE. <br />10. <br />NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX OR SIMILAR DEVICE, <br />11. <br />VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING, MECHANICAL DUCTS, STRUCTURAL ELEMENTS AND ALL <br />EL <br />ELEVATION <br />WORKMANSHIP IN GENERAL AND WITH SUCH STANDARDS AS ARE SPECIFIED. <br />INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED DURING DEMOLITION AND SUBSEQUENT <br />OTHER RELATED ITEMS. INSTALL NEW PLUMBING, MECHANICAL, FANS, DUCTS, CONDUITS, AND OTHER RELATED ITEMS <br />ELEC <br />ELEV <br />ELECTRICAL <br />ELEVATOR <br />6. CONTRACTOR SHALL ADHERE TO ALL BUILDING STANDARDS. ANY CHANGES TO SAME SHALL BE <br />IF REQUIRED BY THE CALCIUM CHLORIDE TEST, A WATERPROOF MEMBRANE SHALL BE APPLIED TO <br />ALL FLOORS WITHIN THE SCOPE OF WORK. THE WATERPROOF MEMBRANE(S) SHALL BE <br />CONSTRUCTION. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM <br />EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, <br />SO AS TO NOT CONFLICT WITH ANY/ALL FIELD CONDITIONS INCLUDING LUMINARIES. <br />EO <br />EQUAL <br />SUBMITTED TO ARCHITECT IN WRITING FOR APPROVAL. <br />APPROPRIATED FOR EACH FINISH FLOORING APPLICATION AS SPECIFIED BY THE SPECIFIC <br />AND PER THE PLANS. NO ACTIVE SMOKE DETECTOR SHALL BE COVERED OR OTHERWISE REMOVED <br />EQUIP <br />EQUIPMENT <br />FLOORING MANUFACTURER VIA THE ARCHITECT. A LICENSED INSTALLER SHALL BE UTILIZED FOR <br />OR USED FOR OTHER THAN ITS INTENDED PURPOSE. <br />12, <br />INSTALL NEW LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER OVER LOUVER, LENS, BAFFLE, ETC, TO <br />EST <br />EXIST <br />ESTIMATE <br />EXISTING <br />7. CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES OF SUCH SIZE AND NUMBER THAT THEY <br />INSTALLATION/APPLICATION OF EACH SPECIFIC MEMBRANE (AS APPLICABLE TO THE FINISH <br />AVOID FIXTURE SOILING OR DAMAGE. FIXTURES SHALL BE MAINTAINED CLEAN AND AS NEW. ALL LAMPS SHALL BE NEW <br />EXP <br />EXPANSION <br />REPRESENT REASONABLE DISTRIBUTION OF COLOR RANGES AND PATTERN PRIOR TO <br />FLOORING PRODUCT) AND A WRITTEN WARRANTY SHALL BE PROVIDED DOCUMENTING STRICT <br />11. <br />REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO <br />AT PROJECT COMPLETION- RELAMP EXISTING FIXTURES. <br />INSTALLATION FOR ARCHITECT'S APPROVAL. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND <br />CONFORMANCE TO THE SPECIFIED MANUFACTURES INSTALLATION REQUIREMENTS TO ENSURE <br />DATAICOMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES AND <br />13. <br />CONTRACTOR TO VERIFY CODE COMPLIANCE OF EXISTING ACOUSTICAL CEILING GRID SYSTEMS AND ASSOCIATED <br />FEC <br />FF <br />FIRE EXTINGUISHER CABINET <br />FACTORY FINISH <br />PRODUCT DATA FOR ARCHITECTS APPROVAL ON ALL SPECIAL ITEMS REQUIRING CUSTOM <br />FABRICATION. (SHALL INCLUDE RATED FIRE DOORS AND HARDWARE). <br />AND UPHOLD ALL PERFORMANCE AND LIFE CYCLE GUARANTEES. <br />TENANT. <br />SEISMIC BRACING RESTRAINTS. SYSTEMS FOUND NOT IN COMPLIANCE SHALL BE MODIFIED AND/OR NEW PROVIDED AS <br />FI <br />FIN <br />FULLHEIGHT <br />FINISHED) <br />33. CONCRETE SLAB ON GRADE REPAIR- MINOR SCOPE (100 SQUARE FEET OR LESS) <br />12. <br />REMOVE ALL EXISTING MATERIALS WHICH WOULD CAUSE RISES DEPRESSIONS IN NEW FLOORING <br />REQUIRED BY CURRENT BUILDING CODES (INCLUDING, BUT NOT LIMITED TO; CURRENT IBC WALL MOLDING (TANGLE) <br />FUR <br />FLOOR <br />B. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT <br />,R <br />SURFACE, SUCH AS FASTENERS, OUTLET CORES, COVER PLATES, RESILIENT FLOOR COVERINGS, <br />AND SEISMIC SEPARATION JOINTS). <br />FLUOR <br />FLUORESCENT <br />OF ANY DISCREPANCIES. CONTRACTOR IS NOT TO SCALE OFF DRAWINGS. <br />WHERE CONCRETE SLAB ON GRADE INFILL AND TRENCHING MUST OCCUR; CONDUCT THE <br />CARPET, CARPET PAD, FLASH PATCH, CONCRETE FILL, PLYWOOD, ETC. <br />FDIC <br />FURNISH BY OWNER, <br />APPROPRIATE UNDER SLAB INVESTIGATION (VIA SONO-GRAPH AND/OR X-RAY) TO LOCATE <br />14. <br />CONTRACTOR TO VERIFY CODE COMPLIANCE OF EXISTING LIGHTING FIXTURES AND ASSOCIATED SEISMIC BRACING <br />FOS <br />INSTALL STUD(S) <br />FACE OF <br />9, CONTRACTOR SHALL PROVIDE 18-GAUGE SHEET METAL BACKING IN PARTITIONS FOR ALL <br />EXISTING UTILITIES OR OTHER OBSTRUCTIONS THAT SHOULD NOT BE DAMAGED. SAW CUT SLAB <br />13. <br />DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS. THE INTENT IS TO <br />RESTRAINTS. FIXTURES ESFOUNDNOT BE MODIFIED AND/OR NEW PROVIDED AS REQUIRED BY <br />FOC <br />CONCRETE <br />FACE OF CONCRETE <br />WALL -MOUNTED FIXTURES AND DEVICES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />AT SUBJECT AREA(S) AND PULL BACK THE EXISTING VAPOR BARRIER (IF PRESENT) AND PROTECT <br />INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE THE WORK IN <br />COMPLIANCE ODES.SHALL <br />CURRENT BUILDING AND/OR ENERGY COMPLIANCE CODES. <br />FOF <br />FACE OF FINISH <br />FOR FUTURE RE -INSTALLATION. EXECUTE THE NECESSARY UNDER SLAB WORK (INCLUDING <br />ACCORDANCE WITH THE CONTRACT DRAWINGS. <br />FT <br />ED TIFEET <br />10. ALL FLOORS SHOULD BE LEVEL AND NOT VARY MORE THAN 1/4" IN 10'-0'. THE CONTRACTOR SHALL <br />EXCAVATION), BACKFILL AND RE -COMPACT THE SUBJECT AREA WITH THE PREVIOUSLY HELD <br />15. <br />ALL EXITING LIGHTS AND EGRESS LIGHTING LOCATIONS SHALL BE DETERMINED BY BUILDING AND FIRE INSPECTOR'S <br />FUR <br />FURRED/FURRING <br />NOTIFY ARCHITECT OF ANY CONDITIONS THAT DO NOT MEET THIS STANDARD. <br />MATERIALS (IF THE EXCAVATED MATERIALS ARE NOT SUITABLE FOR RE -INSTALLATION, DISCARD <br />14. <br />RATED WALLS SHALL NOT BE PENETRATED UNLESS THE RATING IS MAINTAINED. <br />FIELD PLACEMENT DETERMINATION. <br />AND PROVIDE NEW FREE DRAINING GRANULAR MATERIAL). RE -COMPACT FILL SOIL TO AT LEAST <br />GA <br />GAUGE <br />11. ALL MATERIALS INDICATED TO MATCH EXISTING SHALL DO SO WITH RESPECT TO SIZE, SHAPE, <br />95% OF THE MAXIMUM DRY DENSITY(MDD) OBTAINED IN GENERAL ACCORDANCE WITH THE ASTM D <br />15. <br />DISPOSAL:ALL DEBRIS REMOVED FROM THE SITE SHALL BE RECYCLED AS MUCH AS PRACTICAL AND <br />16, <br />ALL SMOKE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH IMC/IBC OR SUPERCEDING CODE. ALL FIRE <br />Gc <br />GENERALCONTRACTOR <br />COLOR, TEXTURE, PATTERN, QUALITY AND METHOD OF INSTALLATION INSOFAR AS PRACTICABLE <br />1557 TEST PROCEDURE. RE -INSTALL THE EXISTING VAPOR BARRIER AND BIND SEAMS WITH <br />ALLOWED BY LAW. <br />DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH IMC/IBC OR SUPERCEDING CODE. <br />GL <br />GLASS/GLAZING <br />AND SHALL BE APPROVED BY THE ARCHITECT BEFORE USE. <br />MINIMUM 3" WIDE PRESSURE SENSITIVE TAPE TO ENSURE AN AIRIMOISTURE RESISTANT <br />GINS <br />GYPSUM WALL BOARD <br />BOND. ATTACH NEW INFILL TO EXISTING CONCRETE SLAB WITH iB INCH LONG #4 REBAR 24 <br />17. <br />EGRESS LIGHTING SHALL BE DESIGNED BY A LICENSED ELECTRICAL ENGINEER BASED ON FINAL FLOOR PLAN(S)AND <br />HC <br />HOLLOW CORE <br />12. ALL FIREPROOFING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED MATCH <br />INCHES CENTER EMBEDDED B INCHES INTO THE EXISTING CONCRETE SLAB WITH I <br />THE MOST CURRENT (IN FORCE) ISSUE OF THE IBC, IEC AND LOCAL CODES/ORDINANCES. THE ENGINEER MAY USE THE <br />HCPD <br />HANDICAPPED <br />TI <br />ORIGINAL FIRE PROTECTION LEVELS. (OBTAIN REQUIRED APPROVALS AND TESTING). <br />ADHESIVE R SIMPSON SET <br />E INSTALLED PER ADHESIVE <br />REINFORCEMENT SHALL AD ESIVE <br />ARCHITECTS EGRESS MAPS (COMMON PATH OF TRAVEL/E%IT TRAVEL DISTANCE) AS STARTING POINT FOR A BASIS OF <br />HDR <br />HEADER <br />W FABRIC <br />MANUFACTURER'S RECOMMENDATIONS. PROVIDE W2 %W2 X 6 X 8 WELDED WIRE FABRIC WITHIN <br />DESIGN. HOWEVER, IT SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER 70 COMPLETE A SCOPE OF WORK <br />HIM <br />HARDWARE <br />13. THE FLOORS MAY BE OCCUPIED DURING CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL <br />.. <br />SUBJECT AREA(S), INFILL SLAB TO MATCH THICKNESS OF ADJACENT SURFACE(S) (BUT NOT BE <br />THAT ADDRESSES ALL EGRESS LIGHTING I.E.; ROOMS, SPECIALIZED SPACES, PATHWAYS, ETC. PER THE <br />HIM <br />HORIZ <br />HOLLOW METAL <br />HORIZONTAL <br />PERSONNEL, PASSERSBY OR VISITORS TO THE SITE FROM HARM AND INJURY. BARRIERS SHALL <br />LESS THAN FOUR INCHES THICK) AND #4 DOWELS SHALL BE CENTERED IN SLAB. THE CONCRETE <br />AFOREMENTIONED CODES. FINAL EGRESS LIGHTING QUANTITIES AND LOCATIONS SHALL BE DETERMINED BY BUILDING <br />HR <br />HOUR <br />BE INSTALLED AS REQUIRED TO PROTECT EQUIPMENT INSTALLED DURING CONSTRUCTION. <br />SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3000 PSI WITH A MAXIMUM WATER <br />AND FIRE INSPECTOR'S FIELD PLACEMENT DETERMINATION. <br />HT <br />HEIGHT <br />CAREFULLY MAINTAIN AND PROTECT MONUMENTS, BENCH MARKS AND THEIR REFERENCE POINT <br />CEMENT RATION OF 0.58 AND IS TO BE PLACED LEVEL WITH ADJACENT SURFACES. LET CURE AND <br />HVAC <br />HE ATINGVENTILATING <br />FROM BEING DESTROYED OR DISTURBED; REPLACE AS REQUIRED. <br />PROVIDE MOISTURE TESTING AS SPECIFIED ABOVE. <br />ELECTRICAL <br />NOTES: <br />DOOR NOTES: <br />AIR CONDITIONING <br />INSUL <br />INSULATION <br />14. EXISTING WORK DAMAGED AS A RESULT OF WORK DONE UNDER THIS CONTRACT SHALL BE <br />IF SCOPE OF WORK INCLUDES STRUCTURAL ELEVATED SLABS CONSULT A STRUCTURAL <br />1. <br />ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF KEY OR ANY SPECIAL KNOWLEDGE OR <br />REPAIRED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT FINISHES SUBJECT TO <br />ENGINEER. REFER TO STRUCTURAL PLANS IF APPLICABLE FOR ADDITIONAL SPECIFICATIONS AND <br />JAN <br />JANITOR <br />ARCHITECTS APPROVAL AND AT NO ADDITIONAL COST TO OWNER. ALL REPLACEMENT <br />REQUIREMENTS. <br />Q <br />1. <br />FURNISH AND INSTALL ALL FIXTURES, ASSOCIATED TRIM AND FIXTURE LAMPS AS REQUIRED. ONLY <br />EFFORT. <br />JT <br />JOINT <br />MATERIALS REQUIRED TO MATCH EXISTING MATERIALS SHALL SO WITH RESPECT TO TYPE, <br />NEW OUTLETS /FIXTURES ARE SHOWN. ALL EXISTING OUTLETS UNAFFECTED BY CONSTRUCTION ARE <br />KIT <br />KITCHEN <br />AL <br />PATTERN, TEXTURE, SIZE, SHAPE, COLOR AND METHOD OF INSTALLATION INSOFAR AS <br />34. CLEAN, REPAIR ANY EXISTING PERIMETER BLINDS AS REQUIRED TO BE IN A FULLY FUNCTIONING 8 <br />TO REMAIN AND ARE TO BE INTEGRATED INTO THE CURRENT SCHEME WHERE POSSIBLE. <br />2. <br />ALL GLAZING SHALL CONFORM TO SAFETY GLAZING REQUIREMENTS OF IBC SECTION 2406. <br />PRACTICABLE, AND SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR TO <br />OPERATIONAL MANNER. <br />LAM <br />LAMINATE(D) <br />INSTALLATION. <br />2. <br />SURVEY FIELD CONDITIONS AND VERIFY THAT WORK IS FEASIBLE AS SHOWN. VERIFY LOCATION OF <br />3. <br />MAGNETIC HOLD OPEN DEVICES SHALL BE TIED TO BUILDING FIRE ALARM SYSTEM. <br />LAv <br />LAVATORY <br />35. COORDINATE WITH SUB -CONTRACTORS THE LOCATIONS OF ELECTRICAL AND VOICEIDATA OUTLETS, <br />ALL OUTLETS IN RELATION TO STRUCTURAL AND OTHER ELEMENTS AS REQUIRED. NOTIFY <br />LH <br />LEFTHAND <br />15. ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT AND SERVICES DISRUPTED OR REMOVED <br />PLUMBING AND OTHER DEVICES WITH LAYOUT AND DESIGN OF CUSTOM CASEWORK. <br />ARCHITECT IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK. <br />q <br />ALL RATED DOORS TO BE LABELED PER IBC TABLE 715.3. <br />MAX <br />MAXIMUM <br />DURING CONSTRUCTION SHALL BE RESTORED AND REPLACED UNLESS NOTED OTHERWISE. <br />MECH <br />MECHANICAL <br />FIRE/LIFE SAFETY SYSTEMS TO BE MAINTAINED DURING CONSTRUCTION. <br />36. CASEWORK SHALL CONFORM TO A.W.I. CURRENT STANDARDS. <br />3. <br />ARCHITECTURAL DRAWINGS DETERMINE LOCATION AND TYPE (ARCHITECT TO VERIFY WI ENGINEER) <br />5. <br />THRESHOLDS AT DOORWAYS SHALL BE MAXIMUM IN HEIGHT. PER ICC/ANSI A117.1-2003 SECTION 404.2.4. <br />MIL <br />METAL <br />OF ALL OUTLETS AND TAKE PRECEDENCE OVER ALL OTHERS, U.N.O.. ELECTRICAL ENGINEER'S <br />i" <br />MEz <br />MFR <br />MEZZANINE <br />MANUFACTURE(R) <br />16. INSTALLATION OF MECHANICAL, ELECTRICAL AND STRUCTURAL SYSTEMS WILL REQUIRE OPENING <br />37. EGRESS LIGHTING SHALL BE DESIGNED BY LICENSED ELECTRICAL ENGINEER BASED ON FINAL <br />POWER PLAN SHALL GOVERN THE WIRING LAYOUT AND INSTALLATION IN COMPLIANCE WITH ALL <br />6. <br />ICC/APARTNSI A117.1-2003 SECTION 404.2.6. DOOR HARDWARE, HANDLES, PULLS, LATCHES, LOCKS 8 OTHER OPERABLE <br />MIN <br />MINIMUM <br />OF SOME EXISTING WALLS, CEILINGS OR FLOOR CAVITIES. THE CONTRACTOR SHALL BE <br />FLOOR PLAN(S) AND THE MOST CURRENT (IN FORCE) ISSUE OF THE IBC, IEC AND LOCAL <br />LAWS APPLICABLE AND ENFORCED BY GOVERNING AUTHORITIES. <br />PARTS ON ACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EACH TO GRASP WITH ONE HAND & DOES NOT REQUIRE <br />MISC <br />MISCELLANEOUS <br />RESPONSIBLE FOR THE REPAIR OF THESE OPENINGS TO MATCH EXISTING, EXCEPT WHERE NOTED <br />CODESIORDINANCES. THE ENGINEER MAY USE THE ARCHITECTS EGRESS MAPS (COMMON PATH <br />TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST TO OPERATE. OPERABLE PARTS OF SUCH HARDWARE <br />MTD <br />MOUNTED <br />OTHERWISE. FILL ALL HOLES AND VOIDS IN FLOORS, WALLS AND CEILINGS WHICH RESULT FROM <br />OF TRAVEL/EXIT TRAVEL DISTANCE) AS STARTING POINT FOR A BASIS OF DESIGN. HOWEVER, IT <br />4. <br />OUTLETS SHOWN BACK TO BACK ON PARTITION WALLS SHALL BE OFFSET I'-0", MAXIMUM, OR <br />SHALL BE 34"MIN.&48'MAX. ABOVE THE FINISH FLOOR. WHERE SLIDING DOORS ARE IN THE FULLY OPEN POSITION. <br />MUL <br />MULLION <br />INSTALLATION OF WORK, AND REMOVAL OF EXISTING MATERIALS AND EQUIPMENT REQUIRED BY <br />SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO COMPLETE A SCOPE OF WORK <br />MOUNTED AT DIFFERENT HEIGHTS IF INDICATED. <br />OPERATING HARDWARE SHALL BE EXPOSED & USABLE FROM BOTH SIDES. <br />N <br />NORTH <br />THIS CONTRACT. PATCHED AREAS SHALL MATCH THE MATERIALS, FINISHES, AND LEVELS <br />THAT ADDRESSES ALL EGRESS LIGHTING I.E.; ROOMS, SPECIALIZED SPACES, PATHWAYS, PER <br />NIC <br />NOT IN CONTRACT <br />ADJACENT, OR SHALL BE PUT IN THE PROPER CONDITION TO RECEIVE THE FINISH INDICATED. <br />THE AFOREMENTIONED CODES. FINAL EGRESS LIGHTING QUANTITIES AND LOCATIONS SHALL BE <br />5. <br />, , ,U.N.O.ETC. <br />FURNITUREIF SHOWNIS FOR REFERENCE ONLY AND IS NOT IN CONTRACTU <br />7. <br />ICC/ANSI A117.1- 2003 SECTION 404.2.8 DOOR OPENING FORCE. FIRE DOORS SHALL HAVE THE MINIMUM OPENING <br />NTS <br />NOT TO SCALE <br />DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT DETERMINATION. <br />6. <br />COORDINATE ALL WORK RELATED TO EQUIPMENT WITH MANUFACTURER'S RECOMMENDATIONS, <br />FORCE ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVE AUTHORITY. THE MAXIMUM FORCE FOR PUSHING OPEN <br />17. OPENINGS REQUIRED FOR NEW WORK THAT PENETRATES EXISTING STRUCTURE SHALL BE <br />SPECIFICATIONS AND INSTRUCTIONS. <br />FOR PULLING OPEN DOORS OTHER THEN FIRE DOORS SHALL BE AS FOLLOWS: 1. INTERIOR HINGED DOOR: 5.0 <br />OC <br />ON CENTER <br />COORDINATED WITH OWNER PRIOR TO COMMENCING THE WORK. ANY OPENING OVER 2" IN <br />POUNDS (22.2 N) 2. SLIDING OR FOLDING DOOR: 5.0 POUNDS (22.2 N). THESE FORCES DO NOT APPLY TO THE FORCE <br />OD <br />OUTSIDE DIAMETER <br />DIAMETER SHALL BE REVIEWED AND APPROVED BY OWNER. THROUGH CONCRETE SLABS OR <br />7. <br />ALL EXISTING AND NEW FLOOR SLAB PENETRATIONS FOR CONDUIT OR PLUMBING LINES SHALL BE <br />REQUIRED TO RETRACT LATCH BOLTS OR DISENGAGE OTHER DEVICES THAT HOLD THE DOOR IN A CLOSED POSITION. <br />SYMBOL LEGEND: <br />OH <br />OPNG <br />OPPOSITE HAND <br />OPENING <br />WALLS, OR MASONRY WALLS, ALL ROUND HOLES SHALL BE CORE DRILLED WITH A DIAMOND DRILL <br />AND ALL RECTANGULAR OPENINGS SHALL BE CUT WITH A DIAMOND SAW. IN NO CASE SHALL ANY <br />FULLY PACKED & SEALED IN ACCORDANCE WITH THE APPLICABLE BUILDING AND FIRE CODES. <br />8. <br />ACTIVATION OF THE BUILDING AUTOMATIC SPRINKLER OR FIRE DETECTION SYSTEM, IF PROVIDED, SHALL <br />F2306 1 ROOM NUMBER REFERENCE 5 <br />P-LAM PLASTIC LAMINATE <br />STRUCTURAL MEMBER BE CUT. USE CARBIDE -TIPPED DRILLS FOR GYPSUM WALLBOARD <br />8. <br />COORDINATE NEW ELECTRICAL WITH EXISTING, WHERE OCCURS. <br />AUTOMATICALLY UNLOCK ALL ELECTRONICALLY SECURED DOORS WITH IN THE EGRESS PATHWAY. THE DOORS SHALL <br />PNL <br />PANEL-tB.a <br />PARTITIONS. KEEP OVERCUTTING TO A MINIMUM. MAINTAIN CONTINUITY AND INTEGRITY OF FIRE <br />DETAIL REFERENCE BUBBLE <br />REMAIN UNLOCKED UNTIL THE FIRE ALARM HAS BEEN RESET. <br />PR <br />PTN <br />PAIR <br />PARTITION <br />SEPARATION AT ALL TIMES. GROUT AROUND CONDUITS PASSING THROUGH CONCRETE WALLS <br />AND FLOORS AND MASONRY WALLS. MAKE PATCHES WITH NEAT, TRIMMED EDGES; MATCH <br />zaa DOOR NUMBER REFERENCE. <br />9. <br />UPON COMPLETION OF ELECTRICAL ROUGH -IN, NOTIFY THE ARCHITECT. ARCHITECT SHALL SITE <br />9. <br />ENTRANCE DOORS IN THE BUILDINGS WITH OCCUPANCY IN GROUP A, B, E OR M SHALL NOT BE SECURED FROM THE <br />RA D <br />RADIUS <br />ADJACENT EXISTING WORK. <br />�� JOB NORTH <br />Q <br />VERIFYALL OUTLET LOCATIONS PRIOR TO COMMENCEMENT OF CORING OR GWB INSTALLATION. <br />EGRESS SIDE DURING PERIODS THAT THE BUILDING IS OPEN TO THE GENERAL PUBLIC. <br />RB <br />FIT <br />RESILIENTBASE <br />RESILIENTTILE <br />18. CONTRACTOR SHALL PROVIDE FLOOR LEVELING AS MAY BE REQUIRED AT SLIDING DOORS, <br />REVISION REFERENCE " <br />10. <br />FURNISH AND INSTALL ONLY UNDERWRITERS LABORATORIES, INC. (UL) LABELED DEVICES <br />THROUGHOUT. <br />FINISH <br />NOTES. <br />REF <br />REFERENCE <br />RELITES WITHOUT BASE, CABINET WORK, AND OTHER LOCATIONS REQUIRING LEVEL SUBSTRATE. <br />© REFERENCE KEY <br />1 <br />ALL AREAS TO RECEIVE CARPET AND BASE AS SCHEDULED U.N.O. <br />REFR REFRIGERATOR <br />REINF REINFORCING <br />FEATHER CHANGES IN ELEVATION OVER SUFFICIENT AREA TO LIMITTRANSITION SLOPE TO 1/8"-10.3 <br />PER FOOT. <br />INTERIOR ELEVATION SYMBOL (REFER TO SHEET/KEY NOTES) <br />11. INSTALL WALL MOUNTED OUTLETS 18 INCHES ABOVE FINISHED FLOOR, U.N.O. HEIGHTS SHALL BE <br />RE0 <br />REQUIRED <br />DETERMINED FROM FINISHED FLOOR TO THE CENTERLINE OF COVERPLATE, INSTALLED VERTICALLY, <br />REV <br />REVISION <br />HAND <br />19 S BY LISTING <br />FIED IN THE TEFERENCED <br />MATERIALS, ARTICLES, DEVICES AND PRODUCTS ARE IING <br />GROUNDING POLE AT BOTTOM, U.N.O. <br />2. <br />ALL AREAS TO RECEIVE VB-1 U.N.O. <br />RM <br />RO <br />RoOM <br />ROUGH OPENING <br />ACCEPTABLE MANUFACTURERS OR PRODUCTS, BY REQUIR. COMPLIANCE WITH <br />STANDARDS, OR BY PERFORMANCE SPECIFICATIONS. FOR ITEMS SPECIFIED BY NAME, SELECT <br />DIMENSION NOTES. <br />12. <br />MAINTAIN A4-INCH HORIZONTAL CLEARANCE IN ALL DIRECTIONS, MIN. FROM EDGE OF COVERPLATE, <br />3. <br />ALL WALLS 8 PARTITIONS TO RECEIVE P-1 U.N.O. <br />1. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS GOVERN. ALL PARTITION LOCATIONS SHALL BE AS <br />ANY PRODUCT NAMED. FOR THOSE SPECIFIED BY REFERENCE STANDARDS OR BY PERFORMANCE <br />FOR WALL MOUNTED OUTLETS, OR FROM EDGE OF MONUMENT FOR FLOOR MOUNTED OUTLETS, <br />S <br />Sc <br />SOUTH <br />SOLID CORE <br />SPECIFICATIONS SELECT ANY PRODUCT MEETING OR EXCEEDING SPECIFIED CRITERIA. FOR <br />SHOWN ON PARTITION PLAN. IN CASE OF CONFLICT NOTIFY ARCHITECT. PARTITION PLAN BY <br />WHEN ADJACENT TO A WALL, COLUMN, OR SIMILAR ELEMENTS, U.N.O. <br />4. <br />PREP ALL EXISTING FLOOR SURFACES TO RECEIVE NEW FINISHES AS SCHEDULED. <br />SEAL <br />SEALANT <br />APPROVAL OF AN ITEM NOT SPECIFIED, SUBMIT REQUIRED SUBMITTALS, PROVIDING COMPLETE <br />ARCHITECT TAKES PRECEDENCE OVER ALL OTHER PLANS. <br />SECT <br />SECTION <br />BACK-UP INFORMATION FOR PURPOSES OF EVALUATION. WHERE BUILDING STANDARD ITEMS ARE <br />13. <br />INDICATED DIMENSIONS ARE TO THE CENTER OF THE COVERPLATE OR MONUMENT; CLUSTERS OF <br />5. <br />PROVIDE PAINT APPLICATION APPROPRIATE TO THE SUBSTRATE TO WHICH IT IS TO BE APPLIED. <br />SHi <br />SHEET <br />CALLED FOR, NO SUBSTITUTE WILL BE ACCEPTED. <br />2. ALL PARTITIONS ARE DIMENSIONED FROM FINISH FACE OF GYPSUM BOARD TO FINISH FACE OF GYPSUM <br />OUTLETS ARE DIMENSIONED TO THE CENTER OF THE CLUSTER, U.N.O.; GANG COVERPLATES SHALL <br />S <br />SPEC <br />SIMILAR <br />SPECIFICATION <br />BOARD UNLESS OTHERWISE NOTED. ALL DIMENSIONS MARKED "CLEAR' OR "CLR" SHALL BE <br />BE ONE-PIECE TYPE, U.N.O. <br />6. <br />ALL EXPOSED GYP. SO. SURFACES, BOTH EXISTING AND NEW, ARE TO RECEIVE NEW PAINT FINISH. PREP ALL SURFACES <br />SO <br />SQUARE <br />20. CONTRACTOR SHALL PROVIDE FOR ALL WORK REQUIRED TO MAINTAIN COMPLIANCE WITH LOCAL <br />MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL WALL FINISHES, U.N.O. <br />AS REQUIRED FOR NEW PAINT FINISH. PROVIDE ONE PRIME COAT PLUS TWO FINISH COATS <br />SS <br />STAINLESS STEEL <br />FIRE CODE. PROVIDE FOR ALL REQUIRED SHOP DRAWINGS AND APPROVALS. CONTRACTOR IS <br />14. <br />ELECTRICAL SWITCH AND OUTLET COVER PLATES, SURFACE HARDWARE, ETC. SHALL BE INSTALLED <br />STL <br />STEEL <br />RESPONSIBLE FOR PROVIDING FIRE ALARM SYSTEM AUDIBILITY. <br />3. DIMENSIONS NOTED"CLEAR"OR"CLR" MUST BE ACCURATELY MAINTAINED, AND SHALL NOT VARY MOREAFTER <br />PAINTING AND/OR APPLICATION OF WALLCOVERINGS& CARPET SPECIFIED. <br />7_ <br />CHANGES IN FLOOR MATERIALS THAT OCCUR AT FRAMED DOOR OPENINGS SHALL OCCUR AT THE CENTERLINE OF THE <br />STIR <br />STRUC <br />STORAGE <br />STRUCTURAL <br />THAN t 1/8" WITHOUT WRITTEN INSTRUCTION FROM ARCHITECT. <br />15. <br />POWERIDATARELEPHONE REQUIREMENTS FOR OPEN OFFICE WORKSTATIONS TO BE PROVIDED WITH <br />DOOR IN THE CLOSED POSITION. <br />SUBP <br />SUSPENDED <br />21. MECHANICAL AND ELECTRICAL FIXTURES, MA OUTLETS, ETC., WHEN SHOWN LE THE ARCHITECTURAL <br />DRAWINGS, ARE FOR LOCATION INFORMATION ONLY. MECHANICAL AND ELECTRICAL TO BE <br />4. DIMENSIONS MARKED t MEAN ATOLERANCE NOT GREATER NOR SMALLER THAN 21NCHES FROM <br />FURNITURE INSTALLATION DRAWINGS -BY OTHERS. <br />8. <br />ANY DECORATIONS USED SHALL BENON-COMBUSTIBLEOR FLAME- RETARDANT TREATED IN AN APPROVED OF MANNER <br />TEL <br />TELEPHONE <br />DESIGNED BY OTHERS. ALL CIRCUITING COORDINATION TO BE BY OTHERS. <br />INDICATED DIMENSION, U.N.O. VERIFY FIELD DIMENSIONS EXCEEDING TOLERANCE WITH THE <br />(CURTAINS, DRAPES, SHADES, HANGINGS, ETC.) <br />TEMP <br />TEMPERED <br />ARCHITECT. SECURE ARCHITECTS APPROVAL. <br />16. <br />THE FURNITURE ELECTRICAL IS AN 8-WIRE, 4-CIRCUIT (2-GROUNDS 82-NEUTRALS) SYSTEM. ALL <br />TFTI <br />TENANT FURNISHED <br />&TENANT INSTALLED <br />22. CONTRACTOR IS TO PROVIDE DRAWINGS FOR ARCHITECT'S APPROVAL SHOWING LOCATIONS OF <br />ELECTRICAL FEEDS TO ANY OF THE PRODUCT MUST BE IN AN 8-WIRE CONFIGURATION. <br />9. <br />ALL INTERIOR PARTITIONS, CEILING FINISHES AND TRIM OF PUBLIC AREAS TO COMPLY WITH CLASS 1 MATERIAL <br />THK <br />THICKNESS) <br />ALL HVAC THERMOSTATS, GRILLES AND DIFFUSERS, FIRE AND SMOKE DETECTION DEVICES <br />5. NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES OR CONFLICTS IN THE LOCATION(S) OF NEW <br />"H" <br />CLASSIFICATION; FLAME SPREAD RATING 0 TO 25, SMOKE DEVELOPED 200. ALL INTERIOR WALL AND CEILING FINISHES <br />THRESH <br />THRESHOLD <br />ALL <br />SPRINKLERS, SMOKE DETECTORS, FIRE EXTINGUISHERS AND HOSE CABINETS, <br />CONSTRUCTION. UPON COMPLETION OF PARTITION LAYOUT, NOTIFY ARCHITECT. VERIFICATION OF <br />17. <br />INDICATES THAT AN OUTLET SHALL BE MOUNTED HORIZONTALLY. <br />AND TRIM OF NON-PUBLIC AREAS TO COMPLY WITH CLASS 2 MATERIAL CLASSIFICATION; FLAME SPREAD RATING 26 TO 75 <br />TV <br />TELEVISION <br />PLUMBING AND PLUMBING EQUIPMENT. <br />THE LAYOUT TO BE PROVIDED BY THE ARCHITECT PRIOR TO PARTITION INSTALLATION. <br />SMOKE DEVELOPED 450. <br />TYR <br />TYPICAL <br />18. <br />VERIFY NEW FLUSH FLOOR OUTLET LOCATIONS WITH FURNITURE LAYOUT PRIOR TO INSTALLATION. <br />UNFIN <br />UNFINISHED <br />23. ANY CHANGE IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR <br />6. REFER TO REFLECTED CEILING PLANS FOR SOFFITS, AND CEILING HEIGHTS. <br />19. <br />ALL SWITCHES AND DIMMERS SHALL BE LOCATED 46"ABOVE FINISHED FLOOR TO CENTER OF SWITCH <br />10. <br />FLOOR COVERINGS OF PUBLIC AREAS TO MEET CLASS A INTERIOR FLOOR FINISH REQUIREMENTS; CRITICAL RADIANT <br />UNO <br />UNLESS NOTED OTHERWISE <br />STRUCTURAL COMPONENTS MUST BE APPROVED BY THE ARCHITECT. <br />U.O.N.. MULTIPLE SWTCHES AT ONE LOCATION SHALL BE GANGED TOGETHER AND FINISHED WITH <br />I <br />FLUX OF OAS WATTS PER SQUARE CENTIMETER OR HIGHER, FLOOR COVERINGS OF NON-PUBLIC AREAS TO MEET CLASS <br />VCT <br />VINYL COMPOSITION TILE <br />7. DIMENSIONS LOCATING DOORS ARE TO THE INSIDE EDGE OF JAMB U.N.O. <br />ONE COVER PLATE U.N.O. <br />B INTERIOR FLOOR FINISH REQUIREMENTS; CRITICAL RADIANT FLUX BETWEEN 0.22 WATTS PER SQUARE CENTIMETER <br />VEN <br />VERT <br />VENEER <br />VERTICAL <br />24. ALL PERMITS INCLUDING FIRE, MECHANICAL, AND ELECTRICAL TO BE FILED SEPARATELY. <br />8. "ALIGN" MEANS TO ACCURATELY LOCATE FINISHED FACES IN THE SAME PLANE. <br />AND OA4 WATTS PER SQUARE CENTIMETER. <br />VESTI <br />VESTIBULE <br />25. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED, SPACKLED AND SANDED SMOOTH WITH NO <br />1 t <br />CARPET INSTALLATION TO MEET THE GUIDELINES OF THE CARPET AND RUG INSTITUTE-CRI CARPET INSTALLATION <br />VEY <br />VERIFY <br />VISIBLE JOINTS. PATCH AND REPAIR SURFACES TO MATCH ADJACENT OR ADJOINING SURFACES <br />9. ALL DOORS SHALL HAVE 1%6' CLR. ON STRIKE/PULL SIDE AND 1%0' CLR. <br />OUTLET FINISHES: <br />STANDARD -CURRENT EDITION. <br />VIVO <br />VINYL WALL COVERING <br />WHERE REQUIRED. ALL SURFACES SHALL BE ALIGNED. <br />ON PUSH SIDE OF DOOR. VERIFY AND ADVISE ARCHITECT OF EXCEPTIONS PRIOR <br />ISOLATED GROUND- GRAY <br />IN <br />WESTMgDE <br />TO CLOSING OUT PARTITIONS. <br />UPS -ORANGE <br />12. <br />PROVIDE FINISHED SCRIBE STRIPS AND FINISHED MILLWORK EDGES TO CREATE A FINISHED REVEAL CONDITION WHERE <br />WI <br />WITH <br />26. MODIFY EXISTING SUBSTRATE AS REQUIRED TO RECEIVE NEW FLOORING MATERIALS, THUS <br />ALL OTHERS- MATCH BUILDING STANDARD <br />MILLWORK COUNTERS, CABINETS, ETC. "ABUT ADJACENT PARTITION CONSTRUCTION. ALL EXPOSED REVEAL SURFACES <br />WD <br />WOOD <br />PREVENTING NOTICEABLE LUMPS OR DEPRESSIONS. <br />SWITCH FINISH: MATCH BUILDING STANDARD <br />AND EDGES TO HAVE SAME PLASTIC LAMINATE FINISH AS THE CASEWORK ITEM THEY "ABUT". <br />W/o <br />WITHOUT <br />COVERPLATE FINISH: MATCH BUILDING STANDARD <br />WT <br />WEIGHT <br />27. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE. <br />(INCLUDES ALL COVERPLATES-POWERNOICFJDATA) <br />13. <br />CONTRACTOR TO CLEAN AND REPAIR ALL EXISTING EXTERIOR GLAZING AND INTERIOR RELITEMlNI-BLINDS WITHIN THE <br />WORK AREA. <br />U <br />W <br />2 <br />O <br />U <br />N <br />N <br />Ln <br />LLI <br />Z <br />GJ O <br />O <br />OD <br />GJ P <br />VL <br />N N <br />P m <br />HERITAGE BANK <br />FRONTIER BANK BLD <br />2831 COLBY AVE <br />EVERETT, WA 98201 <br />DESIGN JPC <br />DRAWN cs <br />CHECKED AC <br />NO. 22-0419 <br />ezaa REGISTERED <br />AL`R^�C�yH)IITECCT <br />CHARLOTTE PR50N <br />STATE OF WAATfESHINGTON <br />7/13/2022 PERMIT REVIEW SET <br />7/1812022 PERMIT SET <br />JURISDICTION STAMP <br />General Notes & <br />Symbols <br />I-0.1 <br />2017. JPC ANN- PLLC <br />