Laserfiche WebLink
0 <br />\ <br />RIVERFRONT SITE ELECTRICAL & 15KV DRAWING LIST <br />SHEET <br />DWG <br />204 <br />EFS-0 <br />Cover&Index <br />205 <br />EFS-1 <br />SymboIsAbbriv.&Specifications <br />206 <br />EFS-2 <br />Site Plan - North <br />207 <br />EFS-3 <br />Site Plan - South <br />208 <br />EFS-4 <br />Switch Gear- North <br />209 <br />EFS-5 <br />Oneline Diagram (12.47KV) - North <br />210 <br />EFS-6 <br />Switch Gear - South <br />211 <br />EFS-7 <br />Oneline Diagram (12.47KV) - South <br />212 <br />EFS-8 <br />Vaults -TypeV -Power <br />213 <br />EFS-9 <br />Vaults - TypeFC(Comm) <br />214 <br />EFS-10 <br />Vaults -Type L(LV) <br />215 <br />EFS-11 <br />Vaults -TypeS (EV-LV) <br />216 <br />EFS-12 <br />EV Charger installation Details <br />217 <br />EFS-13 <br />Vaults -Cluster Layout <br />218 <br />EFS-14 <br />Trench Detail <br />219 <br />EFS-15 <br />Grounding Details <br />220 <br />EFS-16 <br />Parking Lot Lights - Raceway Details <br />221 <br />EFS-17 <br />LFG- Specifications <br />222 <br />EFS-18 <br />LFG-Oneline Pumps21,22 <br />223 <br />EFS-19 <br />LFG-Oneline Pumps23,24,25 <br />224 <br />EFS-20 <br />LFG - Pump Station Detai Is <br />225 <br />EFS-21 <br />LFG-Control Panels <br />226 <br />EFS-22 <br />LFG - Area Classification Boundaries <br />227 <br />EFS-23 <br />LFG-NORTH Blower -Site Plan & PS 33 <br />228 <br />EFS-24 <br />LFG- OnelineDiagram - North Blower <br />229 <br />EFS-25 <br />LFG - Wire Diagram - North Blower <br />230 <br />EFS-26 <br />LFG - SOUTH Blower- Site Plan & PS 21 <br />231 <br />EFS-27 <br />LFG-Oneline Diagram - South Blower <br />232 <br />EFS-28 <br />LFG - Wire Diagram - South Blower <br />233 <br />EFS-29 <br />LFG - Wire Diagram Gen-ATS - South Blower <br />IS ADDENDUM /5 REVISED DIS7RIBUN0N RDUDNG - PAGE RENUMBE3tIRG <br />Dah R.Wlf— <br />1 <br />I � <br />SWGP- <br />\ <br />\ <br />0 5100 200 S ` <br />cde In Feet <br />FOLLETT <br />ENGINEERING <br />& CONSULTING <br />SEATTLE, WA 425-765-6304 <br />12470v to <br />480v <br />Transformer <br />on Concrete <br />Pad18'1 I1 S <br />04EATER <br />M <br />i9ffiIIIiIIIIIIIIII1111 <br />Disconnect <br />- - -_ - <br />-_ <br />for truck wash <br />-PERIM <br />PUMP <br />F <br />TIM <br />and 120v <br />SrAT10N <br />(1) 4" Primary <br />Power Conduit <br />Transformer <br />LFG23 <br />Util <br />t r P <br />1 <br />Ov <br />(2) 2" Spu, <br />(1) 2" Conduit for Truck Wash <br />Conduits for <br />Future <br />iN <br />Truck Wash <br />a5 ... <br />48, <br />Lei <br />ED <br />120v Exi< <br />Services <br />re -power( <br />I: 1 1 <br />------ —Zzli,m i�l <br />Fes- -- <br />�5 <br />I i <br />RED - Medium Voltage 12470 <br />BLUE - 480V Power <br />4 <br />GREEN - 120v Power M° ARY <br />SWOL <br />ORANGE - Spare Conduits <br />�w•aI" ss� �'; <br />SITE ELECTRICAL: FACILITY LOCATIONS <br />AND 12.47KV CIRCUIT LAYOUT <br />M. FO <br />CONSTRUCTION SET 9/15/2020 <br />Omen By " SHELTER HOLDINGS, LLC Og D—Ing No. <br />a ~F` — EVERE17 RIVERFRONT DEVELOPMENT EFS_0 <br />DederAd By <br />Shelter <br />�0 28947 SITE ELECTRICAL 5h.9 W. Dd. P„jwt Number ELECTRICAL SITE COVER & DWG INDEX 204 233 <br />HOLDINGS Cal ibd=you Of of Tat <br />Die <br />Ling <br />!d <br />RCI - dwg - CONTROL DATE 09-15-2020 <br />