Laserfiche WebLink
VERETT <br />0 <br />Permit Number: E2112-029 <br />Applied: 12/3/2021 <br />Issued: 4/27/2022 <br />Status: FINALED <br />Parent Permit: B2111-024 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:4/19/2022 <br />Finaled: 10/20/2022 <br />Details: <br />ELECTRICAL SERVICE AND DISTRIBUTION PER PLAN <br />Description: ELECTRICAL SERVICE AND DISTRIBUTION PER PLAN <br />Site Address: 10318 EVERGREEN WAY <br />City, State Zip Code: EVERETT, WA 98204-3833 <br />Applicant: TAYLOR HERMAN <br />Owner: S R KLEIN FISH -ON INVESTMENTS LLC <br />Contractor: VALLEY PLUMBING/ELECTRIC INC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />5/23/2022 <br />5/23/2022 <br />ELEC 03- <br />SLAB/CONDUIT <br />STEVE BANKS <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />5/19/2022 4:04 PM LauriAnn Venhuizen <br />Contact Name: LauriAnn Venhuizen <br />Site Address: 10318 EVERGREEN WAY <br />Phone:3609889631 <br />e-Mail: office@valleype.com <br />(5/23/2022 1:54 PM SKB) <br />skb changed Inspection Type from ELEC 02-GROUND WORK to ELEC 03-SLAB/CONDUIT <br />(5/23/2022 1:56 PM SKB) <br />Four conduits stubbed up inside the building one stubbed up outside the building three extending beyond a few feet to the northwest. <br />7/22/2022 <br />7/22/2022 <br />ELEC 06-ROUGH IN <br />STEVE BANKS <br />I NOT READY <br />Notes: <br />Finish wiring the HVAC system light in the attic etc. Raise all junction boxes above the insulation line per WAC 296-46B-314.001. Install box extenders for <br />outdoor lighting boxes do not pass through combustible materials etc. <br />7/22/2022 <br />7/22/2022 <br />ELEC 05 SERVICE <br />STEVE BANKS <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />7/20/2022 4:23 PM LauriAnn Venhuizen <br />please also inspect rough in and they would like morning inspection <br />Contact Name: LauriAnn Venhuizen <br />Site Address: 10318 EVERGREEN WAY <br />Phone:3609889631 <br />e-Mail: office@valleype.com <br />(7/22/2022 2:24 PM SKB) <br />Install a grounding electrode system for the service. Label the available fault current on the service. Label the service main disconnect. <br />I <br />Printed: Friday, 24 February, 2023 1 of 3 rk <br />SUPERION <br />