My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11822 24TH DR SE 2023-12-06
>
Address Records
>
24TH DR SE
>
11822
>
11822 24TH DR SE 2023-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 7:53:45 AM
Creation date
3/16/2023 4:01:19 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH DR SE
Street Number
11822
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESIDENTIAL PHOTOVOLTAIC PERMIT APPLICATION (Page 1 of 2) <br />CITY OF EVERETT PERMIT SERVICES <br />EVERETT 3200 CEDAR STREET, EVERETT, WA 98201 <br />WASHINGTON (P) 425-257-8810 1 FAX 425-257-8857 1 (E) everetteps@everettwa.gov I www.everettwa.gov/permits <br />PROJECT SITE INFORMATION <br />PROJECT ADDRESS: 11822 24th Dr SE, Everett, WA 98208 PARCEL M 0099270000100 <br />BUILDING TYPE: s❑ SFR-DETACHED ❑ SFR-ATTACHED / TOWNHOUSE ❑ DUPLEX <br />CONTACT INFORMATION <br />OWNER NAME: Jenica Valdivia <br />CONTRACTOR NAME: Solgen Power, LLC <br />CONTRACTOR LIC. #(REQUIRED): SOLGEPL830RJ <br />CITY OF EVERETT BUSINESS LIC. #(REQUIRED): <br />PRIMARY CONTACT: ❑ OWNER 0 CONTRACTOR ❑ OTHER (Please Specify) <br />CONTACT NAME: <br />Nathan Kelly <br />CONTACT PHONE: (855) 709-1181 <br />ICONTACT EMAIL: permitting@solgenpower.com <br />SOLAR PANEL APPLICATION INFORMATION <br />PV SYSTEM DESCRIPTION (include manufacturer and model, # of PV modules and inverters): <br />PV Solar Roof Mount Installation, 2 Circuits, 5.55 kW <br />15 modules of SUNTECH STP370S-B60/WNHB <br />Hoymiles Series HM-1200 (3), HM-600 (1), HM-300 (1) <br />BUILDING PERMIT CHECKLIST <br />DETERMINE IF YOUR PROJECT QUALIFIES FOR AN OVER-THE-COUNTER BUILDING PERMIT: <br />If you answer yes to all of the below questions, the project qualifies for an over-the-counter building permit. <br />YES <br />NO <br />1. PV system is designed and proposed for a detached one- or two-family dwelling or townhouse not more than three <br />stories above grade or detached accessory structure that is code compliant to setbacks and height, or code allows <br />expansion of nonconformity for solar modules. [IRC 101.2] <br />El <br />❑ <br />2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by the local jurisdition. <br />✓❑ <br />❑ <br />3. Rooftop is made from lightweight material such as a single layer of composition shingles, metal roofing, lightweight <br />masonry, or cedar shingles. <br />❑ <br />4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] <br />✓❑ <br />❑ <br />5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must <br />be obtained from the Authority having Jurisdiction to administer the electrical code. [IRC M2302.2] <br />❑ <br />❑ <br />6. The installation shall meet the requiremetns of the International Fire Code as amended by WA State. [IRC M2302.2] <br />✓❑ <br />❑ <br />7. The PV system is designed for the wind speed of the local area, and will be installed per the manufacturer's <br />specifications. [IRC M2302.2.1(1)] <br />❑ <br />❑ <br />8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(1)] <br />✓❑ <br />❑ <br />9. The total dead load of modules, supports, mountings, raceways, and all other appurtenances weigh no more than four <br />pounds per square foot. [IRC M2302.2.1(3)]. Enter total dead load of system (lbs/sq.ft.): 2.77 <br />❑ <br />❑ <br />10. To address uplift, modules are mounted no higher than 18" above the surface of the roofing to which they are affixed. <br />[IRC M2302.2.1(4)] <br />❑ <br />❑ <br />11. Supports for solar modules are installed to spread the dead load across as many roof -framing members as needed to <br />ensure that no point load exceeds fifty (50) pounds. [IRC M2302.2.1(5)] <br />❑ <br />❑ <br />12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire -retardant <br />treated wood equivalent to that required for the roof construction. [IRC M2302.2.1] <br />❑ <br />❑ <br />13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, rodents, and insects. [IRC M2302.2.2] <br />✓❑ <br />❑ <br />14. PV modules are listed and laveled with a fire classification in accordance with UL 1703. [IRC M2302.2.3] <br />✓❑ <br />❑ <br />Comments: <br />PLEASE FILL OUT A CITY OF EVERETT BUILDING PERMIT APPLICATION IF YOU QUALIFY FOR AN OTC BUILDING PERMIT. <br />Continue on to Page 2 of Application <br />City of Everett Official Use Only <br />ASSOCIATED BUILDING PERMIT # <br />B <br />(Revised 913012016) <br />
The URL can be used to link to this page
Your browser does not support the video tag.