Laserfiche WebLink
I <br />I <br />I <br />Line <br />-------------- <br />--� <br />O <br />String 1 <br />— <br />+/ <br />11 modules <br />+ <br />Z <br />o <br />U <br />------------------- <br />---- <br />Load <br />String 2 <br />U <br />° <br />9 modules <br />+ <br />5 <br />I <br />— — — <br />A�B <br />Co -Located <br />with Net Meter Customer Owned <br />(less than 10' away) Production Meter <br />0 Equipment Schedule <br />Ref. <br />Category <br />Equipment <br />QTY <br />1 <br />Modules <br />REC 405w Alpha BOB <br />20 <br />2 <br />Optimizers <br />S440 SolarEdge Optimizer <br />20 <br />3 <br />Jbox <br />Jbox <br />4 <br />4 <br />Inverters <br />Solar Edge SE7600H <br />1 <br />5 <br />Disconnect <br />60A 600V 2 Pole I Heavy Duty, No Fuse, Lockable <br />1 <br />6 <br />MeterBase <br />MeterBase-125A 4 Jaw w/ 3.5" AWCAP <br />1 <br />Meter <br />Landis Gyr EA110000-OP29 240V <br />1 <br />Monitoring <br />I SolarEdge Integrated (inverter) Monitoring <br />1 <br />0 Conductor Schedule <br />(Existing) <br />Main Service Panel <br />(lph 240V Service) <br />Main Breaker: 200A <br />Bus Rating:200A <br />Solar OCPD: 2p40A <br />■ = A & R Scope <br />= Existing or A&RSOLAR <br />Others Scope <br />3211 Martin Luther King Jr Way S. <br />Seattle, WA 98144 (206)707-9937 <br />Meter Bank <br />LfV <br />01 <br />I nverter Specs <br />Watts <br />LAI <br />Output <br />AC <br />Voltage <br /># of <br />Inverters <br />OCPD <br />LAI <br />Solar Edge SE7600H <br />7600 <br />32 <br />240 <br />1 <br />40 <br />****N/A**** <br />0 <br />0 <br />0 <br />0 <br />0 <br />****N/A**** <br />0 <br />0 <br />0 <br />0 <br />0 <br />Module Specs <br />Watts (wJ <br />Imp <br />Vmp <br />Voc <br />Isc <br />REC405wAlpha BoB <br />405 <br />9.56 <br />42.4 <br />48.9 <br />10.14 <br />Temp. Adjusted <br />0 <br />0 <br />37 <br />52.7 <br />0 <br />Summary <br />Distance (ft) <br />Current <br />@125% <br />Operating <br />Voltage <br />Voltage <br />Drop <br />Volt. Drop <br />(total) <br />A <br />(2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR <br />50 <br />18.75A <br />400V <br />0.35% <br />1.11% <br />B <br />(4)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) <br />50 <br />18.75A <br />400V <br />0.35% <br />C <br />(2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) <br />10 <br />40A <br />240V <br />0.21% <br />D <br />(2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) <br />10 <br />40A <br />240V <br />0.21% <br />General Notes: <br />THIS DRAWING CONSTITUTES THE <br />CONFIDENTIAL INFORMATION OF A&R SOLAR <br />AND ITS RECEPTOR. POSSESSION DOES NOT <br />CONFER ANY RIGHT IN OR LICENSE TO USE IT <br />OR THE INFORMATION DISCLOSED HEREIN <br />NOR ANY RIGHT TO REPRODUCE THIS <br />DRAWING OR ANY PART HEREIN WITHOUT <br />THE WRITTEN CONSENT OF A&R SOLAR. <br />E <br />= <br />Q <br />—00 <br />M <br />To Neighbor's <br />Main Service Panel <br />*j <br />LU <br />p <br />N <br />Lr) <br />00 <br />0 <br />V) <br />Q> <br />m <br />� <br />O <br />Ln <br />a� <br />QC:)0, <br />.. <br />o <br />,-, kO <br />0 <br />V� <br />-a <br />co <br />v <br />4- <br />`- <br />> <br />• O <br />U) <br />W <br />a� <br />REVISIONS <br />Rev. #: I Date: <br />Utility: SnOPUD Designed by: Wes K. <br />1. EGC Where exposed to physical damage will be #6AWG Project Manager: <br />Bare CU Diallo Josey <br />2. If installing conduit on the roof, maintain greater than 7/8" (253) 267-4600 <br />above the surface <br />3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Current Date:Sep 12, 2022 <br />Disconnect <br />4. For supply side taps, a #6 GEC (min.) will be run separately <br />from the disconnect and connected to the grounding electrode E1 Single Line <br />with an irreversible crimp <br />