Laserfiche WebLink
GENERALNOTES <br />A. DARK LINE WEIGHT ON DEMO PLANS INDICATES EXISTING WORK THAT IS TO BE <br />DEMOLISHED. DARK LINE WEIGHTS ON NEW PLANS INDICATES NEW WORK. HALF <br />TONED LINE WEIGHT INDICATES EXISTING CONDITIONS WHICH ARE TO REMAIN. <br />B. REFER TO HEATING WATER DIAGRAM. <br />C. PROVIDE ACOUSTICAL TILE CEILINGS AS NECESSARY. FIELD VERIFY REQUIREMENTS. <br />D. FIELD VERIFY ALL LOCATIONS OF SPACE THERMOSTATS. <br />15 16 17(18) <br />I I I I <br />r <br />I I <br />I I <br />II I I I <br />24x24 RR BD I' <br />CO3 W CFD 2µx24 RR <br />28x10 <br />— — — �� — — — — <br />9x9 SD WI CFD 26x6 M <br />95 CFM <br />T T(3TYP`.) T O <br />_�--------J AHU-Ci� <br />— — — — L9 Bx10 LZOx12 <br />L <br />---- <br />AHU-Cl 6x6 FD I ID <br />1 114" ON. L 12x10 BY GEN. CONTR. <br />_ _ <br />8x6 ER WI CFD S —� OSA LOUVER 1, <br />100 CFM 1114" L6z6 L6x6 C07 <br />HWR (TYP.) <br />HWS 3/4" <br />9.9 SO WI CFD <br />1fi0 CFM ��- L10x8 L10x6 6x6 SD W/CF Bx6 ERWI CFD <br />I Bxfi 2 9x9 SO WI CFD 0 CFM 100 CFM <br />EF Ci 95CFM o CO <br />02 I 1 ��"�/I <br />o 314" <br />Bx6 AHU- 2 6x6 � <br />T S <br />J — — C01— I 8x8 IUD FD <br />L1200 1800 <br />_12x12 ER L1W8 12002 AHU-C2 1 <br />300 CFM J� <br />26x6 SR <br />335 CFM <br />(3 TYP.) <br />�K� <br />C04 28x10 <br />2424 RR <br />WI CFD 24x24 RR <br />BD <br />I I I <br />MECHANICAL DEMO PLAN - BUILDING C - LEVEL 1 <br />;19) <br />KEYNOTES <br />1 DEMOLISH VERTICAL AHU, MIXING BOX, AND DISCHARGE PLENUM IN CLOSET AND <br />ASSOCIATED APPURTENANCES. DEMO BACK DUCTWORK AND PIPING AS NECESSARY <br />TO INSTALL NEW UNIT. DEMOLISH RETURN AIR DAMPERS AND OUTDOOR AIR DAMPER. <br />DEMOLISH HOT WATER CONTROL VALVE. DEMOLISH WALL MOUNTED SUPPLY <br />DIFFUSERS. PATCH WALL TO MATCH FINISHES. SEE DETAIL 71M-500 FOR MORE <br />INFORMATION. <br />2 INSTALL INLINE EXHAUST FAN IN EXISTING 12" DIAMETER DUCTWORK. ENSURE <br />PROPER CLEARANCES FOR FAN. <br />3 DEMOLISH EXISTING TEMPERATURE SENSORS AND OVERRIDE SWITCH. <br />ai0 try <br />fe Of Your Building <br />McKINSTRY Co, LLC <br />SEATTLE: <br />5005 3RD AVENUE S <br />PO BOX 24567 <br />SEATTLE, WA 98124 <br />1-800-669-6223 <br />www.mckinstrv.com <br />PROJECT. <br />MUKILTEO SD <br />PHASE 10 HVAC <br />IMPROVEMENTS <br />- HORIZON ES <br />222 W CASINO RD <br />EVERETT, WA 98204 <br />CONSULTANTS: <br />AD ID <br />LJ!j <br />ISSUE: <br />PERMIT SET <br />05/06/2022 <br />REGISTRATION: <br />�R p'�F WA 'ar'LD <br />52771 Q <br />PolE'GISTS <br />% AL <br />ISSUES <br />SR ENGINEER: <br />L. HESS <br />DRAWN BY: <br />M. SAFONOV N. HOBURG A. PASSAS <br />QC BY: <br />L. HESS <br />JOB NO: <br />205557-004 <br />ISSUED ON: <br />05106/2022 <br />SHEET TITLE: <br />MECHANICAL DEMO <br />PLAN - BUILDING C <br />SCALE: 1/8" = 1'-0" 0 4' 8' 16' <br />SHEET NUMBER: <br />MD-1 02 <br />