Mukilteo School District — Horizon Elementary School <br />HVAC Upgrades <br />project. <br />• Attended construction meetings as needed <br />• Attended weekly controls meetings <br />• Conducted site tours leading up to the equipment startup. <br />• Tracked issues on CxAlloy <br />• Scheduled prestart and startups of the new equipment. <br />o Vertical AHU's for classrooms. <br />■ Building B <br />• Four vertical AHUs <br />■ Building C <br />• Two vertical AHUs <br />■ Building D <br />Twenty -Eight vertical AHUs <br />o Five Fans <br />■ Four Exhaust Fans <br />■ One Relief Fan <br />• Functional Performance Testing on the following units and systems <br />o AHU Operation <br />■ Building B <br />• Four vertical AHUs <br />■ Building C <br />• Two vertical AHUs <br />■ Building D <br />• Twenty -Eight vertical AHUs <br />o Hot Water Coil Operation <br />• For the newly installed science rooms. <br />o Exhaust Fan Operation <br />■ Four Exhaust Fans <br />■ One Relief Fan <br />POST CONSTRUCTION <br />The following is a list of the actions performed during the post construction phase of <br />the project. <br />• Track and close issues <br />• Publish Final Commissioning Report <br />o Collect TAB report <br />o Collect Factory Startup Reports <br />o Compile Executive Summary <br />KEY FINDINGS <br />• Numerous observations have been identified through this project. The <br />following is a brief summary of key findings. <br />• Issues were found and corrected during both the startup phase and testing <br />instry 1Page 3 of 4 Mariner HS - 205557-012 <br />!e OI Yanr BuIIJlnB <br />