Laserfiche WebLink
5/6122, 12:05 PM https://waenergycodes.com/print project_summary_form.php?k=Y29tYm9fdGZ2X3BOPW11Y19odmFjX3N5c196b25pbmdfc2luZ2xlJTdDcGRfYWxOZXJhdGlvbiZOZnY9bWvjX2h2Y... <br />rMECRAINIC UMMARY No" <br />2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all RI Administered by: ©2022 NEEA, All rights reserved <br />Project & Applicant <br />Information <br />Project Title <br />Mukilteo SD Phase 10 HVAC Improvements - Horizon ES - 2018 WSEC <br />For Building Department Use: I Date: May 06, 2022 <br />Project Address <br />222 W Casino Rd <br />Everett, WA 98204 <br />Applicant Name <br />Liesbet Hess <br />Applicant Phone <br />206-832-8446 <br />Applicant Email <br />liesbeth@mckinstry.com <br />For questions about this report, <br />contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />General Occupancy <br />All Commercial <br />General Building Use Type <br />Education, Primary (Elem/Mid) <br />Building Cond. Floor Area <br />42,500 <br />New Building <br />Alteration <br />Project Cond. Floor Area <br />42,500 <br />Floors Above Grade <br />2 <br />General Project Types <br />Alteration <br />or Addition <br />Mechanical Scope <br />Single Zone Systems & Equipment <br />Compliance Method <br />Compliance Method 1 - General <br />Mechanical Scope <br />The existing elementary school building is served by a hydronic heating system. The classrooms each have existing single zone vertical air handlers that will be replaced with new vertical air <br />Mechanical Project Description <br />handlers. The new units will have EC motors and be capable of 100% economizer function. The office areas are served by single zone hydronic heating -only duct coils. These coils will be <br />replaced in kind. Various exhaust fans serving restrooms will be replaced in kind. A retum/relief fan serving the administration building will be replaced in kind. The existing multi -zone air <br />handlers serving the administration building will be serviced, but new motors, belts, etc. but the fans will stay in place. <br />Project <br />Economizer <br />DOAS Ventilation <br />Higher Equipment <br />Equipment Efficiency <br />Mechanical Compliance <br />Type <br />Mechanical Scope <br />ti <br />Exception(s) <br />� <br />Applied. <br />Provided. <br />Efficiency Option Applied? . <br />Compliance <br />Verification <br />Scope and Method <br />Alteration <br />Single Zone Systems & <br />No <br />No <br />NA <br />COMPLIES <br />Equipment <br />Additional Efficiency <br />Credits Included (AEC) <br />Does building include occupancy classifications requiring <br />Yes <br />Does project include DOAS equipment? <br />No <br />DOW <br />Based on project scope do TSPR requirements apply? <br />Yes <br />Do all systems comply with Appendix D standard reference design or qualify for an exception to <br />Yes <br />TSPR? <br />Scope & Space Conditioning ALTERATION - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verification COMPLIES <br />Single Zone Air Systems Category - Fan coil unit, hydronic & VRF <br />Air Systems Summary Information <br />System/Equip ID <br />Quantity of Items <br />Supply Airflow <br />Control <br />Ventilation Standard <br />Ventilation CFM <br />(Total if Multiple Items) <br />Ventilation <br />Air Source <br />Paired with DOAS <br />AHU-D-13, AHU-132-13 <br />2 <br />Constant volume <br />ASHRAE Standard 62.1 <br />400 <br />Integral <br />AHU-D-14, AHU-D2-14 <br />2 <br />Constant volume <br />ASHRAE Standard 62.1 <br />500 <br />Integral <br />AHU-B1, -B2, -B2-1, 132-2, -D 1, -D2, -D3, -D4, -D5, -D6, -D8, -D9, -D10, -D11, -D12, -D2-1, -D2-2, -D <br />28 <br />Constant volume <br />ASHRAE Standard 62.1 <br />500 <br />Integral <br />AHU-C2 <br />Constant volume <br />ASHRAE Standard 62.1 <br />500 <br />Integral <br />AHU-C 1 <br />Constant volume <br />I ASHRAE Standard 62.1 <br />500 <br />Integral <br />Air Systems & Equipment - Heating <br />AEC <br />Proposed <br />Proposed Heat <br />Proposed <br />Efficiency <br />System <br />Heating System/Equip <br />Specific <br />Heat Pump Heating <br />Cooling Capacity <br />Efficiency <br />HPH <br />Low OSA <br />LTH <br />Compliance <br />/Equip ID <br />Type <br />Type <br />Capacity (Btu/h) <br />(Btu/h) <br />Multiplier <br />Heating <br />Units <br />Temp <br />Units <br />Verification <br />Efficiency <br />Efficiency <br />AHU-B 1, -112, -132-1, B2-2, -D 1, -D2, -D3, -134, -135, -D6, -138, -139, -D10, <br />Fan coils, hydronic & <br />Hydronic, <br />1 <br />COMPLIES <br />-D11, -D12, -D2-1, -D2-2, -D <br />VRF, heating <br />2-pipe <br />AHU-D-14, AHU-D2-14 <br />Fan coils, hydronic & <br />Hydronic, <br />1 <br />COMPLIES <br />VRF, heating <br />2-pipe <br />AHU-C2 <br />Fan coils, hydronic & <br />Hydronic, <br />1 <br />COMPLIES <br />https://waenergycodes.com/print project_summary_form.php?k=Y29tYm9fdGZ2X3BOPW 1 IY19odmFjX3N5c196b25pbmdfc2luZ2xIJTd DcGRfYWxOZXJhdGlvbiZOZnY9bWVjX2h2YWNfc3lzX3pvbmluZ1... 1 /2 <br />