My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 MERRILL CREEK PKY 2023-04-03
>
Address Records
>
MERRILL CREEK PKY
>
1920
>
1920 MERRILL CREEK PKY 2023-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 2:39:03 PM
Creation date
4/3/2023 8:55:00 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: E2205-041 <br />Applied: 5/5/2022 <br />Issued: 5/6/2022 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:5/5/2022 <br />Finaled: 9/6/2022 <br />Details: <br />N/A <br />Installation of voice and data cables <br />Description: Installation of voice and data cables <br />Site Address: 1920 MERRILL CREEK PKWY <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: JUSTIN GANT <br />Owner: BPP PACIFIC INDUSTRIAL WA REIT OWNER 1 <br />Contractor: JAG CONSTRUCTION & COMM INC <br />SCHEDULED DATE <br />COMPLETED DATE TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />7/13/2022 <br />7/13/2022 ELEC 10-FINAL <br />MICHAEL <br />PARTIAL <br />WICKLANDER <br />APPROVAL <br />Notes: <br />MICHAEL@JAGCONSTRUCTION-COMM.COM <br />(7/13/2022 11:01 AM MHW) <br />Approved warehouse supports <br />Approved south IDF cabinet <br />Ensure grounding of north idf #2 cabinet and MDF cabinet <br />8/30/2022 <br />8/30/2022 <br />ELEC 10-FINAL <br />MICHAEL <br />APPRVD-PERMIT <br />eTRAKiT Inspection Request <br />WICKLANDER <br />FINAL <br />Notes: <br />8/29/2022 9:18 AM Justin Gant <br />Contact Name: Justin Gant <br />Site Address: 1920 MERRILL CREEK PKWY <br />Phone:4253503023 <br />e-Mail: justin@jagconstruction-comm.com <br />(8/30/2022 1:21 PM MHW) <br />Approved final for two stand alone offices both east and west units <br />I <br />Printed: Wednesday, 08 March, 2023 1 of 1 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.