Laserfiche WebLink
2018 WSEC Requirements for Commercial Buildings including Group R2, R3 & R4 over 3 stories & all R1 -- Administered by @2022 NEEA, All rights reserved <br />The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br />Washington State Energy Code, Commercial Provisions. <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />Project: <br />Snohomish Health District - 2018 WSEC <br />3020 Rucker Ave <br />Everett, WA 98201 <br />Date: 2022-12-19 <br />Applies <br />Code Section <br />Code Provision <br />Compliance Information Required In Permit <br />Location in <br />Building Department <br />Documentation <br />Documents <br />Notes <br />SCOPE <br />C103.1 <br />Construction <br />For a shell & core or tenant space (first build - <br />documents - General <br />out) project, indicate if there is no mechanical <br />scope included in the project. <br />NA <br />C103.1 <br />Construction <br />For an alteration project, indicate if there is <br />No Mechanical Scope <br />documents - General <br />no mechanical scope included in the project. <br />- Replacement <br />PERFORMANCE CRITERIA & SYSTEM DESIGN <br />NA <br />C403.1 <br />Exempt process <br />Identify equipment used by manufacturing, <br />equipment <br />industrial or commercial processes that are <br />not for space conditioning or maintaining <br />comfort and amentities for occupants; identify <br />provisions applicable to this equipment per <br />C403.1 exception <br />C403.1.1 <br />HVAC total system <br />For systems serving office, retail, library or <br />performance ratio <br />education occupancies, provide a TSPR report <br />(TSPR) <br />that demonstrates the proposed design ratio is <br />equal to or greater than the standard reference <br />design ratio, or exception applied <br />YES <br />C403.1.2 <br />Calculation of heating <br />Provide load calculations performed per <br />and cooling loads <br />ASHRAE Std 183 or equivalent, using design <br />parameters per C302 and Appendix C; <br />include load adjustments to account for <br />energy recovery <br />NA <br />C403.1.3 <br />Data centers <br />Provide documentation that demonstrates that <br />data center systems comply with the <br />maximum allowed Design MLC and <br />Annualized MLC per ASHRAE 90.4 with <br />2018 WSEC adjustments per climate zone <br />NA <br />C403.2.1 <br />Zone isolation <br />If there are HVAC zones that are intended to <br />C403.4.2.2 <br />be occupied non -simultaneously, identify <br />isolation zone areas on plans; if multiple zones <br />intended to be occupied simultanteously will <br />be combined into a single isolation zone, <br />include on plans that the combined zone area <br />does not exceed 25,000 sf and does not <br />include more than one floor; or exception <br />applied <br />NA <br />Indicate locations of associated zone isolation <br />dampers in HVAC distribution system <br />NA <br />Refer to HVAC Controls section in <br />Requirements List for applicable automatic <br />setback and shutdown controls requirements <br />EQUIPMENT SELECTION & PERFORMANCE <br />Page 1125 <br />