Laserfiche WebLink
AOUALIS <br />Before: Upper pond overflowing onto adjacent sidewalk; water flows back to lower pond (Feb. 7 <br />2020) ; berm to be installed beginning at concrete wall shown in yellow; berm will increase storage <br />capacity of pond and prevent water from bypassing this treatment basin <br />