My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 19TH AVE SE WINCO FOODS 2025-03-27
>
Address Records
>
19TH AVE SE
>
9900
>
WINCO FOODS
>
9900 19TH AVE SE WINCO FOODS 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:11:38 PM
Creation date
4/4/2023 9:25:19 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9900
Tenant Name
WINCO FOODS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L City of Everett Permit Review <br />CheckMate° Installation Procedure EVER... Status: Reviewed for Permit <br />01/19/2023 6:53:47 PM <br />NEVER.. NEVER... NEVER... NEVER... <br />Install the valve at an angle Use Sharp Tools on Rubber Exceed Design Back Pressure Install the Valve Backwards <br />Extraction t <br />Cuff <br />'Clamps are installed in the upstream or downstream cuff, depending upon the application. <br />The illustration above is shown clamped upstream. <br />CHECKMATE® INSTALLATION <br />1. Product Shipping 3. Inspection of Pipe I.O. <br />Valve sizes 2"-1S" are furnished with one clamp. Valves 20"-60" Check the inside diameter (I.D.) of the pipe section for rough or <br />ale <br />Area) <br />ship with two clamps.72" valves ship with three clamps. <br />damaged areas. The inside surface should be uniform and relatively <br />smooth. Long gouges or cracks in the pipe may allow water to Pass <br />NOTE: A clamp is installed on each end of the valve to keep the <br />and should be filled prior to installation. Do not attempt to install a <br />valve's shape during transit and storage. Once the installation <br />CheckMate° in a smaller pipe I.D. <br />orientation is determined the CheckMate° valve will be clamped <br />from either the upstream or downstream side. For vahres with two <br />4. Pipe I.O. Measurements <br />or three clamps, they can be installed onto the same side of the <br />valve and offset imm each other, as illustrated in Figure 1. <br />The pipe I.O. is to be checked in the field. It should be a consistent <br />diameter for the length of valve and should not be am of round. <br />2. Unpacking & Lifting <br />When there is a+/- tolerance an the pipe I.O., the CheckMate®Valve <br />should be ordered to the smallest pipe I.O.. Then, rubber adhesive <br />0o not use sharp tools when unpacking this product as it may <br />strip can be applied to both CheckMate° cuffs to build the cuff O.D. <br />damage the valve. <br />up to the actual pipe I.O. See procedure in N5. <br />For larger CheckMate° valves, the valve should be lifted with either <br />a sling or with supports around the O.D. at each side of the valve to <br />ease the installation procedure. Do net place an object through the <br />valve in order to lift. <br />CAUTION: Do not by W bend, collapse or fold the valve in order <br />to indurate the installation as this will cause Permanent dam- <br />age and will not allow the valve to realm rd a filly muM Shape. <br />Yi <br />Figure 1—Clam" shown installed On the some side of valve <br />
The URL can be used to link to this page
Your browser does not support the video tag.