My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 19TH AVE SE WINCO FOODS 2025-03-27
>
Address Records
>
19TH AVE SE
>
9900
>
WINCO FOODS
>
9900 19TH AVE SE WINCO FOODS 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:11:38 PM
Creation date
4/4/2023 9:25:19 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9900
Tenant Name
WINCO FOODS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JSACIVIL <br />Engineering I Planning I Management <br />Technical Memorandum <br />To: City of Everett <br />From: Brandon Johnson, PE—JSA Civil, LLC <br />Date: September 12, 2022 ■ City of EvereU Permit Review <br />EVER_E_TT StMUS: Reviewed for Permit <br />01/19/2023 6:54:26 PM <br />Subject: Pond Volume Adjustments <br />Project: Wince Foods Store No. 104 (Everett, WA) <br />1. INTRODUCTION: <br />This memorandum has been prepared by 1SA Civil USA) at the request of Wirco Foods (WinCo) and the City of <br />Everett (City) to document pond volume adjustments as a result of actions taken by Wince to resolve the <br />ongoing Flooding issues at the intersection of 100'" St SE and 16P Ave SE. <br />2. BACKGROUND: <br />Since 2016, Wince foods has taken significant steps to reduce ongoing Flooding. These steps are documented in <br />the January 2022 Technical Memorandum prepared by JSA Civil, which has been previously submitted to the <br />City of Everett. <br />Two of the items listed as corrections Impacted the volumes of the detention ponds south of Wince, known as <br />the lower and upper ponds. A detailed description of the corrective actions taken in each pond and the <br />corresponding pond volume adjustments are documented below: <br />• Lower Pond: The overflow standpipe in the lower pond was installed 2" above the rims of the <br />adjacent CB's in 16T' Avenue, contributing to the 16r" Avenue roadway Flooding. In April 2020, the <br />overflow standpipe was lowered by 6" which reduced the overall lower Pond volume by <br />approximately 7,348 CF. See the calculation below: <br />LOWER POND <br />ORIGINAL MAX. W.S. SQUAT E FOOTAGE <br />15128 <br />NEW MAX W.S. SQUARE FOOTAGE <br />14265 <br />ELEVATION DIFFERENCE(FT) <br />-0.5 <br />LOWER POND VOL. REDUCTION 7348.25 CF <br />
The URL can be used to link to this page
Your browser does not support the video tag.