Laserfiche WebLink
. 0 I ifl <br /> o� <br /> _:_i___,./ <br /> Duplex and Triplex:not meeting front porch and entrance 1eview Process II.Complete this <br /> requirements of EMC 19.08.050 checklist and submit with a mailing <br /> Historic overlay zones:not meeting design standards of hlstork list for REVII process with your <br /> overlay zone application. <br /> ['Detached ADUs:design fails to give appearance that the ADU is <br /> secondary to principal dwelling <br /> ['Siding,roofing, windows and building trim do not visually match <br /> those of the principal dwelling <br /> E:IRoof pitch not similar to predominant roof pitch on the principal <br /> dwelling <br /> 4)1=1Owner Occupancy Required. 01 Q eRkj,ktzt . Attach the following documents to <br /> your application if within R-S,R-1 <br /> Within the R-S,R-1 and R-2 zones,either the principal dwelling unit <br /> or the ADU shall be occupied by the owner of the property as his or or R-2 zones: <br /> her principal residence.Prior to issuance of a permit for an accessory ['Complete and attach the <br /> dwelling unit,the property owner shall submit to the City a signed Accessory Dwelling Unit Covenant if <br /> affidavit affirming that the owner occupies the principal dwelling as located within a R-S, R-1 or R-2 <br /> his or her principal residence and will occupy either the principal zone. <br /> dwelling or accessory dwelling after completion of the accessory Do NOT record document until <br /> dwelling unit.The owner shall record a covenant with the instructed by Planning Staff. <br /> Snohomish County Auditor,approved by the director,that shall run <br /> with the land as long as the ADU is maintained on the property.The <br /> property owner shall submit proof that the covenant has been <br /> recorded with the Snohomish County Auditor's office prior to <br /> issuance of the building permit. <br /> 5)a.The owner agrees and acknowledges the following: Owners Initial <br /> a.An ADU shall not be segregated from the ownership of the <br /> principal dwelling through a subdivision,condominium,or any <br /> other process. <br /> b.Only one ADU is permitted on a lot. <br /> 61JOwner Occupancy Certificate—Due April 1"of each year. IA V Q_ , ..\A\ IA <br /> Owners Initials <br /> If located within the R-S,R-1 and R-2 zones,the property owner shall <br /> certify to the City no later than April 1st of each year that the owner <br /> occupies one of the dwellings as his or her principal residence.Any OComplete and attach the Owner <br /> person who fails to report or falsely certifies that he or she resides in Occupancy Certificate form. A new <br /> a dwelling unit at the stated address shall be subject to the certificate is due on April 1s`of each <br /> enforcement and penalty provisions of EMC Chapter 1.20. year. <br /> az Page 2 of 5 <br /> Accessory Dwelling Unit Checklist <br /> EVERETT <br />