Laserfiche WebLink
4. SWPPP NARRATIVE (MR #2) <br /> The intent of this section is to provide the information necessary to support the <br /> engineering plans to implement a design that will; reduce, eliminate or prevent the <br /> discharge of stormwater pollutants, meet or exceed thewater quality and sediment <br /> management standards.for the City and..State,._and prevent adverse impacts to the <br /> receiving waters for this project. Note; this narrative is intended to support the SWPPP <br /> that is included with the Targeted Drainage Plans also a part of this submittal package to <br /> the City. <br /> A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: 0.13 acres <br /> Average slope for the short plat: 4% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Low <br /> Critical Areas downslope No <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the area of the parcel to be disturbed is <br /> flat and construction site runoff will pass through silt fencing or other perimeter filtration <br /> features prior to leaving the site, and that if site conditions warrant, additional BMP's can <br /> be implemented as corrective measures the Risk Category for this site is Low Risk. <br /> B. SWPPP MINIMUM ELEMENTS <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to fence the limits of <br /> clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and un-disturbed areas on the•proposed short plat. Approximately 82% (0.12 <br /> acres) of the project parcel will be cleared or disturbed for this project. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the patio/lawn area in rear of the existing SFR to be used as a <br /> construction entrance. At this time winter work is expected during the wet season. <br /> 3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> 4: Install Sediment Controls <br /> This site SWPPP proposes to construct/maintain a gravel entrance (BMP C105), <br /> vegetative buffer (BMP C102), silt fencing (BMP C233) and retention of the existing <br /> vegetation (BMP C101) that will provide a vegetated strip around the work area and any <br /> adjacent property line. The construction of these features should be completed before the <br /> clearingand:.grading:of.the_site. :Mulch (BMP C121) will also be used on the exposed soil <br /> as necessary to limit erosion. In addition, streets shall be cleaned as needed at the end of <br /> each workday or throughout the day if dirt and debris is tracked onto the paved surfaced. <br /> Diedrich Addition 21-0224 <br /> Sept 2021 Page 7 <br />