My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007 CEDAR ST 2023-04-10
>
Address Records
>
CEDAR ST
>
2007
>
2007 CEDAR ST 2023-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 10:58:34 AM
Creation date
4/5/2023 2:39:27 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
2007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In <br /> Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> Permit Number: P2106-011 Description:ADDITION TO EXTG HOME <br /> Applied:6/8/2021 Approved: 1/20/2022 Site Address:2007 CEDAR ST <br /> Issued:1/20/2022 Finaled:2/1/2023 City,State Zip Code: EVERETT,WA 98201-2570 <br /> Status:FINALED Applicant:NICOLE DIEDRICH <br /> Parent Permit: B2106-016 Owner: NANCY OLSON <br /> Parent Project: Contractor:CURTISS CONSTRUCTION CO INC <br /> Details: <br /> ADDITION TO EXTG HOME <br /> — <br /> LIST OF INSPECTIONS <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 03-ROUGH JASON CORRECTION <br /> 5/4/2022 5/4/2022 IN MORRISSEY REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 5/3/2022 8:41 AM Ryan Hammer <br /> Contact Name:TROY GRASSETH <br /> Site Address:2007 CEDAR ST <br /> Phone:4255311747 <br /> e-Mail:NMDIEDRICH@GMAIL.COM <br /> (5/4/2022 12:34 PM JJM) <br /> -Upstairs bathroom:Horizontal drain/wet vent off toilet is back graded from 3 by 2 combo to first 90.Replace medium turn 90 with long turn 90 per <br /> UPC 706.1 Approved Fittings and 706.3 Horizontal to Horizontal.Set grade to 2%slope per UPC 708.0 Grade of Horizontal Drainage Piping. <br /> -Upstairs bathroom:Take off for shower vent is below the centerline of the drain.For dry venting applications refer to UPC 905.2 Horizontal Drainage <br /> Pipe. <br /> -Medium turn 90 on upstairs lay trap arm needs to be changed to a long turn 90 per UPC 706.3 Horizontal to Horizontal. <br /> -Bored holes in floor joists for upstairs toilet drain exceed the limitations of the IRC R502.8.1 Sawn Lumber which limits bored holes to 2"minimum <br /> from tops and bottoms of the joist. <br /> -Downstairs Bathrooms:Grade for end of line building drain piping in crawlspace including 2"drain picking up back to back showers is below 2%closer <br /> to 1%or flat in a lot of places.Re establish grade per UPC 708.0 Grade of Piping. <br /> -Downstairs Bathrooms:Vent take off for back to back toilets is below the centerline of the drain.Bring vent to code per UPC 905.2. <br /> -Double fixture tee cannot be used on its side per UPC 706.3 Horizontal. <br /> -Support pex pipe in crawlspace every 32"on the horizontal per UPC 7.2 Horizontal Tubing. <br /> -No standing test on new pex domestic water system.Install test pressure guage on system to confirm test per UPC 609.4 Testing <br /> Upon completion of a section or of the entire hot and cold water supply system,the system shall be tested with water or air.The potable water test <br /> pressure shall be greater than or equal to the working pressure under which the system is to be used.The air pressure shall be a minimum of 50 psi(345 <br /> kPa).Plastic pipe shall not be tested with air.The piping system shall withstand the test pressure without showing evidence of leakage for a period of <br /> not less than 15 minutes. <br /> Exception:PEX,PP or PE-RT tube shall be permitted to be tested with air where permitted by the manufacturer's instructions. <br /> Printed:Thursday,02 March,2023 1 of 3 r4' <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.