My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10318 EVERGREEN WAY WOODS COFFEE 2023-07-31
>
Address Records
>
EVERGREEN WAY
>
10318
>
WOODS COFFEE
>
10318 EVERGREEN WAY WOODS COFFEE 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 11:08:16 AM
Creation date
4/5/2023 3:07:33 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10318
Tenant Name
WOODS COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wil: <br /> Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> BLDG 1.2- <br /> 8/4/2022 8/4/2022 INSULATION RAKEEB KHAN CANCELLED rescheduled to sooner date <br /> Notes: <br /> 8/2/2022 8:55 AM David Tomlinson <br /> please contact Dave at 425 501 865 <br /> Contact Name:David Tomlinson <br /> Site Address:10318 EVERGREEN WAY <br /> Phone:4259233224 <br /> e-Mail:dtomlinson@cpmnw.com <br /> (8/3/2022 1:27 PM RFK) <br /> Reschuled to sooner date 8/3/2022 <br /> 10/6/2022 10/6/2022 BLDG 12 RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> INSULATION REQUIRED <br /> Notes: <br /> 10/5/2022 2:07 PM David Tomlinson <br /> lock box code 1509 call Dave at 425 501 8065 <br /> Contact Name:David Tomlinson <br /> Site Address:10318 EVERGREEN WAY <br /> Phone:4259233224 <br /> e-Mail:dtomlinson@cpmnw.com <br /> Need electrical rough in inspection for ceiling grid. Electrical rough in was approved for only walls and hard lid areas. <br /> Provide updated detail from designer for new insulation design. Ventilation in attic spaces required per IBC 1202.2. Note:R-49 insulation required in <br /> attic spaces per WSEC Table C402.1.3. <br /> 10/6/2022 10/6/2022 BLDG 13-CEILING CORRECTION <br /> RAKEEB KHAN <br /> GRID REQUIRED <br /> Notes: <br /> Removed ceiling grid tiles and insulation during inspection to inspect the ceiling grid.Need electrical approval before insulating and covering. Remove <br /> all tiles and insulation. <br /> FIRE 03-BLDG FINAL CORRECTION <br /> 10/19/2022 10/19/2022 FOR FIRE JEFF ALFORD REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 10/6/2022 1:48 PM David Tomlinson <br /> Please call Dave at 425 5018065 <br /> Contact Name:David Tomlinson <br /> Site Address:10318 EVERGREEN WAY <br /> Phone:4259233224 <br /> e-Mail:dtomlinson@cpmnw.com <br /> Need Addressing Posted <br /> 10/19/2022 10/19/2022 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 10/18/2022 2:53 PM David Tomlinson <br /> Lock box code 1509 please call Dave at 425 5018065 <br /> Contact Name:David Tomlinson <br /> Site Address:10318 EVERGREEN WAY <br /> Phone:4259233224 <br /> e-Mail:dtomlinson@cpmnw.com <br /> Printed: Friday,03 March,2023 3 of 5 i-Z <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.