Laserfiche WebLink
5/25/2021 https://waenergycodes.com/print__ project_ summary_form.php?k=Y29tYm9fdGZ2X3BOPXNjY19mdWxseV9jb25kaXRpb251ZCU3Q3BkX25ldl9idWlsZGIuZyZOZnY9c2NjX2Z1bGx5X2Nvbm.. <br />I L_ff3MX._X­A__ZLX.&'%1M AMALTILAWR - _11111 --- Fh <br />2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all RI Administered by: (02021 NEEA, All rights reserved <br />Project & Applicant <br />Information <br />Project Title <br />Glint Car Wash - 2018 WSEC <br />For Building Department Use: I Date: N1 av 25, 2021 <br />Project Address <br />10330 Evergreen Way <br />Everett, WA 98204 <br />Applicant Name <br />Eric Koch <br />Applicant Phone <br />425-636-8006 <br />Applicant Email <br />cric@padgi.com <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupportCawacnergycodes.com <br />General Occupancy <br />All Commercial <br />General Building Use Type <br />Services, Car Wash <br />Building Cond. Floor Area <br />1,080 <br />Project Scope <br />New Building <br />Space Conditioning Categories <br />Fully Conditioned <br />Project Cond. Floor Area <br />1,080 <br />Floors Above Grade <br />I <br />Compliance Method <br />Compliance Method I - General <br />Envelope Project Description <br />Unheated slab -on -grade, intermediate wood framed walls with R-21 ball insulation, roof joists and deck with R-38 insulation entirely above the deck. Vertical glazing with a U value = 0.37, <br />and insulated opaque doors with a U value = 0.60. <br />Envelope <br />Compliance <br />Scope <br />Scope <br />Space Conditioning Category <br />Compliance Method <br />W W R/SRR <br />per Category <br />UA Calculation Adjustment <br />Fenestration Alternates <br />Compliance Verification <br />and <br />Method <br />New Building <br />Fully Conditioned <br />Prescriptive <br />5.8l% / 0% <br />None selected <br />No alternates selected <br />COMPLIES <br />Air Barrier Testing Air barrier testing included in project scope JAir Barrier Comments <br />Project Title Glint Car Wash - 2018 WSEC <br />Date TMFny 25, 2021 <br />Scope & Space Cti CON <br />ance Verification <br />COMPLIES <br />No alternates selected <br />NNindo%%-to-isall Ratio <br />5.81% Skylight -to -roof -ratio <br />0%"Vertical Fenestration Alternate <br />Opaque Envelope Assemblies <br />Insulation R-%"aloes <br />RooVCeiling <br />Location in Documents <br />Assembh II) <br />Assembly Location <br />Cavity <br />°Continuous <br />/openetration) <br />2nd Laver <br />(MB Roof) <br />11-Factor <br />Net Area (SF')( <br />Insulation entirely above deck <br />A-6.1 & A6.2 <br />Rool <br />Exterior <br />R-38.0 (<0.04%) <br />I,ORII <br />U-Factor Source: <br />U-Factor Source Description: <br />Is this assembly exterior or interior?: Exterior <br />Walls <br />Location in Documents <br />Assembly ID <br />Assembly Location <br />Cavity <br />Continuous <br />(%penetration) <br />Insulated %%all <br />Furring <br />I -Factor <br />Net Area (SF) <br />Wood -framed and other - Commercial <br />A2-1 <br />Exterior Walls <br />Exterior <br />R-21 <br />R-00.0 (<0.04%) <br />Which insulation code target does wall comply with?: R-21 Cavity + Intermediate Framing <br />U-Factor Source: <br />U-Factor Source Description: <br />Wall Framing Type (Standard, Inter., Advanced): Intermediate <br />Framing Depth: <br />Framing Spacing: <br />Is this assembly exterior or interior?: Exterior <br />Slab -on -grade Floors <br />Location in Documents <br />Assembly ID <br />Assembly Location <br />Slab Edge <br />Under Slab <br />F5e, <br />Mri h er <br />r9iingUnheated <br />slab <br />A6-1, A6-2 <br />Floor Slab <br />At grade level <br />R-10 <br />114 <br />F-Factor Source Description: <br />I -Factor Source: �► <br />Slab Insulation Method: 2 11 horizontal (no slab edge insulation) <br />�. <br />Fenestration & Opaque Door Assemblies <br />Insulation R-Values <br />v <br />Opaque Doors <br />Location in Documents <br />Assembly ID <br />Assembly Location <br />Door Insulation <br />NFactor <br />.4..,p <br />Roug <br />enin (SF) <br />N <br />https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3BOPXNjYl9mdWxseV9jb25kaXRpb251ZCU3Q3BkX25ldl9idWlsZGIuZyZOZnY9c2NjX2Z1bGx5X2NvbmRp bm 1/2 <br />