Laserfiche WebLink
r <br />3, <br />2018 WSEC Requirements for Commercial Buildings including Group R2, R3 & R4 over 3 stories & all R1 -- <br />Administered by @2021 NEEA, All rights reserved <br />The following information is necessary <br />to check a building permit application for compliance with the building <br />envelope requirements in the Washington State <br />Energy Code, Commercial Provisions. <br />For questions about this report, contact WSEC Commercial <br />Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />Project: <br />Glint Car Wash - 2018 WSEC <br />10330 Evergreen Way <br />Everett, WA 98204 <br />Date: 2021-05-25 <br />Applies Code Section <br />Component <br />Compliance Information Required In Permit <br />Location in Building Department <br />Documentation <br />Documents Notes <br />SCOPE <br />(' 103.1 <br />Construction <br />No envelope scope in project. <br />documents - General <br />C402.1.1.1 <br />Low energy spaces <br />identify low energy spaces on plans; include <br />calculations if applicable that demonstrate <br />eligibility for envelope provisions exemption <br />NA C402.1.1.2 <br />Semi -heated space, <br />Idcntit � s ini-heated space, on plan`, include <br />mechanical heating system type and <br />calculations that demonstrate eligibility for <br />wall insulation exemption <br />NA C402.1.1.3 <br />Greenhouse spaces <br />identify greenhouse spaces on plans; include <br />non -opaque assembly information and <br />mechanical heating system type if applicable, <br />that demonstrates eligibility for envelope <br />provisions exemption <br />C402.1.2 <br />Equipment buildings <br />Provide building sf area, average wall and <br />roof U-factor, installed electrical and <br />mechanical equipment information and <br />heating setpoint restriction, that demonstrates <br />eligibility for envelope provisions exemption <br />NA C402.1.2.1 <br />Standalone elevator <br />Provide building area, average wall and roof <br />hoistways <br />U-factor, installed mechanical equipment <br />information and heating setpoint restriction. <br />that demonstrates eligibility for envelope <br />provisions exemption <br />C410.2 <br />Walk-in cooler and <br />Identify walk-in cooler and freezer spaces on <br />freezer spaces <br />plans, including site assembled, site <br />constructed and prefabricated units <br />NA <br />Identify warehouse cooler and freezer spaces <br />on plans <br />NA C101.4.1 <br />Mixed residential & <br />identify spaces with different occupancy <br />commercial building <br />requirements on plans <br />NA C503.2 <br />Change of spare <br />Identify on plans existing unconditioned <br />conditioning <br />spaces changing to semi -heated or conditioned <br />alteration <br />space, and existing semi -heated spaces <br />changing to conditioned space; provide <br />calculations for existing and final level of <br />space conditioning <br />NA C505.1 <br />Change of occupancy <br />Identify on plans existing R S and U- <br />alteration <br />occupancy spaces undergoing a change in <br />occupancy and final occupancy type <br />NA <br />Group R spaces permitted before July 1, 2002 <br />that are undergoing a change to a commercial <br />occupancy shall be identified on plans <br />Page 118 <br />