�3i <br />MECHANICAL GENERAL NOTES: <br />1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE EXISTING <br />CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS <br />FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF <br />THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF CONFLICTS OR <br />DISCREPANCIES PRIOR TO SUBMISSION OF BID. <br />2. PROVIDE SEISMIC RESTRAINTS AS NEEDED FOR THE MECHANICAL SYSTEMS IN THE PROJECT BASED ON <br />THE SEISMIC ANALYSIS REQUIRED BY THE SPECIFICATIONS. <br />3, COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A <br />NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AND PIPING AS TIGHT TO STRUCTURE AS <br />POSSIBLE. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS. COORDINATE INSTALLATION OF <br />DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. <br />ANY MODIFICATIONS REQUIRED DUE TO LACK OF COORDINATION WILL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR AT NO EXTRA COST TO THE OWNER. <br />4. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED BY DIVISION 23 <br />UNLESS OTHERWISE NOTED. <br />5. NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING ARE SHOWN AT APPROXIMATE LOCATIONS. <br />FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND MAKE <br />ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. <br />VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING <br />SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. <br />6. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE <br />HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON ARCHITECTURAL DRAWINGS THAT ARE <br />INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS. <br />7. COORDINATE LOCATION OF ROOF MOUNTED HVAC EQUIPMENT AND ROOF PENETRATIONS WITH THE <br />ARCHITECTURAL AND STRUCTURAL DRAWINGS. <br />8. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) DUCTWORK AND <br />HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. REPLACE INSULATION THAT HAS <br />BECOME WET AT ANY TIME DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. <br />SEAL ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM <br />CEILING/RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING <br />COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED <br />DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO TURNING <br />SYSTEM OVER TO THE OWNER. THE INTERNAL SURFACES AND ASSOCIATED COILS OF ANY HVAC UNITS <br />THAT WERE OPERATED SHALL ALSO BE CLEANED. <br />9. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN <br />OR NOTED. <br />10. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SHALL BE FASTENED <br />TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS TO THE ABOVE FLOOR <br />SLAB OR ROOF EXCEPT WHERE CONCRETE INSERTS IN CONCRETE SLABS ARE ALLOWED BY THE <br />SPECIFICATIONS. <br />11. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS <br />PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER REPLACEMENT. <br />12. DRAIN, FLUSH, AND REFILL ALL PIPING SYSTEMS NECESSARY TO PERFORM THE WORK. REFERENCE <br />SPECIFICATIONS FOR FLUSHING PERFORMANCE REQUIREMENTS AND SUBMIT FLUSHING PLAN TO <br />ENGINEER FOR REVIEW. PROVIDE CHEMICAL TREATMENT FOR ALL PIPING SYSTEMS AFTER FLUSHING <br />AND REFILLING THE SYSTEM. <br />13. LOCATE AND SET THERMOSTATS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT LOCATIONS WITH <br />ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES WITH TOP OF DEVICE AT MAXIMUM 48' AFF TO <br />MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. PROVIDE INSULATED BACKING FOR <br />THERMOSTATS MOUNTED ON EXTERIOR BUILDING WALLS. INSTALL WIRING IN CONDUIT PROVIDED BY <br />DIVISION 26. AT A MINIMUM, PROVIDE CONDUIT IN THE WALL FROM THE JUNCTION BOX TO W ABOVE <br />THE CEILING. <br />14. REFER TO SPECIFICATIONS FOR DUCTWORK AND PIPING INSULATION REQUIREMENTS. DUCT SIZES ON <br />MEC I WICAL PLANS INDICATE CLEAR INSIDE AIRFLOW DIMENSIONS, INCREASE SHEET METAL SIZES <br />ACCORDINGLY TO ACCOUNT FOR THXW4ESS OF DUCT LINER. <br />COMISSIONING <br />PROJECT C0991IIIIISSIDNNG NEGUN2311INIITf SMALL CONFORM TO SECTION C4MM <br />OF THE MI MOLSfMfiTON STATE NONaIESIDENTYII ENERGY CODE THESE <br />REOUNNEIkIIIENTS INCLUDE. BUT ARE NOT L1rTED TO A C09YSSM)NING PLAN, <br />PRELINIIINRY COMMSSONNO REPORT, FINAL C09YSS101010 REPORT. AND <br />ACCEPTANCE AND SUPPORTING DOCUMENT& N ADDITION. PROVIDE SYST NI <br />OPERATIONAL TRAINING. OM MANUALS, AO RECORD DR/W9N0S TO THE <br />OMMER PER TE MI MASIIll TOM STATE NOI4REI DE NTIAL ENERGY CODE <br />MECHANICAL SYMBOLS <br />THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED. V2.03 <br />STANDARD MOUNTING HEIGHTS <br />HVAC DUCTWORK AND ACCESSORIES <br />PIPING SYMBOLS <br />PIPING LINETYPES <br />THERMOSTATS (USER ADJUSTABLE) (TOP OF DEVICE) 4B- <br />CONTROLS (TOP OF DEVICE) 46' <br />x, DUCTNIORK*OUPIENT TO BE REMOVED OR RELOCATED <br />Ex*TNG DUCIWORKIEOUIPMENT TO REMAIN <br />DHEIJt BLOT ORTI3ER� <br />INSULATED FLEXIBLE DUCT (MAX. 5'O' LONG) <br />��....yy <br />MOH DUCT WITH 46' RECTANGLE -ROUND BRANCH FITTING AND <br />66W AL VOLUME DAMPER <br />----- 0- DIRECTION OF FLOW <br />CONTROL VALVE <br />THEE -WAY CONTROL VALVE <br />SHUTOFF VALVE <br />�\~ CHECK VALVE <br />64BALANCING VALVE WITH PRESSURE PORTS <br />------S4- TRIPLE DUTY VALVE WITH PRESSURE PORTS <br />EXISTING PIPING TO BE REMOVED OR RELOCATED <br />EXISTING PIPING TO REMAIN <br />-CDH- CONDENSATE DRAIN - HIGH EFFICIENCY RTU (CDH) <br />-CD CONDENSATE DRAIN (CD) <br />ACID AUXILIARY CONDENSATE GRAIN (ACD) <br />- NPW - NON POTABLE WATER (NPW) <br />G NATURAL GAS IG) <br />NSTALL DEVICES AT THE MOUNTING HEIGHTS SHOWN ABOVE UNO IN THE CONSTRUCTION <br />DOCUMENTS. MOUNTING HEIGHTS LISTED ABOVE OR ELSEWHERE IN THE CONSTRUCTION <br />DOCUMENTS ARE AFF OR AFG TO BOTTOM OF DEVICE UNO. ALL DEVICES SHALL BE <br />INSTALLED W COMPLIANCE WITH CURRENT ADA AND LOCAL REQUIREMENTS. <br />ATI ON <br />O MECHANICAL OR FIRE PROTECTION PLAIN NOTE CALOUT <br />CU MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR PROVIDED <br />1 UNO) <br />CONNECTION POINT OF NEW WORK TO EXISTING <br />ELBOW WITH TURNING VANES <br />- 1� STRAINER <br />~ STRAINER WITH SLOWOFF <br />- --G- - - NATURAL GAS ON ROOF (G) <br />-MPG - MEDIUM PRESSURE NATL. GAS (MPG) <br />1 REFERENCE <br />DETAIL UPPER UMBER INDICATES DETAIL NUMBER <br />M 1 LOWER NUMBER INDICATES SHEET NUMBER <br />1 <br />SECTION CUT DESIGNATION <br />BRANCH DUCT WITH BELLNOUTM FITTING 6 MANUAL VOLUME <br />CONTROL DAMPER <br />Y IV 11�1 EXHAUST, GREASE EXHAUST, OR SPECIAL EXHAUST AIR DUCT UP <br />+���+ <br />1 A EXHAUST. GREASE EXHAUST, OR SPECIAL EXHAUST AIR DUCT DOWN <br />'� RETURN AIR DUCT UP <br />`I RETURN AIR DUCT DOWN <br />SUPPLY AIR OR OUTSIDE AIR DUCT UP <br />1 SUPPLY AIR OR OUTSIDE AIR DUCT DOWN <br />T RELIEFISAFETV VALVE <br />IIIIII SOLENOID VALVE <br />PRESSURE REDUCING VALVE <br />GAS PRESSURE REGULATOR <br />THERMOSTATIC MIXING VALVE <br />M <br />PIPE ANCHOR <br />C=-J- EXPANSION JOINT <br />f PPE GUIDE <br />PPIN SUPPORT <br />0 F A T TRAP <br />0 BUCKET TRAP <br />- - MPG- - MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG) <br />-FOSS FUEL OIL SUPPLY (FOS) <br />-FOR- FUEL OIL RETURN (FOR) <br />-FOV- FUEL OIL VENT(FOV) <br />LPG - LIO)IFIED PETROLEUM GAS (LPG) <br />-BFW- BOILER FEED WATER(BFIM <br />- HPS - HIGH PRESSURE STEAM SUPPLY (HPS) <br />- HPC - HIGH PRESSURE STEAM CONDENSATE HPC <br />1 ) <br />- LPS - LOW PRESSURE STEAM SUPPLY (LPS) <br />- -LPC- - LOW PRESSURE STEAM CONDENSATE (LPC) <br />-PD CONDENSATE PUMP DISCHARGE (PD) <br />AWEVFFF���+----- <br />NATIONS <br />MC AlR CONDITIONING <br />ACC AIR COOLED CHILLER <br />ACCU AIR COOLED CONDENSING UNIT <br />AFC ABOVE FINISHED CEILING <br />AFF ABOVE FINISHED FLOOR <br />AFG ABOVE FINISHED GRADE <br />A14J AUTHORITY HAVING JURISDICTION <br />AMU AIR HANDLING UNIT <br />Al ANALOG INPUT <br />AO ANALOG OUTPUT <br />AP ACCESS PANEL <br />APO AIR PRESSURE DROP <br />HOA HANOOFF-AUTOMATIC <br />HP HORSEPOWER <br />HTG HEATING <br />MVP HEATING HOT WATER PUMP <br />FI1V$JR HEATING MOT WATER SUPPLY/ <br />RETURN <br />W WC INCHES OF WATER COLUMN <br />L LOUVER <br />LAT LEAVING AIR TEMPERATURE <br />LDS LEAVING DRY BULB <br />LP LOW PRESSURE <br />LWS LEAVING WET BULB <br />AWG AMERICAN WIRE GAUGE <br />B BOILER <br />BAS BUILDING AUTOMATION SYSTEM <br />BB BACKBONE <br />LWT LEAVING WATER TEMPERATURE <br />MAU MAKE-UP AIR UNIT <br />MAX MAXIMUM <br />MBI 1000 BTU PER HOUR <br />EQIP6EM WITH FLEXIBLE DUCT CONNECTION <br />�THERMOSTATIC TRAP <br />� <br />SACKFLOW PREVENTER <br />-HMS- HEATING HOT WATER SUPPLY (HMS) <br />- H WR- HEATING HOT WATER RETURN ffWR) <br />BO BACKD AFT DAMPER <br />BD BLOVNDOWN ONH <br />BFC BELOW FINISHED CEILING <br />BFF BELOW FINISHED FLOOR <br />LAD MOTORIZED DAMPER <br />NFR MANUFACTURER <br />MIN MINIMUM <br />NIA NOT APPLICABLE <br />10' PECK SIZE) <br />Cgpl(TYPE) <br />]Op CFy CFM OF SUPPLY DIFFUSER OR REGISTER) <br />( ) <br />• PRESSURE GAUGE <br />E THERMOMETER <br />- CHINS - CHILLED WATER SUPPLY (CHINS) <br />- CHWR - CHILLED WATER RETURN (CHAIR) <br />BFG BELOW FINISHED GRADE <br />BFP BOILER FEED PUMP <br />NIC NORMALLY CLOSED <br />NIO NORMALLY OPEN <br />241Q4 (SIZE) <br />� PRESSURE AND TEMPERATURE TEST PLUG <br />— HGS- HOTMJSLLED WATER SUPPLY (HCS) <br />BHP BRAKE HORSEPOWER <br />BI BINARY INPUT <br />BO BINARY OUTPUT <br />BOD BOTTOM OF DUCT <br />BON BACK OF HOUSE <br />NOM NOMINAL <br />NC NOSE CRITERIA <br />NF NOT IN COD <br />NIC NOT W CONTRACT <br />OA OUTSIDE AIR <br />CEC I (TYPE) <br />� Nlq CFM (CFM OF EX/MUST GRILLE) <br />MAMMAL VOLUME DAMPER <br />�-�}� UNION <br />�.{� FEE CONNECTION <br />- HCR - HOT/GSLLED WATER RETURN (NCR) <br />-CWS- CONDENSER WATER SUPPLY CWS <br />1 ) <br />SOS BOTTOM OF STRUCTURE <br />BTU BRITISH THERMAL UNIT <br />CFM CUBIC FEET PER MINUTE <br />CH CHILLER <br />CHWSlR CHILLED WATER SUPPLV6RENRN <br />CLG COOLING <br />PICV PRESSURE INDEPENDENT <br />CONTROL VALVE <br />PROVIDE FURNISH AND INSTALL <br />OTV QUANTITY <br />RA RETURN AIR <br />RC ROOM CRITERIA <br />I� <br />SQUARE TO RDIDTRANSITION <br />!'� <br />RDA <br />�� DUCT MOUNTED SMOKE DETECTOR (50=SUPPLYmD=RETURN) <br />VACUUM RELIEF VALVE <br />4 AY AUTOMATIC AIR VENT <br />bM/V MANUAL AIR VENT <br />'-' <br />N'1 <br />-CWR- CONDENSER WATER RETURN (CWR) <br />- HPWS - HEAT PUMP WATER SUPPLY (HPWS) <br />- - HPWR - - HEAT PUMP WATER RETURN (MPWR) <br />CP CONDENSATE PUMP <br />CPT CONTROL POWER TRANSFORMER <br />CRAC COMPUTER ROOM AIR <br />CONDITIONING UNIT <br />RD RETURN DUCT <br />REA RELIEF AIR <br />RF RETURN FAN <br />RFR REFRIGERANT <br />R �91QNAT70N <br />O <br />FD FINE DAMPER <br />4 PRESSURE I VACUUM SWITCH <br />CLEANOUT <br />GP <br />RL REFRIGERANT LIQUID (RL) <br />-RD- REFRIGERANT DISCHARGE (HOT GAS) (RD) <br />-RS REFRIGERANT SUCTION (RS) <br />CRU COMPUTER ROOM UNIT <br />CT COOLING TOWER <br />CV CONTROL VALVE <br />CWP CONDENSER WATER PUMP <br />CWSIR CONDENSER WATER SUPPLY/ <br />RH RELATIVE HUMIDITY <br />RN ROOF MOOD <br />RPM REVOLUTIONS PER MINUTE <br />RTU ROOFTOP UNIT <br />SA SUPPLY AIR <br />FM FIE SMOKE DAMPER <br />SD SMOKE ONffR <br />�D ELBOW UP <br />- ELBOW DOWN <br />�RDB- REFRIGERANT DISCHARGE BYPASS ROB <br />(ROB) <br />ARV REFRIGERANT VENT (RV)+ <br />RETURN <br />CU CONDENSING UNIT <br />CHWP CHILLED WATER PUMP <br />DB DECIBELS <br />DBA A -WEIGHTED DECIBELS <br />SCP STEAM CONDENSATE PUMP <br />SD SMOKE DINT DETECTOR <br />SO SUPPLY DUCT <br />SF SUPPLY FAN <br />SH SENSIBLE HEAT CAPACITY <br />VO VOLUME DAMPER <br />O <br />MU MOTORIZED DAMPER <br />- TEE UP <br />�� LEE DOWN <br />DOC DIRECT DIGITAL CONTROL <br />DI DIGITAL INPUT <br />SOW SCOPE OF WORK <br />SP STATIC PRESSURE <br />ST STEAM TRAP <br />BD BACXDRAF-T D. <br />rQ g)OW UP WITH SHUT-OFF VALVE (SOU) <br />�� ELBOW DOWN WITH SMUT -OFF VALVE (SOV) <br />DISC DISCONNECT <br />ON DOWN <br />DS DUCT SILENCER <br />STN STEAM <br />TBO TO BE DETERMINED <br />8 TEE LIP WITH SHUT-OFF VALVE (SOY) <br />DX DIRECT EXPANSION <br />(E) EXISTING <br />EA EXHAUST AIR <br />EAT ENTERING AIR TEMPERATURE <br />TC_ TEMPERATURE CONTROLS <br />CONTRACTOR <br />TCP TEMPERATURE CONTROL PANEL <br />TF TRANSFER FAN <br />TFA TO FLOOR <br />; TEE DOWN WITH SHUT-OFF VALVE (SOY) <br />REDUCER <br />ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. REFER TO <br />DUCTWORK SPEGFIGTIONS FOR DUCTWORK INSULATION AND LINER INFORMATION. <br />ED EXHAUST DUCT <br />EDB ENTERING DRY BULB <br />EF EXHAUST FAN <br />EFF EFFICIENCY <br />EMS ENERGY MANAGEMENT SYSTEM <br />ESP EXTERNAL STATIC PRESSURE <br />ABOVE <br />TFB TO FLOOR BELOW <br />TH TOTAL HEAT CAPACITY <br />TSP TOTAL STATIC PRESSURE <br />TT TEMPERATURE TRANSMITTER <br />TYP TYPICAL <br />RECIOIXAATION PUMP <br />so <br />—_ P-TRAP <br />NGAS COCK <br />HVACCONTROLDEVICES <br />ETR EXISTING TO REMAIN <br />EWB ENTERINGWET BULB <br />EWT ENTERING WATER TEMPERATURE <br />UIF UNDERFLOOR <br />UK; UNDERGROUND <br />UIS UNDERSLAS <br />O HUMIDISTAT <br />OT THERMOSTAT <br />�— rovBEAMCIAMP <br />S TRAPEZE HANGER <br />LINETYPELEGEND <br />THROUGHOUT THE DRAWINGS DIFFERENT LINE -TYPES ARE USED IN COMBINATION WITH <br />THE SYMBOL$ TO INDICATE THE STATUS OF ITEM$ AS EXISTING, TO BE DEMOLISHED, TO <br />FCU FAN COIL UNIT <br />FFA FROM FLOOR ABOVE <br />UN UNIT HEATER <br />UNO UNLESS NOTED OTHERWISE <br />® CARBON MONOXIDE SENSOR <br />FFB FROM FLOOR BELOW <br />FF FINISHED FLOOR <br />FOH FRONT OF HOUSE <br />FP FINS PER INCH <br />VAV VARIABLE AIR VOLUME <br />VEL VELOCITY <br />VFD VARIABLE FREQUENCY DRIVE <br />V <br />VRF VARIABLE REFRIGERANT FLOW <br />® CARBON DIOXIDE SENSOR <br />DIFFERENTIAL PRESSURE SENSOR <br />BE INCLUDED AS PART OF NEW WORK AND/OR ITEMS WHICH ARE ANTICIPATED TO BE <br />PROVIDED W THE FUTURE. THE STATUS OF ITEMS USING THESE LINETYPES ARE RELATIVE <br />TO THE VIEW IN WHICH THEY APPEAR. PHASING SHOWN IN DRAWINGS IS NOT INTENDED <br />FPM FEET PER MINUTE <br />GC GENERAL CONTRACTOR <br />WITH <br />WXX WITHOUT <br />WB WET BULB <br />FSI FLOW SWITCH <br />TO FULLY DESCRIBE ALL NECESSARY CONSTRUCTION PHASING. WHICH IS DETERMINED BY <br />THE CONTRACTOR AS PART OF THEW RESPONSIBILITIES. ANY SUCH PHASES DESCRIBED <br />IN THE CONSTRUCTION DOCUMENTS ARE GENERAL AND ONLY INTENDED TO INDICATE A <br />GEA GREASE EXHAUST AIR <br />GPM GALLONS PER MINUTE <br />WC WATER COLUMN <br />MS HUMIDITY SENSOR <br />BROAD ORDER FOR THE SAKE OF DESCRIBING THE PROJECT. THE FOLLOWING LINETYPES <br />MAY BE USED ON ANY DEVICE. EQUME, NOTE, LINE. SHAPE. ETC. <br />EQUIPMENT, <br />WATER PRESSURE DROP <br />XP EXPLOSION -PROOF <br />P© PULL STATION <br />$® STATIC PRESSURE <br />EXISTING <br />NEW <br />®DEMOLISH <br />TEMPERATURE SENSOR <br />FUTURE ________________ <br />CITY OF F-VE-REIT <br />FEB 10 2023 <br />CITY OF JL ;L <br />Permit #: <br />Site Address: <br />M2302-051 <br />10330 EVERGREEN WAY <br />permit servic <br />Owner: <br />S R KLEIN FISH -ON INVESTMENTS LLC <br />Tenant: <br />GLINT CAR WASH <br />App. Date: <br />2/10/2023 <br />Proposed Use: <br />COMMERCIAL MECHANICAL (PLAN REVIEW <br />REQUIRED) <br />Description: <br />INSTALL VENTILATION FOR VACUUM <br />EQUIPMENT KIOSK <br />Reviewed By: <br />_ Date:4_�_ <br />V/Office Set Job Site Set <br />RHENDERSON <br />ENiMNEER. <br />&US U NEXA DRIVE. STATE 300 <br />LEKEA/L KS U214 <br />TEL 913.742.WW FAA 913.742.S001 <br />wwwJE46MONOW0@R&COY <br />2150=51 <br />WA CORPORATE N UME R 1754 <br />0&= <br />V) <br />W <br />"ss <br />W <br />n <br />.N <br />W <br />d' <br />DRAWN: TY <br />CHECK: JNH <br />JOB NO: 20-020 <br />VO <br />i <br />U� � <br />� z w <br />} W 0 ; c� <br />�� <br />111 <br />v�3 w <br />WW <br />W <br />lu J o <br />Z <br />� UC p z = <br />—� U <br />� 0� W <br />09ul � <br />SHEET: <br />MO <br />OF: — SHEETS <br />