My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10330 EVERGREEN WAY GLINT CAR WASH 2023-04-10
>
Address Records
>
EVERGREEN WAY
>
10330
>
GLINT CAR WASH
>
10330 EVERGREEN WAY GLINT CAR WASH 2023-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 11:28:51 AM
Creation date
4/5/2023 3:40:38 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10330
Tenant Name
GLINT CAR WASH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�3i <br />MECHANICAL GENERAL NOTES: <br />1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE EXISTING <br />CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS <br />FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF <br />THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF CONFLICTS OR <br />DISCREPANCIES PRIOR TO SUBMISSION OF BID. <br />2. PROVIDE SEISMIC RESTRAINTS AS NEEDED FOR THE MECHANICAL SYSTEMS IN THE PROJECT BASED ON <br />THE SEISMIC ANALYSIS REQUIRED BY THE SPECIFICATIONS. <br />3, COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A <br />NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AND PIPING AS TIGHT TO STRUCTURE AS <br />POSSIBLE. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS. COORDINATE INSTALLATION OF <br />DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. <br />ANY MODIFICATIONS REQUIRED DUE TO LACK OF COORDINATION WILL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR AT NO EXTRA COST TO THE OWNER. <br />4. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED BY DIVISION 23 <br />UNLESS OTHERWISE NOTED. <br />5. NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING ARE SHOWN AT APPROXIMATE LOCATIONS. <br />FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND MAKE <br />ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. <br />VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING <br />SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. <br />6. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE <br />HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON ARCHITECTURAL DRAWINGS THAT ARE <br />INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS. <br />7. COORDINATE LOCATION OF ROOF MOUNTED HVAC EQUIPMENT AND ROOF PENETRATIONS WITH THE <br />ARCHITECTURAL AND STRUCTURAL DRAWINGS. <br />8. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) DUCTWORK AND <br />HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. REPLACE INSULATION THAT HAS <br />BECOME WET AT ANY TIME DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. <br />SEAL ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM <br />CEILING/RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING <br />COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED <br />DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO TURNING <br />SYSTEM OVER TO THE OWNER. THE INTERNAL SURFACES AND ASSOCIATED COILS OF ANY HVAC UNITS <br />THAT WERE OPERATED SHALL ALSO BE CLEANED. <br />9. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN <br />OR NOTED. <br />10. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SHALL BE FASTENED <br />TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS TO THE ABOVE FLOOR <br />SLAB OR ROOF EXCEPT WHERE CONCRETE INSERTS IN CONCRETE SLABS ARE ALLOWED BY THE <br />SPECIFICATIONS. <br />11. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS <br />PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER REPLACEMENT. <br />12. DRAIN, FLUSH, AND REFILL ALL PIPING SYSTEMS NECESSARY TO PERFORM THE WORK. REFERENCE <br />SPECIFICATIONS FOR FLUSHING PERFORMANCE REQUIREMENTS AND SUBMIT FLUSHING PLAN TO <br />ENGINEER FOR REVIEW. PROVIDE CHEMICAL TREATMENT FOR ALL PIPING SYSTEMS AFTER FLUSHING <br />AND REFILLING THE SYSTEM. <br />13. LOCATE AND SET THERMOSTATS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT LOCATIONS WITH <br />ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES WITH TOP OF DEVICE AT MAXIMUM 48' AFF TO <br />MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. PROVIDE INSULATED BACKING FOR <br />THERMOSTATS MOUNTED ON EXTERIOR BUILDING WALLS. INSTALL WIRING IN CONDUIT PROVIDED BY <br />DIVISION 26. AT A MINIMUM, PROVIDE CONDUIT IN THE WALL FROM THE JUNCTION BOX TO W ABOVE <br />THE CEILING. <br />14. REFER TO SPECIFICATIONS FOR DUCTWORK AND PIPING INSULATION REQUIREMENTS. DUCT SIZES ON <br />MEC I WICAL PLANS INDICATE CLEAR INSIDE AIRFLOW DIMENSIONS, INCREASE SHEET METAL SIZES <br />ACCORDINGLY TO ACCOUNT FOR THXW4ESS OF DUCT LINER. <br />COMISSIONING <br />PROJECT C0991IIIIISSIDNNG NEGUN2311INIITf SMALL CONFORM TO SECTION C4MM <br />OF THE MI MOLSfMfiTON STATE NONaIESIDENTYII ENERGY CODE THESE <br />REOUNNEIkIIIENTS INCLUDE. BUT ARE NOT L1rTED TO A C09YSSM)NING PLAN, <br />PRELINIIINRY COMMSSONNO REPORT, FINAL C09YSS101010 REPORT. AND <br />ACCEPTANCE AND SUPPORTING DOCUMENT& N ADDITION. PROVIDE SYST NI <br />OPERATIONAL TRAINING. OM MANUALS, AO RECORD DR/W9N0S TO THE <br />OMMER PER TE MI MASIIll TOM STATE NOI4REI DE NTIAL ENERGY CODE <br />MECHANICAL SYMBOLS <br />THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED. V2.03 <br />STANDARD MOUNTING HEIGHTS <br />HVAC DUCTWORK AND ACCESSORIES <br />PIPING SYMBOLS <br />PIPING LINETYPES <br />THERMOSTATS (USER ADJUSTABLE) (TOP OF DEVICE) 4B- <br />CONTROLS (TOP OF DEVICE) 46' <br />x, DUCTNIORK*OUPIENT TO BE REMOVED OR RELOCATED <br />Ex*TNG DUCIWORKIEOUIPMENT TO REMAIN <br />DHEIJt BLOT ORTI3ER� <br />INSULATED FLEXIBLE DUCT (MAX. 5'O' LONG) <br />��....yy <br />MOH DUCT WITH 46' RECTANGLE -ROUND BRANCH FITTING AND <br />66W AL VOLUME DAMPER <br />----- 0- DIRECTION OF FLOW <br />CONTROL VALVE <br />THEE -WAY CONTROL VALVE <br />SHUTOFF VALVE <br />�\~ CHECK VALVE <br />64BALANCING VALVE WITH PRESSURE PORTS <br />------S4- TRIPLE DUTY VALVE WITH PRESSURE PORTS <br />EXISTING PIPING TO BE REMOVED OR RELOCATED <br />EXISTING PIPING TO REMAIN <br />-CDH- CONDENSATE DRAIN - HIGH EFFICIENCY RTU (CDH) <br />-CD CONDENSATE DRAIN (CD) <br />ACID AUXILIARY CONDENSATE GRAIN (ACD) <br />- NPW - NON POTABLE WATER (NPW) <br />G NATURAL GAS IG) <br />NSTALL DEVICES AT THE MOUNTING HEIGHTS SHOWN ABOVE UNO IN THE CONSTRUCTION <br />DOCUMENTS. MOUNTING HEIGHTS LISTED ABOVE OR ELSEWHERE IN THE CONSTRUCTION <br />DOCUMENTS ARE AFF OR AFG TO BOTTOM OF DEVICE UNO. ALL DEVICES SHALL BE <br />INSTALLED W COMPLIANCE WITH CURRENT ADA AND LOCAL REQUIREMENTS. <br />ATI ON <br />O MECHANICAL OR FIRE PROTECTION PLAIN NOTE CALOUT <br />CU MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR PROVIDED <br />1 UNO) <br />CONNECTION POINT OF NEW WORK TO EXISTING <br />ELBOW WITH TURNING VANES <br />- 1� STRAINER <br />~ STRAINER WITH SLOWOFF <br />- --G- - - NATURAL GAS ON ROOF (G) <br />-MPG - MEDIUM PRESSURE NATL. GAS (MPG) <br />1 REFERENCE <br />DETAIL UPPER UMBER INDICATES DETAIL NUMBER <br />M 1 LOWER NUMBER INDICATES SHEET NUMBER <br />1 <br />SECTION CUT DESIGNATION <br />BRANCH DUCT WITH BELLNOUTM FITTING 6 MANUAL VOLUME <br />CONTROL DAMPER <br />Y IV 11�1 EXHAUST, GREASE EXHAUST, OR SPECIAL EXHAUST AIR DUCT UP <br />+���+ <br />1 A EXHAUST. GREASE EXHAUST, OR SPECIAL EXHAUST AIR DUCT DOWN <br />'� RETURN AIR DUCT UP <br />`I RETURN AIR DUCT DOWN <br />SUPPLY AIR OR OUTSIDE AIR DUCT UP <br />1 SUPPLY AIR OR OUTSIDE AIR DUCT DOWN <br />T RELIEFISAFETV VALVE <br />IIIIII SOLENOID VALVE <br />PRESSURE REDUCING VALVE <br />GAS PRESSURE REGULATOR <br />THERMOSTATIC MIXING VALVE <br />M <br />PIPE ANCHOR <br />C=-J- EXPANSION JOINT <br />f PPE GUIDE <br />PPIN SUPPORT <br />0 F A T TRAP <br />0 BUCKET TRAP <br />- - MPG- - MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG) <br />-FOSS FUEL OIL SUPPLY (FOS) <br />-FOR- FUEL OIL RETURN (FOR) <br />-FOV- FUEL OIL VENT(FOV) <br />LPG - LIO)IFIED PETROLEUM GAS (LPG) <br />-BFW- BOILER FEED WATER(BFIM <br />- HPS - HIGH PRESSURE STEAM SUPPLY (HPS) <br />- HPC - HIGH PRESSURE STEAM CONDENSATE HPC <br />1 ) <br />- LPS - LOW PRESSURE STEAM SUPPLY (LPS) <br />- -LPC- - LOW PRESSURE STEAM CONDENSATE (LPC) <br />-PD CONDENSATE PUMP DISCHARGE (PD) <br />AWEVFFF���+----- <br />NATIONS <br />MC AlR CONDITIONING <br />ACC AIR COOLED CHILLER <br />ACCU AIR COOLED CONDENSING UNIT <br />AFC ABOVE FINISHED CEILING <br />AFF ABOVE FINISHED FLOOR <br />AFG ABOVE FINISHED GRADE <br />A14J AUTHORITY HAVING JURISDICTION <br />AMU AIR HANDLING UNIT <br />Al ANALOG INPUT <br />AO ANALOG OUTPUT <br />AP ACCESS PANEL <br />APO AIR PRESSURE DROP <br />HOA HANOOFF-AUTOMATIC <br />HP HORSEPOWER <br />HTG HEATING <br />MVP HEATING HOT WATER PUMP <br />FI1V$JR HEATING MOT WATER SUPPLY/ <br />RETURN <br />W WC INCHES OF WATER COLUMN <br />L LOUVER <br />LAT LEAVING AIR TEMPERATURE <br />LDS LEAVING DRY BULB <br />LP LOW PRESSURE <br />LWS LEAVING WET BULB <br />AWG AMERICAN WIRE GAUGE <br />B BOILER <br />BAS BUILDING AUTOMATION SYSTEM <br />BB BACKBONE <br />LWT LEAVING WATER TEMPERATURE <br />MAU MAKE-UP AIR UNIT <br />MAX MAXIMUM <br />MBI 1000 BTU PER HOUR <br />EQIP6EM WITH FLEXIBLE DUCT CONNECTION <br />�THERMOSTATIC TRAP <br />� <br />SACKFLOW PREVENTER <br />-HMS- HEATING HOT WATER SUPPLY (HMS) <br />- H WR- HEATING HOT WATER RETURN ffWR) <br />BO BACKD AFT DAMPER <br />BD BLOVNDOWN ONH <br />BFC BELOW FINISHED CEILING <br />BFF BELOW FINISHED FLOOR <br />LAD MOTORIZED DAMPER <br />NFR MANUFACTURER <br />MIN MINIMUM <br />NIA NOT APPLICABLE <br />10' PECK SIZE) <br />Cgpl(TYPE) <br />]Op CFy CFM OF SUPPLY DIFFUSER OR REGISTER) <br />( ) <br />• PRESSURE GAUGE <br />E THERMOMETER <br />- CHINS - CHILLED WATER SUPPLY (CHINS) <br />- CHWR - CHILLED WATER RETURN (CHAIR) <br />BFG BELOW FINISHED GRADE <br />BFP BOILER FEED PUMP <br />NIC NORMALLY CLOSED <br />NIO NORMALLY OPEN <br />241Q4 (SIZE) <br />� PRESSURE AND TEMPERATURE TEST PLUG <br />— HGS- HOTMJSLLED WATER SUPPLY (HCS) <br />BHP BRAKE HORSEPOWER <br />BI BINARY INPUT <br />BO BINARY OUTPUT <br />BOD BOTTOM OF DUCT <br />BON BACK OF HOUSE <br />NOM NOMINAL <br />NC NOSE CRITERIA <br />NF NOT IN COD <br />NIC NOT W CONTRACT <br />OA OUTSIDE AIR <br />CEC I (TYPE) <br />� Nlq CFM (CFM OF EX/MUST GRILLE) <br />MAMMAL VOLUME DAMPER <br />�-�}� UNION <br />�.{� FEE CONNECTION <br />- HCR - HOT/GSLLED WATER RETURN (NCR) <br />-CWS- CONDENSER WATER SUPPLY CWS <br />1 ) <br />SOS BOTTOM OF STRUCTURE <br />BTU BRITISH THERMAL UNIT <br />CFM CUBIC FEET PER MINUTE <br />CH CHILLER <br />CHWSlR CHILLED WATER SUPPLV6RENRN <br />CLG COOLING <br />PICV PRESSURE INDEPENDENT <br />CONTROL VALVE <br />PROVIDE FURNISH AND INSTALL <br />OTV QUANTITY <br />RA RETURN AIR <br />RC ROOM CRITERIA <br />I� <br />SQUARE TO RDIDTRANSITION <br />!'� <br />RDA <br />�� DUCT MOUNTED SMOKE DETECTOR (50=SUPPLYmD=RETURN) <br />VACUUM RELIEF VALVE <br />4 AY AUTOMATIC AIR VENT <br />bM/V MANUAL AIR VENT <br />'-' <br />N'1 <br />-CWR- CONDENSER WATER RETURN (CWR) <br />- HPWS - HEAT PUMP WATER SUPPLY (HPWS) <br />- - HPWR - - HEAT PUMP WATER RETURN (MPWR) <br />CP CONDENSATE PUMP <br />CPT CONTROL POWER TRANSFORMER <br />CRAC COMPUTER ROOM AIR <br />CONDITIONING UNIT <br />RD RETURN DUCT <br />REA RELIEF AIR <br />RF RETURN FAN <br />RFR REFRIGERANT <br />R �91QNAT70N <br />O <br />FD FINE DAMPER <br />4 PRESSURE I VACUUM SWITCH <br />CLEANOUT <br />GP <br />RL REFRIGERANT LIQUID (RL) <br />-RD- REFRIGERANT DISCHARGE (HOT GAS) (RD) <br />-RS REFRIGERANT SUCTION (RS) <br />CRU COMPUTER ROOM UNIT <br />CT COOLING TOWER <br />CV CONTROL VALVE <br />CWP CONDENSER WATER PUMP <br />CWSIR CONDENSER WATER SUPPLY/ <br />RH RELATIVE HUMIDITY <br />RN ROOF MOOD <br />RPM REVOLUTIONS PER MINUTE <br />RTU ROOFTOP UNIT <br />SA SUPPLY AIR <br />FM FIE SMOKE DAMPER <br />SD SMOKE ONffR <br />�D ELBOW UP <br />- ELBOW DOWN <br />�RDB- REFRIGERANT DISCHARGE BYPASS ROB <br />(ROB) <br />ARV REFRIGERANT VENT (RV)+ <br />RETURN <br />CU CONDENSING UNIT <br />CHWP CHILLED WATER PUMP <br />DB DECIBELS <br />DBA A -WEIGHTED DECIBELS <br />SCP STEAM CONDENSATE PUMP <br />SD SMOKE DINT DETECTOR <br />SO SUPPLY DUCT <br />SF SUPPLY FAN <br />SH SENSIBLE HEAT CAPACITY <br />VO VOLUME DAMPER <br />O <br />MU MOTORIZED DAMPER <br />- TEE UP <br />�� LEE DOWN <br />DOC DIRECT DIGITAL CONTROL <br />DI DIGITAL INPUT <br />SOW SCOPE OF WORK <br />SP STATIC PRESSURE <br />ST STEAM TRAP <br />BD BACXDRAF-T D. <br />rQ g)OW UP WITH SHUT-OFF VALVE (SOU) <br />�� ELBOW DOWN WITH SMUT -OFF VALVE (SOV) <br />DISC DISCONNECT <br />ON DOWN <br />DS DUCT SILENCER <br />STN STEAM <br />TBO TO BE DETERMINED <br />8 TEE LIP WITH SHUT-OFF VALVE (SOY) <br />DX DIRECT EXPANSION <br />(E) EXISTING <br />EA EXHAUST AIR <br />EAT ENTERING AIR TEMPERATURE <br />TC_ TEMPERATURE CONTROLS <br />CONTRACTOR <br />TCP TEMPERATURE CONTROL PANEL <br />TF TRANSFER FAN <br />TFA TO FLOOR <br />; TEE DOWN WITH SHUT-OFF VALVE (SOY) <br />REDUCER <br />ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. REFER TO <br />DUCTWORK SPEGFIGTIONS FOR DUCTWORK INSULATION AND LINER INFORMATION. <br />ED EXHAUST DUCT <br />EDB ENTERING DRY BULB <br />EF EXHAUST FAN <br />EFF EFFICIENCY <br />EMS ENERGY MANAGEMENT SYSTEM <br />ESP EXTERNAL STATIC PRESSURE <br />ABOVE <br />TFB TO FLOOR BELOW <br />TH TOTAL HEAT CAPACITY <br />TSP TOTAL STATIC PRESSURE <br />TT TEMPERATURE TRANSMITTER <br />TYP TYPICAL <br />RECIOIXAATION PUMP <br />so <br />—_ P-TRAP <br />NGAS COCK <br />HVACCONTROLDEVICES <br />ETR EXISTING TO REMAIN <br />EWB ENTERINGWET BULB <br />EWT ENTERING WATER TEMPERATURE <br />UIF UNDERFLOOR <br />UK; UNDERGROUND <br />UIS UNDERSLAS <br />O HUMIDISTAT <br />OT THERMOSTAT <br />�— rovBEAMCIAMP <br />S TRAPEZE HANGER <br />LINETYPELEGEND <br />THROUGHOUT THE DRAWINGS DIFFERENT LINE -TYPES ARE USED IN COMBINATION WITH <br />THE SYMBOL$ TO INDICATE THE STATUS OF ITEM$ AS EXISTING, TO BE DEMOLISHED, TO <br />FCU FAN COIL UNIT <br />FFA FROM FLOOR ABOVE <br />UN UNIT HEATER <br />UNO UNLESS NOTED OTHERWISE <br />® CARBON MONOXIDE SENSOR <br />FFB FROM FLOOR BELOW <br />FF FINISHED FLOOR <br />FOH FRONT OF HOUSE <br />FP FINS PER INCH <br />VAV VARIABLE AIR VOLUME <br />VEL VELOCITY <br />VFD VARIABLE FREQUENCY DRIVE <br />V <br />VRF VARIABLE REFRIGERANT FLOW <br />® CARBON DIOXIDE SENSOR <br />DIFFERENTIAL PRESSURE SENSOR <br />BE INCLUDED AS PART OF NEW WORK AND/OR ITEMS WHICH ARE ANTICIPATED TO BE <br />PROVIDED W THE FUTURE. THE STATUS OF ITEMS USING THESE LINETYPES ARE RELATIVE <br />TO THE VIEW IN WHICH THEY APPEAR. PHASING SHOWN IN DRAWINGS IS NOT INTENDED <br />FPM FEET PER MINUTE <br />GC GENERAL CONTRACTOR <br />WITH <br />WXX WITHOUT <br />WB WET BULB <br />FSI FLOW SWITCH <br />TO FULLY DESCRIBE ALL NECESSARY CONSTRUCTION PHASING. WHICH IS DETERMINED BY <br />THE CONTRACTOR AS PART OF THEW RESPONSIBILITIES. ANY SUCH PHASES DESCRIBED <br />IN THE CONSTRUCTION DOCUMENTS ARE GENERAL AND ONLY INTENDED TO INDICATE A <br />GEA GREASE EXHAUST AIR <br />GPM GALLONS PER MINUTE <br />WC WATER COLUMN <br />MS HUMIDITY SENSOR <br />BROAD ORDER FOR THE SAKE OF DESCRIBING THE PROJECT. THE FOLLOWING LINETYPES <br />MAY BE USED ON ANY DEVICE. EQUME, NOTE, LINE. SHAPE. ETC. <br />EQUIPMENT, <br />WATER PRESSURE DROP <br />XP EXPLOSION -PROOF <br />P© PULL STATION <br />$® STATIC PRESSURE <br />EXISTING <br />NEW <br />®DEMOLISH <br />TEMPERATURE SENSOR <br />FUTURE ________________ <br />CITY OF F-VE-REIT <br />FEB 10 2023 <br />CITY OF JL ;L <br />Permit #: <br />Site Address: <br />M2302-051 <br />10330 EVERGREEN WAY <br />permit servic <br />Owner: <br />S R KLEIN FISH -ON INVESTMENTS LLC <br />Tenant: <br />GLINT CAR WASH <br />App. Date: <br />2/10/2023 <br />Proposed Use: <br />COMMERCIAL MECHANICAL (PLAN REVIEW <br />REQUIRED) <br />Description: <br />INSTALL VENTILATION FOR VACUUM <br />EQUIPMENT KIOSK <br />Reviewed By: <br />_ Date:4_�_ <br />V/Office Set Job Site Set <br />RHENDERSON <br />ENiMNEER. <br />&US U NEXA DRIVE. STATE 300 <br />LEKEA/L KS U214 <br />TEL 913.742.WW FAA 913.742.S001 <br />wwwJE46MONOW0@R&COY <br />2150=51 <br />WA CORPORATE N UME R 1754 <br />0&= <br />V) <br />W <br />"ss <br />W <br />n <br />.N <br />W <br />d' <br />DRAWN: TY <br />CHECK: JNH <br />JOB NO: 20-020 <br />VO <br />i <br />U� � <br />� z w <br />} W 0 ; c� <br />�� <br />111 <br />v�3 w <br />WW <br />W <br />lu J o <br />Z <br />� UC p z = <br />—� U <br />� 0� W <br />09ul � <br />SHEET: <br />MO <br />OF: — SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.