Laserfiche WebLink
N <br />w <br />O <br />6 <br />m <br />Division 23: HEATING, VENTILATING. AND AIR CONDITIONING <br />1. GENERAL INSTRUCTIONS <br />A. GENERAL REQUIREMENTS <br />NI requiremmls uder Divisiwh 01 and the general and supplementary CArdib orbs of these speaficaaone apply to this xttion <br />and diw'sian. Where de requirements d Ws section and daalpn ex ceed Bose of Divoion 01. Nis section od division lake <br />precedence. Became thoroughly familiar with a1 is conlenta a , b requirements that affect this division section, or both. Work <br />required under the division 'inludes all material, equipment appl arees. trer sporlalan, services, and labor required to <br />mrpete tho enbm system as requaed by the dmwngs and spe dcabwn. a reasonably inferred to be necessary to fawitate <br />t e funt]lon d each system w implied by the desgn and the equipment speci <br />The speoMatlons and drawings for the poled are wmplemarcary, and any portion of work desc abed In ore shill be provded <br />as f described n both. In the event of discrepancies. ratify the Engineer and request dadficabon prior b proceeding wth the <br />work Invoked. <br />Drawings am graphic repasemabo s of die work upon wtnidh the contract Is based. They stow the materals and their <br />relationship W one awher. indudrg sizes, stapes, breams, aid earhoct rs, They convey Me scope d work indicating the <br />intended general amargerrerit of ties systems without snowrg a1 d the exact detail as W elevations, offxls, control noes. <br />and otter rstaeabm nequirenenb. Ilse de drawings as a guide avian Laying out ore work and lc verily that material and <br />equipment will fit into the desigrated spaces. and with wen installed per mamfaduers' requrement , w e ensure a <br />complete, coordinated, Satisfactory, and Property operating system <br />B. DEFINITIONS <br />Drwsion Referent wsaired n Nis specification fobw the numbering system defined n the Co isNotion Speciataaoins <br />impt to (CSI) MesterFomnal 2004 Edition Specification Drvsims 01 through 13 provided with the project may reference the <br />CSI MasterFormat 1995 Edson. The correspo ding division resonances between Me 2004 Editor, and 1995 Edban am as <br />follows: <br />2004 Edison 1995 Union <br />1. Dmson 21 - Fie Suppression Division 15 <br />2 Dmson 22 - Plumbing Division 15 <br />3 Dmaion 23 - HVAC Dhision 15 <br />4 Diviaon 26 - Electrical Division 16 <br />5. Dmalon 27 - Communications Division 16 <br />6. Dwspn 28 - Electra- Safety and Secny DMson 16 <br />Furnish:'to supply acid deliver to the project sal, ready for unloading unpacking, assembly, min labors and srmrla <br />operations' <br />bbaan b perform all operations d the project vita rikudng, but not Inxed to. the actual unloedrtg, unpadahg, assembling, <br />erecting, placing. anchoring, applying, worMrtg W dimension, finishing, ourkg, protecting, ceeang. testing, conrrrmss snag, <br />slating up and similar operations, eonplete. and mady for the Mended tse' <br />ProWe:'W furnish and nstal.' <br />Furnished by owner (or Owner -Furnished) or FumisnN by Others:'m item furnished by he Owrer or uder other divisions <br />or Contracts, and Mtalled under he requirements of his dmsion, compete and ready for intended use, n4ding as mems and <br />aensces incidental W the work rheosssary for proper instalamn and operamn. Intrude the mStallato i under fie wemnty <br />required by this division.' <br />Engineer Where refers ced in thin ddson, 'Ergrteer a the Ergrteer of Record and the Desgn Professional for the work <br />under thus dmsen. and et a Consultant to, and an eWhonzed rrprexnbUVe of the Archtect as defned n Nit General ardor <br />Supplementary Conddbns. When used 'n tors division. Ergneer meth increased kmolvement by ad obllg3tlora to thr <br />Engi eer. in addition W nvolvarent by and oblgatons W the Ardhred. <br />AHJ: Tine Loral code andb'msPecam agenry (Auporry) Having Jurisdreui over the wool. <br />NRTL'. NationaNy recognized tesmhg Laboratory, as defined and listed by OSHA in 29 CFR 1910.7 (e.g . UL, ETL, CSA), and <br />acceptable W to AHJ owe Vas prgxt Nab -,ally recognized testing eboralpra and standards listed ore used only W <br />represent he dbraderlVcs required and am not me ded to restrict he use of War NRTLs tat are acceptable to he AHJ <br />and standards Vat meat to Wedged ciserfe <br />SubsaaA-t: Charges n products. materials, equipment and methods d wsuucbm from hose required by he Coned <br />Documenls and proposed by Contractor. Subsauaps include Value Engneerkng proposals. <br />1. SuDSVWtons for Cause Changes proposed by Contractor the am rupMed due W charged Projac condtiors; such as <br />unavaebdy of podu ct. regula try c urged, or Unavaiabiy of required womaty tams. <br />2. Su lea ibo s for Convenient : Chages proposed by Contractor a Owner hat ore not required n order to meet over <br />Project mquaereha ba relay Wer advantage b Cont Yor or Owner. <br />The tenm'approved equar.'equr aehr, or'equar ore used synorynpusly and stun Man'accepled by or acceptable to the <br />Engarer as equivalent to the arm m manufacturer spedfbd'. Tlhe term'appowC shall mean Labeled. listed, or both. by an <br />NRTL ad accepable to the AHJ over this project. <br />C. PREBID SITE VISIT <br />Prior to Submseng bid. visit he site d the proposed work and become fry informed w W the wdition ; under wwh th wor k <br />is W be done. Failre W Comply win he requirement shall not be considered sufficient lustifitabon W request or obtan extra <br />D. MATERIAL AND WORKMANSHIP <br />Provide new means. equa merit ad apparatus uder the contract unless dhawse stated heron, d beat qualy normally <br />wee for the purpose n good commercial practice, ad foe from defects, nsal material and equipment in accordance win <br />the mrenufadumrs installation irstr lions. Model numbers listed in the specirtdns or drown on the dmwinga are nor <br />medessany aaaded W desyaa the mquwed rim, vriten descrpions of the trim govern ntedel numbers <br />Pipe, pipe fiings. pipe sped ill and vishes shag be man fattured in plants located n the Unled States or certified to meet <br />the spe ifed ASTM ad ANSI Stu •. <br />Work perbmed under this contract shall provide a rest and workmanlike appearance wen Completed. W the satisfaction c <br />the Arched and Engineer. W-rmanship snail be the finest possible by experienced mhechanics. Mstsdatnnns shall mrpy <br />with applicable codes and laws. <br />The complete stakatbn shorn fu Lm as designee and intended wN respect b emdency. capacity ndx Level. etc. <br />Abn-mhal rase caused by mmag equipmnent. Pprg. ducts. air devices, and squeaks n roaring corponmts sag not be <br />acceptable. Materials ad equ,pi rent Nall be of com ercial sprdnration grade n qualy. Lght duty and reswmtia grade <br />equipment shah not be accepted ur l- otr- kditated. <br />Repo or replace pubs: and pwoe properly damaged as a result of won perfor ed uder teas contract to the satisfacton of <br />auMonws and regulations having jurodidwri Proved saey lights. guards. and vam ul signs required for he pen -hone <br />of tho won and for to safety of Ve Pblic <br />E. MANUFACTURERS <br />In Gdw articles whore lists of ma-lacuren are invoduced, subject to conpance with requrements, provide producs by one <br />Where a let a Provided, manufacturers are bsed alphabeticaly and mt rn accordance wbh any renkng a pref rence <br />Wleme man factiaas are cot listed, provide products subject W c-ph nce wth requirements from manufacturers that have <br />teen actively involved In manufarnaing M specified product for no lass than 5 years <br />F. COORDINATION <br />dw available spec . and wig show paper service access to these items requiring maintenance Comporhon a wadi ae <br />imr aged without regard to the above Mal be rebated at no additional cost W the Owe, <br />Unless otherw i a ndioted, t e General Contractor shall provide chases and oper i gs n wilding constrWon requred a <br />iretallaton a the systems Specrned herein. Contractor alai omen the General Contractor with nfmnatlon whore chase <br />openings are required. Contractor sal keep nforned as W to work of other trades agaged in Nor co str uctio , of the p <br />ad call execue work m a rear ror as W not mfaf with or delay Nit work of otter trades. <br />Figured di ensio s sell be taken an preferen a to scab damensio s. Contractor sell hake hi win meawrarenb at the <br />budding. es vanatons may owe. Cat to gag be held responsible fa enas that could have been awfded by popes <br />Provide materials wed Inn, thhat wie prperty fit fine types of cohrg, wad. or fiw finishes actualy nstaaed. Mod., numbers <br />listed in tr apeciarims or shown on the dmwegs arc not intended W desgnae the requred rem <br />G. ORDINANCES AND CODES <br />Work parlor ed Uder tis contract shall. a a mwtimum. be n oerfomance wnt apprabW netMal, stets end Local codes <br />having juisdcton Equipment finished and associated estanation wad perfor ed under ths compact shot be n Snd <br />compliaan a wrM cimem applicable codes adopted by the local AHJ. ncluding any amendne is and standards as set form by <br />4. Occ paaonal Safety and Keeah Adminlstrdnn (OSHA) <br />5. Amecan Sociey of Mechanical Engineers (ASME) <br />6. Amman Society of Heating. Rehigeralkg, and Air Cordipning Engineers (ASHRAE) <br />7. Amatan N.b..W Standards kstitue (ANSI) <br />8. American Society d To"and Material (ASTM) <br />9. Other national standards and codes were applicable. <br />Whom to contract documents exceed the mclukenens tithe referenced codes, standards, etc, ore contract documents <br />shall take fiecedance. Where conncts between venous code. ordiwcn, Min. and reguetiomn exist, comply with the most <br />Pr-rptly bag ad conflicts mxrvedd between codes, ordimances. mules. regulati-a, refereced dmdaw, ad these <br />documents to lbe aamam of t e Architect and EngireM for final resolution. Cmmcuxr win be held responshible for ary <br />elation of tie Law. <br />Procure and pay fa permits and licers ss required for ad, 3Cwmgishmem of the oak herein de rbed W om required, <br />obtain, pay for, ad it~ certificates of nspedbn to Over. <br />H. PROTECTION OF EQUIPMENT AND MATERIALS <br />Sore and poled from damage equiprteru and m atafals delivered to job Site. For malenao and equipent wscep ide W <br />cis artg'rg weather wditi-n, darpess. or tertpe ature variab-s. store inside n wditiored spaces. For meters and <br />equipment rot susceptible W hex 0mickb-s. cow with waterproof, tea-mgsua. heavy tarp or pdyethywene past c as <br />required b protect from plaster. dal dirt part water. or physical dam ga. Repxe i suaam Nat Its became wet at my <br />tine doing const idlon. Drying the tosuatm l nor acceptable. Sea a y team or joints d internal fiberglass rhscatlon. <br />Equipment and meedd damaged by dmavudior acevides Mug be rejected and Contractor sal furnish new equ4nrnt and <br />material of a Ike kind at his own ehpen e. <br />Keep premises broom dean of foregn material seated dueg work perlorned under this contract. Piping, equpnhene, etc. <br />soh have a real and dean appearance a ore trrranaaon of the work. Remove debt from ceifirghetum air plenum, <br />incuding dust. <br />Pug, Seal, or cap open ends d ductwork ad piping sysems wfhile stored ad installed Burg costt tiro when not rn use to <br />prevent oho entrance d debris into he systems. Remove temporary proecion prior W starbg equipment and turning Nor <br />system over to t e olrha. <br />I. SUBSTITUTIONS <br />Material, products. equipment and systems described n Ithe Bidding Documents esuaNuh a standard d mourned function. <br />dmextaxi appearance and quality to be met by the proposed SubsduAon, The base led shall'nclude only the products from <br />marxfacoaers specifically named in the drawings and speafiralions. To request a subwlutnon. request the Substittution <br />Request Form from to Areufect or Engineer. Complete and send tie Subsdtution Request Form for each material, product. <br />equipment or system that'll proposed to be substituted The burden of prod of the meth of he proposed Substitution a upon <br />the proposer. <br />Union stated otlenWe in vrldg to fie Engineer by the Contractor, Contractor warrants to me Engineer, Architect, and <br />Owner the tolowrg: <br />1. Proposed substitution has been fly investigated and delerrimed W meet a exceed the specified Work in ad respects <br />uhfew stated otherwise n oho substitution request <br />2. Proposed subsmution is consent wth the Contract Duwmmls and win produce nd,cated results, including functional <br />clearances. maintenance service, and soumkg of replacement parts. <br />3. Propnxd substitution has received necessary approvals of authorities having)-editlion. <br />4. Same w o only wl be Unrehed for proposed substitution as for specified Work. <br />5. t accepted subsdbaion lads W perform as required. Contractor shad replace wbatit to material or system with that <br />signally sp9i and bear costs icured thereby. <br />6. Coon inabfon, nstagatd, and charges n the Work as redesxry for accepted subs WW will be cortpete in an <br />respects <br />No subsatutbns tvi be considered unless t e SubsNution, Request I -, s competed see att led wh Nit appropriate <br />substitution documentation. No stbstnutort ill® be oortsldered prkX to receipt of bids union written request for approval to be <br />has been received by Ne Engineer a least ten t 10) calaear days prier W the date for receipt d bids. <br />ff the proposed subsduticn i9 approved prof W receipt of bids, Such approval will be stated n an addendum. Blddas shag not <br />rely upon approvals made n any odor way. Verbal appoval will not be given. No Substitutions vs be considered afar the <br />J. SUBMITTALS <br />Assemble and Subnt for review step drawings, material ford, manofadurer product keraure for equipment W be fumshed. <br />and items requiring coordination between wea to s under this wiad, Provide sumndbls n sufficient detail se as b <br />demonstrate compliance wed these control documents and fine design concept Prior W tratsmring wbndal, veay tat to <br />ezoprent submitted a m oody compatible and suitable br the mended use, will fit the avolabe space, and maintain <br />mannlactaer rerommerded service cleaances. ff to size of equipment WrNshed makes necessary any change n location or <br />configuration, submit a shop drawsig shwnhg to proposed layout. <br />Transmit Submittal as early as requred W support Nor project sdedule. Allow for two weeks Engineer review time- plus <br />Idiom mailing time via the Architect pus a duplication of thls tine M resubmna, 0 requred. Ony resubmit toss sedans <br />Su mittals shorn contain the project name. applicable Specification section. Submial date, equipment ddenufiatio i aoarym es <br />used on tie drawings, and the Convectors camp. The stamp shad adty tat the Submittal has been decked by the <br />Contra tor, complies with the drawings and specifications. and ls coordinated with oter trades. Manufactrer product nteratue <br />shah i crude shop drawings, product data, performance sheets. samples and other submitas required by tthis drm- <br />Highlight mark first or indicate M materials. pmformaca afteria. and socawore3 Nat are being proposed. G-wal product <br />caubg data rei specJrlly noted b be pan of t e specified product wn be rejected and returned wthcut review. <br />Sub itals and shop drawbgs shall nor contain the firm name, boo. seal. or wgralt ore of the Engineer. They shad rot be <br />copes of he work product of to Engieer. If to Contractor deues to we elements d such producL refor to paragraph <br />'Eleco one Drawing Files' for procedures W be used <br />Separate wbnitals according to adlvdual specification saloons. megible supmtted will be rejected and retuurned without <br />review. Catalog data shall be property bound. identified, I flexed and tabbed n a 3.in9 bride. Each rem w model number <br />shag be dead marked and accessories ndcaled Label did caabg data with the equipment identfcaaon acronym or number <br />include snort circut c urent ratings. Mark out inapplicable rams Shop drawings win be returned without review 4 he above <br />mm6o ed requirements are not net <br />Provide to quantity d Subrtittals required by Dmaon 01. ff not adicaed and hadcopy sas am provided, subn4 a minim. <br />of Sx (6) copies. Refer W Division U1 for ac eptance d eledror is subnitals b tors project For ebdronic submittal. <br />Contractor shah Submit this documents in eccordarie with tie procedures specified in Onfoon 01. Contracor shal notify he <br />sent by shag, Contractor sal copy the designated represontalivrs of tie Arched and Ergeea. Contractor shad slow for <br />dre Engarer review tarn as specified above in the const ction, scedule. Contractor shall submit only the docu eats required <br />W prchase the materials andor equipment n the eldion is 6ulorm ul. <br />The clhec irg and subsequent acceptance d su malls by tore Engeea amum Ardued sag roll releve tne Contactor torn <br />responsibkty for aeviaoors fan the drawings and ape ifira tons. mo s n dmmoord, stab. size a members. m qualities. <br />sots d wnponentts or tmkgs: mNinaen d elerrai requirements: and not wxd-mg Items with actual buildng <br />oor4dwm and adjacent work Proceed with he p ocurenent and insulation of equipment ony site receiv irg approved shop <br />K. ELECTRONIC DRAWING FILES <br />n prep raton of shop drownigs or m.ord aawrgs, Contractor may, at his option. oban electronic drawng files n AutoCAD <br />a OXF former on CD-ROM disk. DVD disk, flash drive a *red download, as dawned, tom the Enpreer for a shippi g and <br />hand6g fee d $200 br a drawing set up W 12 sheets and f 15 per sera for each sdd pa sheet Contact the An t cod for <br />writer authorvation and Engineer for the necessary moax agreemed form and W specify shipping method and drawng <br />forcer In addition W payment, tie wnten augodzaton from to Architect ad release aQeemenb form from Vr Engineer <br />must be received before electronic drawing Iles will be sera. <br />L. RECORD DRAWINGS (AS -BUILT DRAWINGS) <br />Dung progress d tho work in this division. Cmmco, shall Mm n an mourata record of ad charges made dung the <br />installation of fie system. Upon comp soon d the wok, aoavalely tansy at record Monnab on W twee idennal sets d Nor <br />approved sap drawahga bred one set iota ash copy d tre manual des-Eed below. <br />M. OPERATION AND MAINTENANCE INSTRUCTIONS <br />Wring the course d mrWudan. wood and wimple a complete bpehure of equprront furnishhed and installed on this <br />Project Include operational ad manenance khstructiorhe. manufacturers caakg sheds. weing diagram. fans lisle. <br />approved subnatah and shop drawings, wammtes. and desopbve Merature as fumase d by the equipment manufacturer. <br />Submit free copes of Neraure band n approved brders with Index ad tar Separating equupment types W the Architect, <br />for Engi eer's review, at t e tmnwub n d the work. Paper dips. suplus, rubber bands. orno-baf binding and mailing <br />envelopes are not oorisidered approved binders. Final approval d systems Intake urda has contract Mal be wNaeld until <br />this equipment brochure ls received and dearted oamplele by the Architect and Engineer. Instruct workmen to save required <br />Iteralure shipped with the equipment rash for inclusion n this brodwre. <br />Refer to Division 01 for acceptance of eleMomc manuals M this project For electronic manuals. refer W paragraph <br />'Submittals' for requirements. <br />N. SPARE PARTS <br />Furnish b Owner, with receip. tne folowing spare pass for the equipmere furnished br the proles: <br />I. One set of spare fixers d each type rewired br emir unit In addition to the spare set of filters. install new titers prior <br />to testing. adjusting. and balancing wok and before turning system owe W Owrher. <br />3. Furnish hoe operating keys for each type of ar ou lat and Irdet hat require them. <br />O. TRAINING <br />At alone mut ally agreed upon between the Owner and Conbacor, provide t e senses of a is " owned and aWorfzed <br />Provide training to intrude, but rot be linked W. an overview of the system ii equorma as lt relates W the Reality as a <br />wrote: oPxatbn and manlmance procedues and scedfes related b startup and shutdown, boubllghpobhg, ser Ac.V. <br />prmative mantenane, and appropriate operator ntervention: and review of data included n the operation and monteran <br />rta x ids. <br />Subma a certification letter W t e Arhitect standing that the Owners designated represmmave has been Gained as specifier <br />herein. Lester shag include date, tare. attendees and Subject of trarirhg. The Corador and ore Orel reprexnuave su <br />sign the oemfication leas adaamg agreement dal dho traaag has been provided. <br />P. WARRANTIES <br />Warrant each system and each elertent thereof against as defects due W edgy workmanship. design, or material for a Pefbd <br />of 12 months from date of Substantial Completi n. unless specific some ore noted W carry a kxger warany n the <br />cansnrction docments or martifaduMs standard war anty exceeds 12 mots. Remedy all defects, oxurnng within to <br />vamanly penod(s), as stated n to General Condakw and Dfvisfm 01. <br />Warnmries shall include labor and matenal. ind r1 g travel expenses Make repels w replaamaw wttkwt my additional <br />acts to the Owner, and W to ntsfacfon of the Owner, Ardnecl, and Engineer. <br />Perform the remedlat work promptly. upon wntler no6oe from the Engneer m Pvner. <br />At ore time of Substantial Completion, dell- W to Ower all warradies, n vmbng and Property executed. acJuding term <br />limits for waranties emwW,V beyond the one year period and my actions M Owner must take in order to maintain warranty <br />suns. Each warranty instrument shall be addressed to tine Owner and state the mmranartent dale and ton. <br />2. GENERAL MATERIALS AND INSTALLATION <br />A. BUILDING OPERATION <br />Carey with the sched le a opaat-n as promea in tw arc hitectu al poi of ws stedfiamn. Amomprs , w n, requnnq <br />Merruption of Withi g ooeraton at a tine when to building is nor in operation and only wild yahm approval of buadi g <br />Owner and/or tenant. Coordnae ntemxption of buikang operator wih Ne Peer andb toned a minimum of seven (7) days <br />in advance of work <br />B. EXISTING EQUIPMENT REUSE AND REMOVAL <br />Remove ae unused equlmend, dudwerk. piping. and associated supports. Cap dictw onk and Pprg at mans and cal er and <br />waa aged. <br />Prove sems of HVAC systems nodR am required because d Wadi g remodeWmg, as noted on the drewngs m necessary <br />for proper operation. Malh exisag materials ad contrucUorm tehniques wnen modifying exsahg systems unless specified <br />otherwise. Coorderae additional requimmm t, with General Co rector and Arched. <br />Seal ar Vht a dxbng duthprk required to be atado ed n place or rid n we a did ter i naam of the w rk. <br />Cap and seal wrahertight exsting rod curbs and rod op9nahge to be abandahod in pace as a re&A d equipment removal. <br />Clean and refrbish armting HVAC equipment Wended for roux es required b proper operators induing repimemem of <br />finer, bells, motors, retire Controls. and Safety interlocks. <br />C EXCAVATION AND BACKFILLING <br />Badcfil trer chin in maxmum 6 inh layers d wen -tamped dry earth n a manner W Prevent future seiement. <br />Excavation as spedfied herein shag be dwell as common excavation. Common excavation shalt comprise the sa isfiloory <br />removal and deposition d material of whatever substances and d every desaiptbn encountered, i cl ding rock, r any, wthin <br />the limits d tie wok as specified and shown on the drawings. Excavation slag be performed W Ina lines and grades intiated <br />on ore dmwrgs. Dispose of excavated material heal are wmdered unsuitable for wddin and surplus of excavated material <br />D. COINCIDENTAL DAMAGE <br />Raper streets, sfaewalo. drives. pavi g. walls. finishes. and offer faaLties damaged n tee course of ore work. Repair <br />Migrate shall math existing construction. Repair work star meet at requirements a the Ower, local authorities having <br />jurisdi Lion. and meet to xtisfadion of the ArdYtect. <br />E. CUTTING AND PATCHING <br />Conform W fie requirements n Division 01. Cut wall. Boors, celirgs, and other portions d the Wooly as required W rstall <br />work under INS divisimh. Obtan permisvun from ore Architect prior b drttin9. W not cut or disturb structural members without <br />prior approval tom ore Architect ad St uct ral Engineer. For post -tension Blebs. x-my slab ad closely modinate all core doll <br />local- wed Architect mid Structural Ergo er prior W performing arty work. Obtain appror d from Ardutect and Structural <br />Engineer for a1 ova dris and Pe d1mIdns at leas four days prior W perfonrang work. Penetrations Shal be made as small as <br />poorible whx mantainng requred clearances between the building elenae pe etrated and he system component Patch <br />around openings W match the adjacent construction ndudng fire ramps, a applicable. Repair and mfi ish mass disturbed by <br />work W to o ndbbn d adjoining Surfaces n a manrher xtsfacory to the Arc itect. <br />F. ROUGH -IN <br />Cooronate wahnca delay all roughing-m wN oaer dmswns. Conceal Piping, wdulL and rough-m except n unfn,shed areas <br />and where otaervnse sown <br />G. CONCRETE BASES <br />Provide concrete bases (e.g.. housekeeping pads) for equipment where I dicated on the drawings and as specified herein. <br />Concrete beseS shag have chamened edges. Size d base shall be a minarum of 4 Sides greater than the footprint d the <br />equipment Mal r a supporting ad shag have a mhmmum height of 3-12 inches. <br />Contact equpmatt bases of a mummam 28 day, 4000 psi whaete corrfpmrg b American Concrete Intrtue Standard <br />Buildrhg Cade for Reinforced Concrete (Act 318-99) and the latest appliable mmrmadaaas of tbe ACI Senoad Ixactae <br />manual. Concrete shad be composed d cement conkmirhg to ASTM C150 Type I, aggregate wdorn-V to ASTM C33, anti <br />potable water. Exposed estwor concrod Shen corn 5 b 7 percent ar eranment <br />Unless offerwax specified or shown w the structural drawangs, reinforce equipment bases and housekeeping pads with No. 4 <br />-r,-w g ban oonformkg to ASTM A615 or 6x6 - W2.9 x W2.9 webed wee mesh mdormrg W ASTM A195. Plane <br />reinforcing ban 24 races on center wed a minimum of two bars each direction <br />Provide galvanized anchor Dolts for equipmat paced on whcrete equipment bases and housekeeping pads or on concrete <br />slabs. Mho, boils sue. number ad placement anal be as recommended by the manufadurlr a the equipment. <br />H. STRUCTURALSUPPORT SYSTEMS <br />Structural Steel used for Support d equipment, ducbwk and dpng shall be rhea, dean, end wdorm W ASTM Dedgnatlon <br />A-36 <br />Support meehmucal comporeriM from the binding structure. Do not support mechanical compurents from celirgs, older <br />mi canal or elednal wnporents. ad other nor-snadural elements. <br />I. PRE-ENGINEERED ROOF EQUIPMENT SUPPORTS AND CURBS <br />Provide prelatncated equprrerr supp-t mas and root curbs manufachaed by AES IndwiMs Custom Curb. Inc.. Pale <br />Company, ThyOar or approved equal Provide wed fuly m tered rased rant and Sep to math roof insulation MidvhesS. <br />welded. mrkrMm 18 gauge gaNmazed steel shed. Hm1 y rek*Drced to bad bearing fawn of equipment berg supported. <br />tin 1-12 inch trclb 3 pourd rigid nsulaton 'neural W shed W maintain wdentuou8 roof nsutaton where required. <br />factory i stalled wood nailer, and minimum 18 gauge jacks with counternashir9 wthere equimmetm does not fury cover dr <br />equipment Support. Provide sloped roof •quiiPmeril Supports W enable le vet I suWti-h Provde rigid badnhg matend behi d <br />case W maintain cant slope Provide m tJdple support cods to uniformly support he equipment. Much to roof s -ture <br />according W manufacturers i stadepon rotructions, <br />Attach equipment directly W pre-engineered roof equipment Support wing oche d the following methods: <br />1. Rail Equipment Supports: Seoae each equimard support leg to the red with a minlmun a 4 pints of connection per <br />2 9 Rod Curbs: Secure each wrtrr a the equipment b the curb naaer using a mnor m o! 4 Leg soean, located abrhg <br />the origin d Ne equipment. Alternatively, Secure equipment W the curb using hold-0own brackets. Provide minimum 6 inch <br />1{ heira o it <br />king, gauge a shed Dnckats aced W wimp awnd top d tub end under equpmenl was ra with wffhcent <br />horizonal offset W hover overlap gap between the equipment moll and curb. Secure bracket to equipment and curb mailer uskg <br />a mommurn of a points of connection per bracket. Pmvde one bracket at each coma alo g the IwVdh of he unit. <br />J. ACCESS PANELS AND DOORS <br />Provde access doors for al concealed equment and duct and piprg accessones that require service were indicated or as <br />required, except w 1mrs above ly4r cegags. Access doors Shall be adequately sued for the devices served with a mrimum <br />ate of 18 inches x 18 rites. Access doors must be of Ve props constructor, for type of construction n which it ls stalled <br />Obtain Ar hfibi apprwa of type, size, locamn ad color before-dering Provide %cs ryfamhnted and assembled urea. <br />win ee wed atlachi rnl devic s and W ter- for irWallation Concealed h' Rush sceldrive led Cam lock <br />p ready s Zu open <br />and anchor wails. Provide access dogs maufacuured by Greerteck, Mikor. Tan. hm, a egkai. <br />K. PENETRATIONS <br />Provide sleeves b pipes passing Ovough above grade concrete W masony wars. condeta floor or rod saw. Sleeves <br />not requied for core dried holes o exismg masonry wens. concrete Moon w rods. Provide 1C gauge galvanized steel <br />sleeves for reeves 6 kches and smaller. Provide galvanized all metal sleeves b Larger than 6 inches. Schedule 40 <br />reeves am acceptable for stalaeon n areas wNout ratu n air plenum. <br />W archilecaxal ape alcle-, for fire stnppiri9l. Provide a Pnodud sched le For UL I tig, eaton. wall or floor rating and <br />sWlalion drawing for each penetration fire stop system. <br />Provide Pnef to mated roof curbs where pipes and or duCawrk penetrate elevated Saw a the roof W the exterior. Provide <br />cover oar Curb of seater-ressum maternal and seal dud a pipe penetrations t ro gh the mar. Provide pipe Goner of <br />Neater-mostant material with stamen steel pipe damps for pprg partraticu. <br />Provide box frames for recargular openings waded 12 gauge galvanized steel attadrd to f r- and of a maxim <br />dmenow deraaished by to Arh4M. Notify the General Contractor or Anh4ed before installing any box openings not <br />shown on ore Amhrlectual or St ucaaal drawings. <br />Seal co ncrete or maso ry exterior wan penetrator- below grade wed'van pipes and nnec anical sleeve seal. Provide u <br />won >trll pipes' wh ntegral vvatersto0 rig manfauuned by Jay R. Smi h. Josom, Wads. Wads or Zurn. Provide neduta <br />mechanical sleeve seals, manufactured by Capps , Metraflex. or Thur ledire I Link Seal. <br />Seal elevated conciee slab with water proof rnembran s penetrations with limn pipes- and water pod sealant. Secure <br />waterproof merrbram nearing betwam'well pipe damping Rage and ciampag nni Prows rast'iron wan pipes' wN <br />nregral weterstop ahg manufactured by Jay R. Smih, Josam, Wade, Watts or gum. <br />Sizes largo than t e pipe served. <br />Provide Shedue 40 PVC pipe sleeves for venial pressure pipe posing through concrete gab w grade. Sleeved shah be <br />one nominal pipe size Larger dust to pope served ad two pope saes Larger tan pipe served to- ductile Iran pipes with <br />matraxurp Pods. Seel water -tight will sdico e, wfk <br />Provide 12 inch thi k celular loam x su ration around parirtMer of wa-pressue pipe passing t , concrete, slab on grade. <br />Insuiabon gal extend W 2 ehhes above and below he concrete slab. <br />L. FIRESTOPPING <br />Sealants and accesso i s anal haw fro-musence M WW vdrated, as established by tewrg identical assemblies in <br />Through and Mmhbrare Penetration Frestopping Systems Prod 1 Schedule: Provide UL ksbrg, brawn, wall m floor mbrw <br />and aatallatlon drawing for each penetration fire stop system. <br />Wham Project condipns require modifiatlon to qualified ea lrg and rhspecaig agency/s illustrations for a pare culr <br />aestoppirg condition. submit illustration, win moddicaions marked, approved by perhellmdon firestop Pi g manufacturers <br />limpo ecton engineer as an engineemhg judgrrrm w equivalent fire+esfstance-rated assehby. Inlude quatdicarions data <br />M. MOTORS AND STARTERS <br />Provide motors and stamlg equmrent where not fumshed win the equipment package. Moon shall have copper wind". <br />Claw B epulation, ad sanded squirrel age with startig torque damcteres ins suitable kr to equipment served. Motors <br />controlled by variable frequency drives sae be rated for voltage peaks and rtaximum roe eirma in accordance wish NEMA <br />MGI. Pm 31. Motors 5 horsepower and larger controlled by variable frequency drives shag be provided with a shaft grounding <br />system equal W Aill SGR Beating Prot ton Ring, Inprof5eal Curet Drverta Ring (CDR) a approved equal. Mobs for <br />sir handlkg equpme t shall be Selected M quiet operation. Eck motor shall be dnecked for proper robaion aller electrical <br />.orrecmn has been competed. Prove drlpproof emiowre for loations projected horn weather and rid in air stream of tin; <br />and toWy enclosed fan coded enclo sum for moon exposed W weater Motors soul be merxfuctured by Caaury. General <br />EeWlc. Louis Ass. Wesanghmx, or approved equal. <br />Provide every moles, escept factional hor epower sago Phase ngbrs wed an approved type of-buk-ai Memrl overWad <br />potation, win a motor starter. Eau starter Man be prwoed whin overload hewers sihW W the moer mug, and awry three <br />Phase motor starter Mat have overload heaters n each pax. Anbent compensated hurlers shad be asuMd warever <br />necessary. Unless noted oVrmwise, motor starers Shea be Mxnised by he Diwion 23 Conpec'a for Mtakation ad <br />mrrracmn by to Dmsion 26 Contractor. Starers shah be A11en-Bmdey, Clark Fumes, Square D, or approved equal. <br />N. VARIABLE FREQUENCY DRIVES <br />Provide PWM variable koW cy drives tVFD) W aid fw m pmp mpnxs w iMwated w to drawees Prove VFD w <br />manufactured by AC Tecnobgy. Asse &win Bowan, Dankss, Reliance Eecvic, or Yaskawe ndide an inegral. <br />door-fnterbcked input cfrdxt breaker M fused drscoahec whi h nay be padlocked n tlr -OFF- poshbn. <br />Provide a magrobc o-orator rranwl bypass krtegral to each dma Provide two magnetic mnlaloS. mahanialy aW <br />eleconcady aterlodied. W LaCLate to amverter output from &he voltage. The nth enter input shot be stiffed by edmer a third <br />b:metallic trnral mold overoed relays wan adjustable trip Beings. <br />Provide input AC line reactors without exception. Readers shall be mimmum 3 percent Impedance, and'M rated per IEEE <br />C57-110 For harmonic cument content. Reactors shall be integral b the drive enclosure without need for field winng <br />The VFD shall have an RSJa5 port as standard. The standard protocols Win be Johnson Controls N2 bus. Modbus, and <br />Siemens Buikkng Technologies FLN. Optional protocols for BACnetc, DeviceNeL Ethema, LonWorks, and Profibus shall be <br />available. Ea h individual drive span have ore protocol in the base VFD The use of third pad gateways and muiplexers e, <br />rot acceptable All protocol shall be'certified' by Via govem:ng autlarity. Use of noncertified wv -ids U not snowed The <br />VFD man alloy the DOC system to wind care digital and analog outpw d to drive via to seder imerface. This coned shah <br />be Indeperndent of any VFD function. In addition, a1 he digital and analog inputs of the drive shall be spade of berg <br />monitored by the DOC system. <br />Dnve supplier stun provide jobae start-up, Owner taming. ad a one-year part and on -she labor warrmly. Aguiple visits <br />shall be included W allow for tunig and tro bleshootirig of Ne Combols system as required. <br />O. ELECTRICAL WIRING <br />High voltage wiling ls defined as 50 Voks or higher. Low "age w iN ls defined as Teas than 50 Volts. Lire voltage wrvg <br />Shea be provided by Divisim 26. Line voltage control and ntedock wing for mecrancal systems shall also be provided by <br />Division 26 Low vol age control wiring shag be provided by Division 23. Furnish wring diagrams to Division 26 as required for <br />proper equipment hookup_ Coordirele with Divisipt 26 tine .dust cum sung amps for mecanicaa equipment (from to <br />equipmearl nanepele) W erasure proper distalta on. <br />Provide power end conrruniration wring with transient prdecion in accordance with IEEE C62,41 2. AI control and nterlod <br />wrng mad comply' win to NEC. Coned wring shhall be wed W attam odate pre outage drop associatea wih the distanu <br />baleen t e contra device and tie rmtreler. Control wing not Insded in conduit shall be UL rated for platter In t apLation. <br />Ad NEC Class 1 (knit votage) wring sal be UL hided'n approved raceway according to to NEC and On is m 26 <br />req uremerts. Maximum allowable voltage br wed wring shag be 120 V. AI Lorvoltage wtrxg sun meet NEC Cass 2 <br />requrem-ft Lowvokage power drtuits shall be sub -used wen squired W meat Class 2 current kmt. <br />Condal for Cord Wksg. EMT with compression Rftings, cold roiled steel. zinc coated or znccosted rgid steel wll <br />threaded comleaons. <br />Pug and Junction Boxes: Size accords g to number, size, and position of entenng raceway as required by National ELedrea <br />Codes Enclosure type shall be wiled b bration. <br />Instal wing parallel to buiktrg Ines whatever possible. Concha at control wring n finished roars. Do not Instal Gass 2 <br />wring n racew uy coma g Class 1 wing. emes and panels wtaining high vokege wring and equipment may not be wed <br />for low-vo," wrrg except for the purpose d vhterfaci tine two w.es (e.g., relays and tratsfor-). Ali wine-b deviw and <br />wne-b - nit mrvhe tors snag be made d a terminal block or terminal Strip. All rare of wmmutiraeon wrap shun be uusplieed <br />length wen tat Length a comrrerwlly avadabe. Variy the integrity of he snore network fosoweg the cable aMallebon. Use <br />with the controller emanation number. Label control devices wed n Ur system wth Permanent labels using the identifiers <br />hat match the record documents. <br />P. EQUIPMENT FURNISHED BY OTHERS <br />Prove necessary aqupment end accessories that ore rot provided by the equpnent supple or Owner W complete <br />r stalLation of equipment Wmisred by oll m Locations w mdiraed on the drawugs. specified lean, or both. Equs-t <br />ad accessories not provided by to equipment Supplier may troupe. b t not be kmRed to hues. vents, ,takes, associated <br />rod jacks and caps W outdoors, dampen, Mre Fans. roof fans, anti wool Merloc ks, etc. as required for proper operation of <br />he complete system in acwdance with to mandaenners iraeu dions. <br />Coradpr shag be responsibe for Coned roughi-gn dmemsio s and slug verify own wild Architect andlor equipment Supplier <br />prior to service insataams. <br />Q. SYSTEM TESTING, ADJUSTING, AND BALANCING <br />upon co petion os each Base of the installation, test each system in conformance with local code requirements and as noted <br />below. Furnish Labor and equipment requre l to test eah system nstaled under t is Contact. Assume al Costs Iwoived n <br />m e" the tests and repaimg add reppairg any damages resulting Iterefrom <br />Fro system teslfrg. balancing and adjlstme nts (TAB) shag be palonmhod by a Contractorr catfied by Nit National <br />Environmental Balaxirg Burma (NEBB), Associated Air Samics Courex (AA11CI-or Testi g, Adjusting and Balarwng Bureau <br />(TABB). TAB shal be performed In xmdance with tie nos cvnent edition d the certified agencies procedural standard for <br />testing. adjusexV ad War ant; and shag contpy with the abide d interpretation of that stadard for execution and rep -ling of <br />ad TAB wok. <br />Test, adjust and balance equipment ad systems mluded in the scope of work. Prepare testing ad bales cirg report leg <br />wing tams equivalent wed the standard forms evadable from the TAB mrk con stadard berg followed. Adjust equipment <br />W deliver specified flow amounts on the drawngs. For ar systems. Include erlbw supply quantities. enters g end leewg <br />temperatures. and pressures at design flow. For hydronld systems, include widens g and leaving lamperalums art pressures <br />at design flow. Include fan and unit test readl motor v~ and amp draws. tic., and submit six copies of the final <br />conpMeon of data W t e Arc itect for evaluation end approval before fnal inspection of t e project. <br />lace ar systems to within plus or minus 10 percent br tmninal devices ad brer cin free and plus or minus 5 parent for <br />(fude and ar handli g equimrent d the amount a air shown on the dmwnrgs. TAB Conbaclor sal record space <br />lempoeurns and make adjustments narrow to each ddfser to obtain undorm temperaunt (no greater ham -1- 3 F) in <br />spaces. Document temperatures and adjust-M n tab report. Balance hydmrac systems to provide now miles waltvn pus or <br />matt 5 t of now -fed on draw m es ' ed for bon. 'wit t 1 <br />perche spec rgS re a * pops System apem in a elopes n t opera a lu <br />intended by ar spebficalion TAB mpart MaA rhdude a'repprt sumnuryhemarW' section n acwdance with to procedual <br />standard the provides both system set up and a summary of defivenclas re defined by tlho procedural standard <br />TAB Conbador soul be responsible b calbrate. sec. and adjust as -nail to pemtue control sensors. a;Watom ad Control <br />devices. CMM pope sequeredng of x1modc system s. ad operation d safety controls, adjust thermostats. ad .."a <br />xpotrm. trade and tme based adjustme t to operate n accordance win to Performance requiremanu of to Co struction <br />Document. Adjust pumps, fans, etc for proper and effeient operator. Ceraty to Achchtect Nat adAusmeres have been made <br />and tat system a operating aamfacbnly. Ca6bate, set ad adjust auWnuec temperaum controls. Check proper seque-nt; <br />of nodock syste s. ad operaben a Solely contrds- <br />Dv a ci 23 contractor Mal align bearings and replace beamgs tat have drt or foreign material n tem with new bearings <br />wnnwt addtfonal cost W the Owner. <br />R. SEISMIC CONTROLS FOR MEPF SYSTEMS <br />SeiSiac Role lion Cneha. <br />RokhOccpency Category I II or his) <br />Site S.a cragory Cphlmdors Seismic Ergr aw to Delerm- <br />Seismic Design Category Cmv� toes Sesmic Erprrer b Determine. <br />Component Importance Factor: Determined from ASCE 7, moat recall version. <br />The Contractor shall be reap-aDla for ddmnnng the requreents for seismi Ixadrg of inechanical. elect El. ad <br />plumbbg systems. Sam- pdedion a tern wed W deemhne Seis is brining requr maims of al mec anical, electric 1. and <br />plumbing systems, shi be dwerrmned by the appli able code adopted n the project jursd,dion. Wren not steady <br />determined within Ica cons a t documents, the Cordractor anal be reapo seals for camactirg a Licensed professorial engineer <br />W establish building 340 class. seopic design rateg-y. searrac zee, a any other drunks necessary b detamae tie <br />rewiremendi For seismic bang on mechanical elecoical. andlor plumbing system. <br />Seismic brcing of hie pot lion systems sat be aRUlled in strict xwdance wWh the provisions d NFPA 13 (2010 or eter <br />offibi <br />The CorbaCip shot determine the type ad be do , d seismic braorg required for the mechanical. eledncal, and plumbng <br />elements shown W fie drawl gs based on to established seismic criteria, to Size and weight of he supposed elertent, and <br />to deface from structure of the supported element. <br />The Cd4ractor shad Sul the following shop drawing info mation W the AHJ and he Engahoer for review and approval: <br />1. Sefsmic anayats lit" an appkable seismic design orders, <br />2. Deadptive aelog data of seerrec bracing ma ns e. <br />3. Shop drawngs showing bra ong type and koa6on. <br />4. Instalatio , debate of ah lambing wed. <br />5 Cal ulatlors showing the the xel restrains meet the seismic requremen s, <br />Shop drawings and calculations shag be signed and sealed by a registered profedeacral engineer, licensed n he stab of the <br />project and employed by the manufacturer of he seonac brarxg products. Cafouiabons Mall include dead bads. static <br />seismic bads. and capacity of malarial Wized for connections. <br />Seismic Union. restraints. lolalots, ad isolation materials shah be of he same menufe surer and shag be confided by she <br />from Cold- OSHPD or one recoglowed government agency stowing maxmwum restrain ratngs <br />Seismic bratxg measures W be applied W meduararal, electrical. and plumbing equipmersyserm shall be insi n and <br />accordance with a1 applicable kcal, state. ardor federal Codes as well as mauecbaeh requrmar ts. The most strxgaa <br />daeria seal apply. All anchor waeCOMs W Stnuaae for Support d m rcarital and elecWa equipment regardless d Vho <br />need for seismic restraints. Mal be shown on shop drawings. <br />S. IDENTIFICATION <br />Provide nu nfxLuers standard pre-printed. sem4rfgd map orl or permarnmt edhevve, preawre-senw,va vinyl pipe <br />marker. Color code pipe markers W comply with ANSI At 3.1 <br />Install ppe makers W rah HVAC ping system and a ludo mows b sxw normal drection d flow. <br />Locate pipe marker and color bands whemver piping ls exposed b vkaw in occupied spaces. machine rooms. as ssoUe <br />marderune, spaces (shags. tunnels. plenums) and exterior non-conc aled butipr. <br />Provide plaric laminate a braes vat" tag w every valve, cock and coned device in each HVAC piping system: a ludo <br />check valves, vaves won factory-tabroaed equipment units. and shutoff waves at HVAC ermind devices and Smiler <br />rough-n wwhoca-a d od-use rdbues and units. <br />Provide manufacturers Standard lamnated col- coded t markers. Conform W Me fd color code. <br />plastc, etion Con bang <br />Greco la Coding: Ydbw for Heating; VebwlGreen for combination Codrg aod Heating, Browin for Energy Reeamation; <br />Blue for rite equipment types. Conform b ANSI At 3.1 for Herod- Equipment. <br />Provide sanded stars for equipment identification a Contractors option or whore dr h_ of required identifition reputes <br />ledetrg larger ham 1 Inch halide. Stem paint shah be exterior type, dl-0ased, akyd wanal, minimum 1-1141nch heghht or <br />great w requred for 1-g dlstaare Identification, wore a bad, color for Dean contras. <br />Provide duct markers or provide stenceed signs and arrows I dicatig ductwork service and flow dr uo n In black or white <br />latenng for best compost with dud or naWrion color. Locate maiden maximum 50 feet sldrg seci dW Side a a whin 5 feet <br />of ad conbpl and boar di g dampen a branch ducts more than 25 eel length ad vwlihm 5 feet m each sole d wan. floor, am <br />soli pare rdbors. Provide additional markers n congested areas or at mutsple duct noses reourmo for eanty <br />3. DUCT INSULATION, DUCTWORK, ACCESSORIES, FLUES AND FANS <br />A. LOUVERS, PLENUMS, SCREENS <br />Pmwde stake ad a haust or l uvers by Ruskin model ELF375X a equal American Warms g 8 Vereiati g. Casco. <br />wall Nieo es i. 45 degree bustle angle. blades on 5 nh amen; hams sal be extruded durnsxum, 0.0®0 Ilan will txdeess <br />Construct Parana wed gaMazed ale framing members and gavanfzed Meet metal. braced with galvanized angles <br />Gauges and braci g shag conform to SMACNA rewnmendasms for ductwiork of Ike sizes Where access doors am shown. <br />prove hi ged doors with NM2 Verdi latch. Make watemght connectors to buvera. sloping bottom of plenum to Orin weer <br />W weeph.l. n bottom of kxner. <br />Provide soeera w louvers, duds, hoods, tme. and open^9s W the outdo-s w scheduled aM/a noted m to drawings. <br />Inca t screem, sal be 0.012;nc�h thiemess, 1N inch mesh, aunanum wire. Brd screens shal be (I -tech, 12 i ch mesh <br />galvanized steel wre. ProwWe mwxpaed control dampers w baft damped wee show+on the drawiggs. <br />B. EXHAUST AIR SYSTEMS <br />PrdMe roof mounted exhaust fans as scheduled w the drawegs, or equal ACME, Carnes. Cook Greerneck. Pennbarry, - <br />Twn Cory Fans otmpete with alum mum Iousrg, aluminum centrif gal wted, motor with integral tthermal ovedoad protecawt <br />disconnect switch mounted Inside tie hosing, ardween, to Jkdrefl dam per, and pre -"veered rod tab. Three phase farhs <br />shall be furnished with magnetic starters with push bbon station. <br />Prove and mounted hpblast exhaust fans es Shediled on ee drewnp, Amxex, ACME. Carnes, Cook. Greenhill Perviben,, - Twin <br />City Fans - list is wh skxnnln housing. du inure coneifgd wheat. mot- wed ,Nagai ter al overload on.-. dfemrined south <br />niquned raids tlho f Went, ban So ghh. brdsoeen arc ve2rgkheered rod axb wm mmimum height as sc hetlusd m the drmgs <br />4. SEQUENCE OF OPERATIONS <br />A. EXHAUST FAN CONTROL (EF-1) <br />Interlock fan operation With thermostat. Fan shall cycle to maintain space temperature of 90 F. <br />5. COMMISSIONING <br />Provide conrrissoring Nat vent a and d wnents to Wnmrs iored buldmg sysems have been designed, installed. and <br />Wrction acordng W Vho owihers project requireral corset lion dwurier ts, and to minimum code requrements. Retain <br />the services of a turd -party registered desgn professional or approved agency that a regularly engaged in conducting <br />wnmi orwig W develop a commissbnlng pan, suppomvg documentation. ad reports. Rider W the latest adopted edition <br />d die applicable aergy code for more nformalbn. Compote all rota dd wnnwssbrahq requeemenl prior W final i spectiors. <br />Sub it find TAB report and final comamssionirg repot to t e Engineer and Owwner within 90 days of he date of moopt of t e <br />war m d ora�ancy <br />ASHRAE 90.1 Camwnisvorng Rewmemems Test control systems to ensure fie coned elertents am calibrated. adjusted. <br />and n proper wotdng oordi on Commsgon systems axorotng to ASHRAE Guda nit 1.1 -HVACdR Technical <br />Requiemernts for to Commissionirg Process, most anent edition <br />Calif-aa Tre 24 Commissioni g Requrements: Comply with the commissiorrg requirements according to the <br />Non -Residential CeniM1raom of Conpkanca (NRCCLXR) on he drawings. Perform mmmissbrirg n acnMznce win Nit <br />California Energy Code Section 120.9. <br />IECC Commissioning Requirem nes: Provide conxrnsoc irg d ad mechanical systerts included n tie scope of wok except <br />for pacaged equipment not equipped with an econortizer. Packaged equipment rrJudes weary air corddice ens and <br />cordenshg uhds, undary deriooled and watercaoled heat panps, and packaged ternmalal 8a wt6aonrg units. Contract t e <br />third -poly "Waved design professional or approved agency W develop a co mssioning plan. prelanehary conn-mo ring <br />report and lira commhssorYng report. <br />Canmissbnirg pen shag wiclude the following. <br />1. Nanative desorption d ahiabes and persorod required during wrmisoonarig. <br />2. Let d squiprihont and systems W be tested win desaip on d tesb to be performed <br />3. list of functions b be tested, ncludi g calibration and economizer contnxs. <br />4. List of cordaore, under wwh tie teal shall be perbmed. <br />5. List d measu able crime for pedor ant. <br />Submit a copy d the petminary c-rrassioning report W tie AMJ. Prolminary comint onlng report shag inchde the <br />following <br />1. Res Ws d pefmivWxy fnctional perMmanoe tests. Organize equipment and co pprnts spai by oho Dnisans <br />n separate sehons for roependent review. <br />2. list of fur cho al performance testing Woceoums uses duri g corn mswnirg, mkiding measura le o Mena for test <br />acceptance. <br />3. Competed Commissimrg Comphaae Checdet. Refer b energy code for he form. <br />4. Itemization of defidences Found during fesbng tall hive nor been Connected a the aria d pre imaary wnmar o amg <br />report preparation. <br />5. List d cleMed hiss drat canna be performed at tie time of pmkmnay commissioning report preparation because of <br />climatic .-Mims. <br />6. List d ch natic coroiuora required fit tine penfo nonce d the deferred fnn. <br />Final wmimersipnng sport sal include he fallowing. <br />7. Rewts of fir fah-o perfomance herbs Organize equ'pnat and components specfed by other Divisiomu in <br />separate secticrls f- ndepende nt review. <br />a. list d functional pMormance testing procedures used durng rartmssimeg, nckx% g mrasuabe c rime for test <br />acoeptanre. <br />9. ner izacm of resolved dearie rofes fond dump preliminary commfssbnkhg. <br />10. Lis a defamed fob that came be performed at tr time a final commissioning report preparebgn because of climate <br />condtiorts. <br />condu t functianal pedmnahce teen on equipment, controls, and ewomium s. Furc oral perfor ance tests call <br />dmmostrets Nor fonowehg: <br />11. The con function and maintenance Serviceabilit for each commissioned u t ads em e <br />opera y eq prey .carp -ant. ya <br />conferred acmrdi W to ins end ems. <br />rg app-.ed pa odes. ba <br />12. The sequence d aperabpns, ahhidirg males. backup rtgdes (d appnabe), alarms. and mode d operation upon a <br />kin d power and restoration d paver for emir control device, equipment. component and system. <br />13. Cord devices, components, edupment. did systems arc calibrated, adlusled, and operate n accordance with the <br />approved planes and specifications. <br />14. Air ecoronwzers operated n a cordance wh manufacturef speorams and spedl ed sequence of operation. <br />6. ALTERNATES <br />A. DESCRIPTION <br />Refer b Nit ahaectural portion of to Spedfiation for list of alternates. Appirabe sections d p e base spedfrcations call <br />apply to ah work required by Ins alternate unless otherwise spedfied Detemane wanetina w not and hhow each alternate affects <br />wok kxhide Labor, materials. equfpmrmt and aarep-tab-+ Srvices necessary br and incidental to the compecon d -fir <br />uder each Partic da memae Fumsh separate bid for each ahem le aipplicable to work, stating the amount W be added or <br />deduced from the bese old. <br />r�E.W.E ERSON <br />ENGINEERS <br />8345 LENEXA DRIVE, SUITE 300 <br />LENEXA. KS 66214 <br />TEL 913.742.5000 FAX 913.742.5001 <br />W W W. HEN DERSONENGINEERS.COM <br />2150002151 <br />WA. CORPORATE NUMBER. 1754 <br />06/30122 <br />_W <br />I <br />9 <br />F <br />Z <br />O <br />- <br />F <br />11 <br />� <br />(If <br />V) <br />F <br />lei <br />f <br />W <br />d <br />0 <br />s <br />Q <br />0 <br />M <br />W <br />lY <br />DRAWN: TY <br />CHECK: JNH <br />JOB NO: ZO-02O <br />V <br />d) <br />O <br />T_ <br />L <br />>wp <br />J 0 <br />�- W 0 <br />f__ (Y 6� <br />--1 < <br />U <br />ff � � <br />d <br />LL <br />LU W <br />U <br />O I - <br />i 0 � <br />/ 2 <br />M 1 <br />0 0I11 <br />ki <br />0� 2 <br />1, <br />SHEET: <br />M2 <br />OF: - SHEETS <br />