Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (14)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (40OW) <br /> (14)ENPHASE <br /> I08PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:5.600 kWDC <br /> SM■■ : SOLAR STANDARD SYSTEM GROUNDING ' ■ �• SOLAR APPENDIX C ■ 4C SYSTEM SIZE:4.200kWAC <br /> on■ MOUNT INSTALLATION GUIDE PACE an MOUNT UNIVERSALAF MIDCLAMP INSTALLATION GUIDE : PACE <br /> --------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> WEEBLUs DESCRIPTION DATE REV <br /> ----------- <br /> -__-_— ,Single Use Only i„„ <br /> i <br /> PROJECT NAME&ADDRESS <br /> ONLY ONE LUG PER ROW OF MODULES: % ee <br /> Only one lug per row of modules is r <br /> WEEBLUGCONDUCFOR-UNIRAC P/N 0080025: <br /> required. See Page F for additional lugs �— _ �� Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance hole U) <br /> required for expansion joints. = in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, <br /> oriented so the dimples will contact the aluminum rail Place the lug portion on the 1.Position clamp to align T bolt with rail 2.Rotate damp clockwise 2/3 of a tum 3.Slide clamp into position against 4.Place second module. <br /> bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and slot.Lower clamp and insertT•bolt into to engage T-bolt inside rail slot module. _ <br /> nuLTighten the nut until the dimples are completely embedded into the rail and lug. rail slot <br /> TORQUE VALUE 10 It Jos.(See Note on PG.ai CV <br /> See product data sheet for more details,Modet No.WEEB•LUG•6., � O <br /> O <br /> Q <br /> GROUNDING LUG MOUNTING DETAILS: <br /> Star Warne le - f"< > O <br /> Details are provided for both the WEEB and Ilsco products.The WEEBLug has a slnyle use Only <br /> grounding symbol located on the lug assembly.The Ilsco lug has a green colored O <br /> set screw for grounding indication purposes.Installation must be in accordance rY- W W <br /> sf O <br /> lop <br /> with NFPA NEC 70,however the electrical designer of record should refer to the - Aq: z W O <br /> latest revision of NEC for actual grounding conductor cable size. TtRMiNAtToepu L _� W O <br /> Requued II not using approved integrated ..0 grounding uutruinvetel i i.acanam <br /> duz O WWI.., (` <br /> F - ,p,e W 0n tole: W ^ / <br /> It,AWG:Mi,it 1 f/J W 0 <br /> AWG 25"'A, - a W <br /> GROUNDING LUG-BOLT SIZE&DRILL SIZE � W W' LLJ <br /> GROUND LUG BOLT SIZE DRILL SIZE QZ <br /> ILSCO LAY-IN LUGCONDLKTOR-UNIRAC P/N 008009P:Alternate Grounding Lug C/) <br /> WEEBLug 1/4- WA-Place in Top SM Rall Slot -Drill,deburr hole and bolt thru both rail walls per table. S.Tighten bolt and torque to 15 ft-lbs. NOTE:If excessive force is applied in d <br /> ASCO Lug x10-32 7/32' TORQUE VALUE S R lbs.(See Not, step 2,the cap may over-rotate causing Q Q <br /> See ILSCO product data sheet for more details,Model No.GBL-4DIIL it to be mis-aligned with the module Q <br /> Torque value depends on conductor size. frame.If this occurs,keep rotating the <br /> See product data sheet for torque value. cap clockwise until it returns to the <br /> NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION original position. LL <br /> O <br /> (V <br /> M <br /> (Y) <br /> DATE: 10/26/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11rt X 17" <br /> SHEET NUMBER <br /> PV-20 <br />