Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (32)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (40OW) <br /> (32)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:12.800 kWDC <br /> sono SM SOLAR BONDING CONNECTION GROUNsie D P__ <br /> ATHS ; N ENM SOLAR ENDCLAMP, FIRST MODULE AC SYSTEM SIZE 9600kWAC <br /> ■� MOUNT INSTALLATION GUIDE ; PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> -------_--------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> �/ REVISIONS <br /> 11 <br /> M°G`F B '`i _ Q © © I DESCRIPTION DATE REV <br /> o <br /> yOOG< F�yF rQ r � i �f' �' `sl �l 1 REVISION 10/28/2022 A <br /> �OING r90 <br /> Volra <br /> BOUI PROJECT NAME&ADDRESS <br /> Jn_ <br /> WIP <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into <br /> Bonding Hardware creates bond between surae ©serrated flange no removes Lfoot anodiratmn clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to Q <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad srcnon to bond LFoot to st—ims steel T-bol[ <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side Of bracket as shown.Do W <br /> y�Aluminum splice ba+spans across rail gap to Serrated T-bolt head penevates ail anodization <br /> V create rad to rail bond.Rail on at least one sme grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail not force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum damp to stainless steel T-bolt m bond T-Dolt.nut,and L-root ro <br /> aspllce wnl be grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. ., <br /> Serrated T-bolt head penetrates fail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end <br /> modules to SM rail O <br /> distance from end of rail, module and prior to the Wst N <br /> end module. 00 N <br /> O <br /> W- <br /> IiettwnwirAimve J ct E , II 2 O <br /> A- <br /> T-BOLT 1 k7gF Q 0- <br /> E Ap D g ? II- <br /> co z w <br /> MOUND•solid 7 BONDINGCENBA0.IL ��_ _ © ©� 0 W � <br /> .�'.7 MICROINVERTE0. <br /> ♦ MOUNT <br /> / WEEBLUG(OR ILSCO LUG) ® _ LJ,J W O <br /> LL <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with > z <br /> Hex no with capt"tock washer bonds metal WEER washer dim les pierce enodlred fait to Install the first end module For best appearance, <br /> ('� v flange in full contact with rail,rotate end damp bolt until 0- <br /> BONDING <br /> I T�microinverter flange to stainless steel T-toll `-� create bond between rail and luq position module flush Ly <br /> BONDING MiocLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q <br /> 4 to tSerrond-tr oft head penetrates ail unoduation <br /> ASSEMBLY - — Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more <br /> to ford T-Dolt-nut.and L-loot to grounded <br /> A C SM Mil-.,_ ,,. ,,, „1, „ ©p <br /> provide R tel system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1R'beyond module. Q <br /> aw.,ms,�.ryr,en�neu un®f,rtr n,n ter- 1'iT:I—%_,5—.t.zce,�:,nr.—.,w u. 1 Module must be fully <br /> t�note et�r._„ as rRtn of rails. impact action of driver begins. supported by rails and = <br /> RAILTO L-FOOr d apgw.a rMndrwarwr as�wr�'w rya l N p'ee 9 <br /> _WAo"V_tjGT-BOLT , mujE VALUE(See t. s..i ,;.tccannot overhang ends M <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. <br /> r <br /> N <br /> DATE: 10/28/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> SPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />