Laserfiche WebLink
0 TRANE- <br /> Features and Benefits <br /> The same ReliaTeIT' Board fits all Heat Pump models.This provides standardization of parts for <br /> contractors. Less money is tied up in inventory with ReliaTeIW <br /> Unit Cabinet <br /> The compact cabinet with rounded corners takes up less room and is less costly to ship.The <br /> beveled and ribbed top is not only aesthetically pleasing, it is designed to prevent water from <br /> pooling. <br /> RigorousTesting <br /> All of Precedent'sT1 designs were rigorously rain tested at the factory to ensure water integrity. <br /> Actual shipping tests were performed to determine packaging requirements. Units were test <br /> shipped around the country to determine the best packaging. Factory shake and drop tests were <br /> used as part of the package design process to help assure that the unit arrives at the job site in top <br /> condition. <br /> Rigging tests include lifting a unit into the air and letting it drop one foot,assuring that the lifting <br /> lugs and rails hold up under stress. <br /> We perform a 100%coil leak test at the factory.The evaporator and condenser coils are leak tested <br /> at 600 psig.The assembled unit is leak tested to 465 psig. <br /> All parts are inspected atthe point of final assembly.Sub-standard parts are identified and rejected <br /> immediately. <br /> Every unit receives a 100%unit run test before leaving the production line to make sure it lives up <br /> to rigorous Trane®requirements. <br /> 16 PKGP-PRC013K-EN <br />