Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' E2208-232 Description: Cell Tower Battery Replacement <br /> Applied:8/25/2022 Approved:8/25/2022 Site Address: 319 76TH ST SW <br /> Issued:8/26/2022 Finaled:4/5/2023 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant: ENERSYS DELAWARE INC <br /> Parent Permit: Owner:CITY OF EVERETT <br /> Parent Project: Contractor: ENERSYS DELAWARE INC <br /> Details: <br /> Install temp 48v battery string and connect to PDU,removing existing 48v battery/rack and installing new 48v battery/rack. Battery <br /> string placed online and removing temp battery.All connections torqued per manufacturer's specification. <br /> Cell Tower Battery Replacement <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 3/30/2023 3/30/2023 (REASON <br /> GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> REMOTE CELLSITE JUST WAITING FOR TOTAL COMPLETION <br /> 3/31/2023 3/31/2023 ELEC 10-FINAL MICHAEL APPRVD-PERMIT <br /> WICKLANDER FINAL <br /> Notes: <br /> 253-262-9910 <br /> TERRENCE.FLANAGANE@ENERSYS.COM <br /> I <br /> Printed:Thursday,06 April,2023 1 of 1 <br /> SUPERION <br />