Laserfiche WebLink
INSPECTION REPORT <br /> /N/...-* <br /> :41:„..1 <br /> #44/44-. Date (1[Z'7//7Perrnit: C (( '0& C <br /> '`' /47Ptte-S <br /> Contractor: �5 <br /> Owner: Yi 0 ` kl G Gl-t1 <br /> Site Address: '2'L( GIC ''Só & P ( i-lc' crvc <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing A S PIPE <br /> SITE WORK ❑Roof Nailing _2 'ough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ■Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> SAPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED Ill❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 4f vf°' All V-Mar IA rASSiffiralli PlEry <br /> Inspector: Date: /��p-C * ./7 <br /> EIR(10/06) DATABAR,INC. <br />