Laserfiche WebLink
Permit Ins ections <br /> VERETT WASHING City of Everett <br /> 4/4/2017 4/4/2017 ShearNailing DAVE FOSTER Corr Reqd See notes <br /> Notes: <br /> Exterior shear only <br /> Shear schedule- <br /> #4-2"OC edges 80 nails <br /> 12"OC field <br /> #8-2"OC edges 100 nails <br /> 12"OC field <br /> As discussed with contractor <br /> 4/5/2017 4/5/2017 ShearNailing DAVE FOSTER Approval See notes <br /> Notes: <br /> Exteriorshear-asper plans <br /> xteri <br /> Corrections completed <br /> OK to install siding <br /> 8/23/2017 8/23/2017 Foundation DAVE FOSTER PartialApproval <br /> Notes: <br /> Subject to plans for foundation/footing relocation. <br /> Closet/garage wall. <br /> 10/20/2017 10/20/2017 MechRoughln SHELLIE PONS Approval As noted <br /> Notes: <br /> Sump pump in basement relocation-OK to cover <br /> 11/28/2017 11/28/2017 BLDG FRAMING DAVE FOSTER CORRECTION No plans on site <br /> REQUIRED <br /> Notes: <br /> 11/28/2017 11/28/2017 MECH GAS PIPE SHELLIE PONS APPROVAL 30 PSI <br /> ROUGH IN <br /> Notes: <br /> 12/1/2017 12/1/2017 BLDG FRAMING DAVE FOSTER APPROVAL Soffits OK to cover <br /> Notes: <br /> 3/28/2018 3/28/2018 PLUMB 03 ROUGH DAROLD WALDEN APPROVAL As noted <br /> IN <br /> Notes: <br /> Complete fix on leak in crawl. <br /> Shower pan requires water fill test on tile pans. <br /> Trap arms for 1 1/2 42"maximum.Check and gate valves required on pup. <br /> Will look at on final. <br /> 5/2/2018 5/2/2018 MECH 01 SHELLIE PONS OTHER <br /> CONSULTATION <br /> Notes: <br /> 1.Complete fireplace vent-see manufacturers specs for motor placement,clearances,and termination. <br /> 2.Verify exhaust terminations for furnaces and hot water tank meet manufacturer specs. <br /> 3.If hood exhaust is over 400 CPM,you shall interlock make up air to the exhaust. <br /> 4.Complete exhaust fan ducting,verify that whole house fan is less than 1 sone. <br /> � w <br /> Printed:Thursday, 16 February,2023 2 of 4 r4, <br /> SUPERION <br />