Laserfiche WebLink
August 18, 2014 <br /> Gibson Bluff <br /> L&A Job No. 14-056 <br /> Page 24 <br /> moderately-high to high resistance against slope failures. The key to maintain site <br /> stability is to provide proper and adequate erosion mitigation and drainage control during <br /> and after completion of construction. It is our judgment that provided the <br /> recommendations in this report are fully implemented and observed during construction <br /> and after the completion of the development, the areas disturbed by construction will be <br /> stabilized, and will remain stable and not increase the potential for soil movement. In our <br /> opinion, the risk for damage to the proposed development and from the development to <br /> adjacent properties from soil instability should be minimal. <br /> LIMITATIONS <br /> This report has been prepared for the specific application to this project for the exclusive <br /> use of Gamut 360 Holdings and its associates, representatives, consultants and contractors. <br /> We recommend that this report, in its entirety, be included in the project contract <br /> documents for the information of the prospective contractors for their estimating and <br /> bidding purposes and for compliance with the recommendations in this report during <br /> construction. The conclusions and interpretations in this report, however, should not be <br /> construed as a warranty of the subsurface conditions. The scope of this study does not <br /> include services related to construction safety precautions and our recommendations are <br /> not intended to direct the contractor's methods, techniques, sequences or procedures, <br /> except as specifically described in this report for design considerations. <br /> Ou <br /> r recommendations and conclusions are based on soil conditions encountered in the <br /> test borings, our engineering analyses, and our experience and engineering judgment. <br /> LIU & ASSOCIATES, INC. <br />