My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2211 GIBSON PL Geotech Report 2023-04-06
>
Address Records
>
GIBSON PL
>
2211
>
Geotech Report
>
2211 GIBSON PL Geotech Report 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 9:40:36 AM
Creation date
4/6/2023 9:40:06 AM
Metadata
Fields
Template:
Address Document
Street Name
GIBSON PL
Street Number
2211
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 18, 2014 <br /> Gibson Bluff <br /> L&A Job No. 14-056 <br /> Page 24 <br /> moderately-high to high resistance against slope failures. The key to maintain site <br /> stability is to provide proper and adequate erosion mitigation and drainage control during <br /> and after completion of construction. It is our judgment that provided the <br /> recommendations in this report are fully implemented and observed during construction <br /> and after the completion of the development, the areas disturbed by construction will be <br /> stabilized, and will remain stable and not increase the potential for soil movement. In our <br /> opinion, the risk for damage to the proposed development and from the development to <br /> adjacent properties from soil instability should be minimal. <br /> LIMITATIONS <br /> This report has been prepared for the specific application to this project for the exclusive <br /> use of Gamut 360 Holdings and its associates, representatives, consultants and contractors. <br /> We recommend that this report, in its entirety, be included in the project contract <br /> documents for the information of the prospective contractors for their estimating and <br /> bidding purposes and for compliance with the recommendations in this report during <br /> construction. The conclusions and interpretations in this report, however, should not be <br /> construed as a warranty of the subsurface conditions. The scope of this study does not <br /> include services related to construction safety precautions and our recommendations are <br /> not intended to direct the contractor's methods, techniques, sequences or procedures, <br /> except as specifically described in this report for design considerations. <br /> Ou <br /> r recommendations and conclusions are based on soil conditions encountered in the <br /> test borings, our engineering analyses, and our experience and engineering judgment. <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.