Laserfiche WebLink
E EVERETT <br />Project title: An Ordinance creating a special improvement project entitled "WPCF Barscreen Upgrades" <br />Fund 336, Program 027 and repealing Ordinance No. 3824-21. <br />City Council Agenda Item Cover Sheet <br />Council Bill # <br />CB 2304 — 21 <br />Agenda dates requested: <br />4/5/2023: 1st and 2"d reading <br />Briefing <br />Proposed action 4/5/2023 <br />Consent <br />Action 4/12/2023 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />John Nottingham <br />Phone number: <br />425-257-8844 <br />Email: <br />jnotting@everettwa.gov <br />Initialed by: <br />2 LS <br />Department head <br />Administration <br />Council President <br />Consideration: Plans & Systems Ordinance <br />Project: WPCF Barscreen Upgrades <br />Partner/Supplier: <br />Location: Water Pollution Control Facility (WPCF) <br />Preceding action: Ordinance No. 3824-21, approved 10/6/2021 <br />Fund: 336 — Water & Sewer System Improvements <br />Fiscal summary statement: <br />The funding source for this project will be Fund 401 Water and Sewer Utility Fund. The <br />programmed available funding for this project will be increased from $2,000,000 to <br />$3,200,000. <br />Bids for this project opened on March 14th, 2023, with two bid proposals received. <br />McClure and Sons, Inc. of Mill Creek, WA submitted the lowest responsive bid in the <br />amount of $2,275,712.49. The additional funding is in response to bid results and <br />current inflationary pressures. <br />Project summary statement: <br />At the Water Pollution Control Facility (WPCF), the flow to the trickling filters is a <br />combination of primary clarifier effluent and aerobic lagoon effluent from Aeration Cell <br />1. <br />During the review of the WPCF for the 2020 Facilities Plan assessments, the TF/SC <br />bypass structure and trickling filter Influent bar screens were found to be in poor <br />condition and lacking isolation controls. Replacement and improvements are needed to <br />ensure reliable WPCF operations and flow control. <br />This new ordinance will provide sufficient additional funding for the construction phase <br />of the project based on our recent bid results. Portions of the project include the <br />rehabilitation of the secondary clarifier bypass structure and the installation of a <br />permanent bypass pipeline and structure to bypass the existing Trickling Filter Influent <br />screening structure. The construction work will require a temporary bypass pumping <br />system and the use of extensive groundwater control measures. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special improvement project entitled "WPCF Barscreen <br />Upgrades" Fund 336, Program 027 and repealing Ordinance No. 3824-21. <br />