Laserfiche WebLink
(E) WF BEAM, <br /> ORIENTATION VARIES <br /> 1 NOTES: __=2zz-czl7,-zu::t,=-_A ___- ztx4-_- <br /> 1. PIPE SHALL BE VERTICALLY SUPPORTED AT NO MORE THAN 10.-0" SPACING. 1/2 BM GA <br /> 2. PROVIDE TRANSVERSE BRACES AT NOT MORE THAN 20'-0"SPACING AND u • <br /> LONGITUDINAL BRACES AT NOT MORE THAN 40'-0" SPACING. BRACING TO OCCUR r II. <br /> AT EACH END OF THE PIPE RUN. y HEX NUT <br /> 3 RA EQUIREDM OF ONE TRANSVERSE BRACE AND/OR TWO LONGITUDINAL BRACES ARE y 1/2 BM GA a <br /> 4. LONGITUDINDAL BRACING, WHEN NEEDED, MUST BE INSTALLED AT BOTH ENDS OF STRUT SQUARE <br /> THE TRAPEZE. ,p, WASHERIli <br /> 5. ALL BRACES SHALL BE LOCATED AT OR WITHIN 4" OF A VERTICAL SUPPORT. --v rr: F_'.-_- --__: %". �_ k P1843 ADJ HINGE <br /> BRACING HINGES MAY BE ATTACHED ON EITHER SIDE OF THE ALL THREAD ROD OR 1 - P7546 <br /> AT THE SAME LOCATION, BRACING HINGES MAY BE ATTACHED USING THE SAME BOLT © �i _ Q _ _ t��... j/....%...% <br /> OR ROD. <br /> 6. PIPE CLAMPS/ANCHORAGE TO UNISTRUT PER INSTALLER. ACCEPTABLE TO LOCATE S547 8547 -' "-" --""""""""""""""""""""'"""" '"" STRUT BRACE <br /> PIPE ON TOP OR BOTTOM OF TRAPEZE WITH APPROPRIATE CONNECTORS TO `i `_ <br /> (E) WF BEAM, <br /> UNISTRUT SUPPORT. I 1/2"0 THREADED P1000 SEISMIC � ORIENTATION VARIES <br /> 7. SLOTTED CHANNEL FRAMING AND CONNECTORS ARE NOTES AS UNISTRUT. - ROD BRACE WHERE <br /> ACCEPTABLE TO PROVIDE EQUIVALENT PRODUCT PER ALTERNATE MANUFACTURER (I.E. REQ'D <br /> B-LINE OR SIMILAR). <br /> 8. TORQUE ALL CONNECTIONS TO THE APPROPRIATE MANUFACTURER RECOMMENDED <br /> TORQUE. <br /> 9. FOR CONDITIONS BEYOND THE SCOPE OF THESE DRAWINGS, NOTIFY ENGINEER FOR _ <br /> DIRECTION. •� <br /> THREADED ROD <br /> I PIPE ROLL HANGER <br /> UNISTRUT BRACE CONNNECTION <br /> TYPICAL PIPE SUPPORT NOTES PIPE SUPPORT ROD HANGER AT BEAM FLANGE M AT BEAM FLANGE rzis- <br /> SCALE: N.T.S. SCALE: N.T.S. SCALE: 6"=1'-0" SCALE: 3"=1'-0" <br /> S5471S547 S5471S547 S5447 5547 S5447 5547 <br /> NOTE. <br /> 'TA' CAN BE USED AS LONGITUDINAL BRACE FOR <br /> RUN 'B' AND 'TB' AS LONGITUDINAL BRACE FOR <br /> RUN 'A' WHEN 'd' IS <24" FOR PIPES <br /> / PROVIDE TRANSVERSE BRACE AT THE FIRST T_ <br /> AND LAST VERTICAL SUPPORT ON EACH RUN <br /> \ z <br /> TA <br /> T;L Ti RUN 'B' T L T Ter �I <br /> MAXIMUM SPACING FOR I d <br /> TRANSVERSE BRACES, TYP <br /> MAXIMUM SPACING FOR <br /> LONGITUDINAL BRACES <br /> 'T' - INDICATES TRANSVERSE BRACING <br /> ►'L. - INDICATES LONGITUDINAL BRACING <br /> NOTES: <br /> 1. TRANSVERSE PIPING FOR ONE PIPE SECTION MAY ALSO ACT AS LONGITUDINAL BRACING <br /> FOR A PIPE SECTION, OF SAME SIZE, MAKING A 90 DEGREE TURN IF THE BRACING IS <br /> INSTALLED WITHIN 24 INCHES OF THE ELBOW. <br /> 2. SMALLER DIAMETER BRANCH LINES MAY NOT BE USED TO BRACE MAIN LINES <br /> SECTION AT � <br /> PIPE SEISMIC BRACING ( <br /> SCALE: 3"=1'—O" 5547 S547 <br /> 1. • ISSUED FOR , <br /> 1601 6ih Avenue,Suite 1600 CO N STRU CT I O N <br /> - 20 attle,WA 101 622 822 DESIGN BY KPFF DATE 06.27.2022 <br /> :. - - wow.kpff.cam <br /> $YM RE4EION BY APPROVED DATE TOM REVISION BY APPROVED DATE DRRAWN WE SUBIRIE CURRENT REV610N SYMBOL DAZE <br /> �,AR 1 E b ACCEPTABILITY B.RONIA o6.z7.zozz STEEL DETAILS - W5523782 0 R I G 06.27.2022 <br /> ORIG 767 VERNAL PAINT BOOTH VEMIIATION-PHASE 2W5523782 KPEF EHG 06.27.2022 �'t s0 usy/c00 THIS DESIGN AND/OR DHBOKRD <br /> p d^ SPECIFICATN)N IS APPROVED L.BERG 06.27.2022 sHEE7 <br /> BOE/NG® "' �' , % APPROVED BY DEPL DATE �.BERO TIRE 767 VERTICAL PAINT BOOTH VENTILATION — PHASE 2 ' <br /> k T �`TA 6�� APPBROVEo _ _ 523762 COMP <br /> S547N. CHECKED <br /> 27 2022 ,roe NO. NO. <br /> . _. --. - ,: , ;., . :: f_..___.:. ...� :_. .. - ._.. _,:.:..,.,, .>.. k ._ ? .. FORGE_° 06.27.2022 <br /> T <br />