Laserfiche WebLink
(E) WF BEAM, <br /> ORIENTATION VARIES <br /> ""„, NOTES: ___=zrz/S Uz:2 ,.'zx,rzz_-zzc== <br /> 1. PIPE SHALL BE VERTICALLY SUPPORTED AT NO MORE THAN 10.-0" SPACING. 0 —),,,,,A- 1/2 BM GA <br /> 2. PROVIDE TRANSVERSE BRACES AT NOT MORE THAN 20'-0" SPACING AND / <br /> LONGITUDINAL BRACES AT NOT MORE THAN 40.-0" SPACING. BRACING TO OCCUR %; <br /> AT EACH END OF THE PIPE RUN. it HEX NUT <br /> 3. A MINIMUM OF ONE TRANSVERSE BRACE AND/OR TWO LONGITUDINAL BRACES ARE Y 1/2 BM GA A <br /> --- <br /> REQUIRED. = l STRUT SQUARE <br /> 4. LONGITUDIND.AL BRACING, WHEN NEEDED, MUST BE INSTALLED AT BOTH ENDS OF �:— i <br /> THE TRAPEZE. f A ✓/ WASHER <br /> 5. ALL BRACES SHALL BE LOCATED AT OR WITHIN 4" OF A VERTICAL SUPPORT. --_m.221_:ll'.J:r_ J t_Y_ _==-: ��= P7 843 ADJ HINGE r <br /> BRACING HINGES MAY BE ATTACHED ON EITHER SIDE OF THE ALL THREAD ROD OR I CONNECTION OR <br /> TO THE ROD ITSELF. WHERE LONGITUDINAL AND TRANSVERSE BRACING IS PROVIDED i P1546 <br /> AT THE SAME LOCATION, BRACING HINGES MAY BE ATTACHED USING THE SAME BOLT gh <br /> /�� � <br /> 6. PIPE OR ROCLAMPS/ANCHORAGE TO UNISTRUT PER INSTALLER. ACCEPTABLE TO LOCATE S547 S547 1D. ���'"-- / j STRUT BRACE \ <br /> PIPE ON TOP OR BOTTOM OF TRAPEZE WITH APPROPRIATE CONNECTORS TO � ` <br /> x -. `(E) WF BEAM, <br /> UNISTRUT SUPPORT. .I§ 1/2"4 THREADED P1000 SEISMIC // ORIENTATION VARIES <br /> 7. SLOTTED CHANNEL FRAMING AND CONNECTORS ARE NOTES AS UNISTRUT. - ROD BRACE WHERE // <br /> ACCEPTABLE TO PROVIDE EQUIVALENT PRODUCT PER ALTERNATE MANUFACTURER (I.E. REQ'D / <br /> B-LINE OR SIMILAR). <br /> 8. TORQUE ALL CONNECTIONS TO THE APPROPRIATE MANUFACTURER RECOMMENDED <br /> TORQUE. -- ' <br /> 9. FOR CONDITIONS BEYOND THE SCOPE OF THESE DRAWINGS, NOTIFY ENGINEER FOR 1 • <br /> DIRECTION. \, I <br /> T .' N'NNTHREADED ROD <br /> \,,J' HANGER <br /> ►-' PIPE ROLL <br /> UNISTRUT BRACE CONNNECTION <br /> TYPICAL PIPE SUPPORT NOTES ( 1 PIPE SUPPORT ROD HANGER AT BEAM FLANGE AT BEAM FLANGE <br /> SCALE: N.T.S. SCALE: N.T.S. SCALE: 6"=1'-0" SCALE: 3"-1'-0" <br /> S547 S547 S547 S547 S547 S547 S547 S547 <br /> NOTE: <br /> 'TA' CAN BE USED AS LONGITUDINAL BRACE FOR <br /> RUN 'B' AND 'TB' AS LONGITUDINAL BRACE FOR <br /> RUN 'A' WHEN 'd' IS <24"FOR PIPES <br /> / PROVIDE TRANSVERSE BRACE AT THE FIRST T <br /> AND LAST VERTICAL SUPPORT ON EACH RUN <br /> z <br /> TA <br /> �� RUN 'B' L <br /> T 1 T T T TB <br /> d <br /> MAXIMUM SPACING FOR <br /> TRANSVERSE BRACES,TYP (- <br /> MAXIMUM SPACING FOR <br /> LONGITUDINAL BRACES <br /> t 'T' - INDICATES TRANSVERSE BRACING <br /> ►'L' - INDICATES LONGITUDINAL BRACING <br /> NOTES: <br /> 1. TRANSVERSE PIPING FOR ONE PIPE SECTION MAY ALSO ACT AS LONGITUDINAL BRACING <br /> FOR A PIPE SECTION, OF SAME SIZE, MAKING A 90 DEGREE TURN IF THE BRACING IS <br /> INSTALLED WITHIN 24 INCHES OF THE ELBOW. <br /> 2. SMALLER DIAMETER BRANCH LINES MAY NOT BE USED TO BRACE MAIN LINES <br /> SECTION AT � <br /> PIPE SEISMIC BRACING ( <br /> SCALE: 3°=1-0" S547 S547 <br /> • <br /> . . „ , - l<Pmff ISSUED.FOR' - <br /> 1601 5th Avenue,Suite 1600 CONSTRUCTION . <br /> _ Seattle.WA 98101 <br /> zasszzsazz DESIGN BY KPFF DATE 06.27.2022 <br /> www.kpff.cam <br /> SYM REVISION BY APPROVED DATE SYM ENSIGN • BY APPROVED DAlE DRAWN DATE SUBIIRE CURRENT REVISION SYMBOL DATE <br /> _ �,ARIE�, ACCEPTABILITY B.RONIA o6.v.zo22 STEEL DETAILS W5523782 ORIG. .. 06.27.2022 <br /> ORIG 767 VERTICAL PAINT BOOTH VENTILATION-PHASE 2 W5523782 KPIF EHG 06.27.2022 vYA,OT nsy4 00 THIS DESIGN AND/OR L.BERG <br /> R G _ <br /> ,•� c" Na.,..; SPECIFICATION 5 APPROVED L.BERG 06.27.2022 SHEET <br /> ® APPROVED BY DEFY DATE LNGIBNEEG TR' 767 VERTICAL PAINT BOOTH VENTILATION PHASE 2 <br /> Ali 44' ; -. LHBERG . 06.27.2022 S547 <br /> —.... • _ = a• BUILDING JOB N0. _ <br /> �� W5523782= <br /> 9'9 I APPROVED 0627.2022 COMR NO .. <br /> ........,:1...,. -:.- ._ • ,..,..3_.:1,.�_. _. r —. f_.GEOI;GF `.:o_ez O22_ .. .. <br />�Y+ .. 5^'�f.. :•.�..�... .,.._ .. �s:C,_ �1G w .. ..___. ....APPRf1VF11 . ....__. ti.... ____ <br />