Laserfiche WebLink
• <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/25/2022 10/25/2022 FIRE 03-BLDG FINAL BILL ARMSTRONG APPROVAL eTRAKiT Inspection Request <br /> FOR FIRE <br /> Notes: <br /> 10/22/2022 8:02 AM Nathan Collord <br /> Contact Name:Nathan Collord <br /> Site Address:10 SE EVERETT MALL WAY <br /> Phone:2062559554 <br /> e-Mail:collordnathan@gmail.com <br /> 10/25/2022 10/25/2022 BLDG 13-CEILING KURT KECK NOT READY eTRAKiT Inspection Request <br /> GRID <br /> Notes: <br /> 10/24/2022 3:24 PM Nathan Collord <br /> Contact Name: Nathan Collord <br /> Site Address:10 SE EVERETT MALL WAY <br /> Phone:2062559554 <br /> e-Mail:collordnathan@gmail.com <br /> Complete all inspections on sub permits above grid.Note:I left a permit tree with the contractor. NO NOT COVER <br /> 10/27/2022 10/27/2022 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 10/25/2022 10:20 AM Nathan Collord <br /> Contact Name:Nathan Collord <br /> Site Address: 10 SE EVERETT MALL WAY <br /> Phone:2062559554 <br /> e-Mail:collordnathan@gmail.com <br /> kmk changed Inspection Date/Time from 10/26/2022 to 10/27/2022 <br /> kmk changed Inspection Date/Time from 10/26/2022 to 10/27/2022 <br /> Obtain finals on all sub permits <br /> Reschedule for building final when ready <br /> 10/28/2022 10/28/2022 TEMP CERTIFICATE BLDG INSPECTOR APPROVAL TCO 30 days <br /> OF OCCUPANCY <br /> Notes: <br /> 10/27/2022 7:38 PM Jerina Pillert <br /> Contact Name:Jerina Pillert <br /> Site Address:10 SE EVERETT MALL WAY <br /> Phone:5042315918 <br /> e-Mail:jerina@seattlehashtag.com <br /> TCO 30 days <br /> Note:Complete mechanical final. <br /> Reschedule building final when ready <br /> Printed:Wednesday,30 November, 2022 3 of 4 suPERiov <br />