My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2025-08-15
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 7:57:05 AM
Creation date
4/6/2023 12:02:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />F <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br />Sitts & Hill Engineers, Inc. <br />Job Number 17,710 <br />. Washout facilities shall be maintained to provide adequate holding capacity with a <br />minimum freeboard of 12 inches. <br />. Washout facilities must be cleaned, or new facilities must be constructed and <br />ready for use once the washout is 75% full. <br />. If the washout is nearing capacity, vacuum and dispose of the waste material in an <br />approved manner. <br />. Do not discharge liquid or slurry to waterways, storm drains or directly onto <br />ground. <br />. Do not use sanitary sewer without local approval. <br />. Place a secure, non -collapsing, non -water collecting cover over the concrete <br />washout facility prior to predicted wet weather to prevent accumulation and <br />overflow of precipitation. <br />. Remove and dispose of hardened concrete and return the structure to a func- <br />tional condition. Concrete may be reused on -site or hauled away for disposal <br />or recycling. <br />. When you remove materials from the self -installed concrete washout, build a new <br />structure; or, if the previous structure is still intact, inspect for signs of weakening or <br />damage, and make any necessary repairs. Re -line the structure with new plastic <br />after each cleaning. <br />Removal of Temporary Concrete Washout Facilities <br />. When temporary concrete washout facilities are no longer required for the work, <br />the hardened concrete, slurries and liquids shall be removed and properly dis- <br />posed of. <br />. Materials used to construct temporary concrete washout facilities shall be removed <br />from the site of the work and disposed of or recycled. <br />. Holes, depressions or other ground disturbance caused by the removal of the tem- <br />porary concrete washout facilities shall be backfilled, repaired, and stabilized to <br />prevent erosion. <br />2014 Stormwater Management Manual for Westem Washington <br />Volume ll - Chapter 4 - Page 321 <br />SITTS & HILL ENGINEERS, INC. 56 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.